• 제목/요약/키워드: main line

검색결과 2,225건 처리시간 0.033초

혼류 조립 라인에 batch 단위로 부품을 공급하는 단위 작업장의 생산계획 수립 (A batch scheduling scheme for the workcenters that supply parts to mixed-model assembly lines)

  • 백종관;백준걸;김성식
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.369-372
    • /
    • 1996
  • The factory under this study consists of mixed-model assembly lines and workcenters which provide parts to the main lines. Parts produced by the workcenter have different specifications for different product models. The workcenters fabricate parts in batches, and they are divided into two types. A type 1 center supplies parts only to the main line that is designated to the center while type 2 center provides parts to all the main lines. The purpose of this study is to develop a scheduling scheme for the workcenter, and the main objective of the schedules is to provide parts for the main lines without delay. The facts that make the scheduling challengeable are that 1) the different models existing together on a main line request different parts, 2) the spaces for part inventories are limited and 3) set up times are sequence dependent and long in some cases. This study presents developed scheduling schemes for the type 1 center and explains the scheduling and control structure used.

  • PDF

탄두의 콘크리트 표적관통 시 주장약에 전파되는 압력의 수치해석 (Numerical Analysis of Pressure Propagation to the Main Charge by Warhead Penetration into Concrete Targets)

  • 윤경재;유요한
    • 한국군사과학기술학회지
    • /
    • 제19권3호
    • /
    • pp.339-345
    • /
    • 2016
  • This paper is concerned with the numerical simulation result of pressure propagation to the main charge by warhead penetration into concrete targets. In this study, we developed on-line pressure measurement method in the main charge during warhead penetration. Using the on-line pressure measurement method, we successfully recorded the pressure-time history in the main charge during the field penetration test. Then we compared result of numerical simulations with test data and found that the simulation results are in good agreement with the test results. Finally, through the numerical calculations it is concluded that the installation of liner is effective in reducing pressure level produced in the main charge.

가압경수로 주증기관 파단시 증기발생기 2차측 과도 열수력 응답에 미치는 오리피스형 유량제한기의 영향 (EFFECTS OF AN ORIFICE-TYPE FLOW RESTRICTOR ON THE TRANSIENT THERMAL-HYDRAULIC RESPONSE OF THE SECONDARY SIDE OF A PWR STEAM GENERATOR TO A MAIN STEAM LINE BREAK)

  • 조종철;민복기
    • 한국전산유체공학회지
    • /
    • 제20권3호
    • /
    • pp.87-93
    • /
    • 2015
  • In this study, a numerical analysis was performed to simulate the thermal-hydraulic response of the secondary side of a steam generator(SG) model equipped with an orifice-type SG outlet flow restrictor to a main steam line break(MSLB) at a pressurized water reactor(PWR) plant. The SG analysis model includes the SG upper steam space and the part of the main steam pipe between the SG outlet and the broken pipe end. By comparing the numerical calculation results for the present SG model to those obtained for a simple SG model having no flow restrictor, the effects of the flow restrictor on the thermal-hydraulic response of SG to the MSLB were investigated.

무선방식에 의한 전자계산기 On-Line 계통의 설계에 관한 연구 (A Study on the On-Line Computer Systems using the Radio Communications)

  • 김용득;박계태
    • 대한전자공학회논문지
    • /
    • 제16권1호
    • /
    • pp.14-21
    • /
    • 1979
  • 본 논문에서는 FSK 통신을 사용한 전자계산기의 On-Line 계통에서의 오차를 연구하였으며 수신측의 발광주파수 피상을 송신측에 일치시키는 회로를 설계함으로써 4 % 이내의 주파수 편이에서도 동작이 가능하게 하였다. 또한 On-Line 계통에서 비트 오차를 계산하기 위하여는 Micro-processor를 사용하였고, 발생된 대부분의 오차는 FSK 통신계통에 의한 것이었으며, 본 연구에서 설계한 방식을 사용함으로써 완위레지스터에서 마이브로프로서로 입력되는 오차는 매우 적게 되었다.

  • PDF

액체로켓엔진의 공압류 라우팅 개념 설계 (Conceptual Design of Penumatic System Routing for Liquid Rocket Engine)

  • 김옥구;박순영;정은환
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2017년도 제48회 춘계학술대회논문집
    • /
    • pp.1112-1114
    • /
    • 2017
  • 액체 로켓 엔진은 채택되는 사이클, 하드웨어 구성, 기능 구현상의 짐벌 타입 등에 의해 구성품 배치와 레이아웃의 라우팅이 결정된다. 본 논문에서는 액체로켓엔진에 장착되는 주요 구성품을 기준으로 구동을 담당하는 헬륨(He) 공급 공압라인, 각종 퍼지 공압라인, 주 점화라인 등의 주요 유공압 라인의 개념 라우팅을 수행하였다.

  • PDF

초전도 한류기를 주변압기 접지선에 설치시 배전계통의 순간전압품질 분석 (Voltage Quality Analysis in Power Distribution System with Superconducting Fault Current Limiter at Grounding Line)

  • 문종필
    • 전기학회논문지P
    • /
    • 제62권4호
    • /
    • pp.159-163
    • /
    • 2013
  • In this paper, voltage quality improvement is analyzed in case of Superconducting Fault Current Limiter (SFCL) installed in grounding line of main transformer in power distribution system. First, a resistive-type SFCL model is used. Next, Korean power distribution system is modeled. Finally, when SFCL is installed in the starting point of feeder and grounding line of main transformer, voltage qualities are evaluated according to various fault locations and resistance values of SFCL using PSCAD/EMTDC. The voltage quality results in case of grounding line are compared with the voltage in case of feeder.

노선별 철도기상사고의 통계적 특성 및 사례분석 (Case Analysis and Statistical Characteristics of a Railroad Weather-Related Accidents and Incidents each Railroad Line in the Korean Peninsula)

  • 박종길;정우식;이재수;김은별
    • 한국철도학회논문집
    • /
    • 제14권1호
    • /
    • pp.73-79
    • /
    • 2011
  • 본 연구는 기상현상에 의해 발생하는 노선별 철도기상사고의 통계적 특성을 밝혀 철도기상사고를 저감하고 향후 기후변화에 대비하고자 한다. 이를 위해 사용한 자료는 KROIS 자료와 철도사고분석보고서를 주로 이용하였으며 그 결과는 다음과 같다. 철도기상사고에 가장 취약한 노선은 경부선이며, 영동선과 중앙선, 태백선도 취약한 지역이라 할 수 있다. 철도기상사고의 종류는 선로장애, 신호장애, 급전장애 순으로 나타났으며, 선로 장애의 2차 원인은 노선별로 약간 차이는 있었으나 노반유실이 대부분이었고, 한랭전선을 동반한 기상패턴은 단시간의 집중호우로 철도기상사고를 일으키는 주요 기상패턴임을 알 수 있었다.

THROUGHPUT ANALYSIS OF TWO-STAGE MANUFACTURING SYSTEMS WITH MERGE AND BLOCKING

  • Shin, Yang Woo;Moon, Dug Hee
    • Journal of applied mathematics & informatics
    • /
    • 제33권1_2호
    • /
    • pp.77-87
    • /
    • 2015
  • Parallel lines are often used to increase production rate in many manufacturing systems where the main line splits into several lines in parallel, and after some operations, they merge into a main line again. Queueing networks with finite buffers have been widely used for modeling and analyzing manufacturing systems. This paper provides an approximation technique for multi-server two-stage networks with merge configuration and blocking which will be a building block for analysis of general manufacturing systems with parallel lines and merge configuration. The main idea of the method is to decompose the original system into subsystems that have two service stations with multiple servers, two buffers and external arrivals to the second stage are allowed. The subsystems are modeled by level dependent quasi-birth-and-death (LDQBD) process.

철도차량 주행안전성관련 미국 연방법규(CFR)에 따른 본선 Speed Qualification Test 개요 (The introduction of Speed Qualification Test as regulated by US CFR regarding railway running safety)

  • 이강운
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1-5
    • /
    • 2010
  • The Hyundai Rotem company is due to be conducted the main line Speed Qualification Test as regulated by CFR for SEPTA EMU and SCRRA Bi-level coach project. The regulated test items per 49CFR213.345 are wheel/rail interaction forces and carbody/truck accelerations during running on main line. Therefore the special two sets of instrumented wheelset (IWS) per each project have been made for measuring the interaction forces between wheel and rail at four wheels of one truck during running on main line. In this paper, regarding Speed Qualification Test, the required test items and data analysis method per 49CFR213.345 and the preparation status of instrumented wheelsets (IWS) are introduced.

  • PDF

A Three-Phase Line-Interactive UPS System to Eliminate the Inrush Current Phenomenon during Switching-in of an Auxiliary Load while Powering the Main Load

  • Bukhari, Syed Sabir Hussain;Ayub, Muhammad;Kwon, Byung-il
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권4호
    • /
    • pp.1623-1630
    • /
    • 2018
  • Normally, various auxiliary loads are installed along with the main load in industrial applications. Usually, load transformers are used to convey such types of auxiliary loads. The transformers become energized when the loads are turned-on, consequently, high amplitude of inrush current appears at the output of the uninterrupted power supply (UPS) system. To mitigate these high current amplitudes, this manuscript suggests a three-phase line-interactive UPS system to counter the inrush current during the turning-on of the auxiliary load transformer while powering the main load by using a current controlled inverter. Experimental results of a laboratory-sized prototype are provided in the support of the proposed UPS system for validation.