• Title/Summary/Keyword: loading period

Search Result 634, Processing Time 0.029 seconds

A resonance frequency analysis of sandblasted and acid-etched implants with different diameters: a prospective clinical study during the initial healing period

  • Kim, Hyun-Joo;Kim, Yeun-Kang;Joo, Ji-Young;Lee, Ju-Youn
    • Journal of Periodontal and Implant Science
    • /
    • v.47 no.2
    • /
    • pp.106-115
    • /
    • 2017
  • Purpose: The possibility of immediate or early loading has become popular in implant dentistry. A prerequisite for the immediate or early loading of an implant prosthesis is the achievement of initial stability in the implant. Moreover, in response to clinicians' interest in verifying clinical stability to determine the optimal time point for functional loading, a non-invasive method to assess implant stability has been developed on the basis of resonance frequency analysis (RFA). The primary objective of this study was to monitor the stability of sandblasted, large-grit, and acid-etched (SLA) implants with different diameters during the early phases of healing by RFA. The secondary objective was to evaluate how the initial stability of implants varied depending on different surface modifications and other contributing factors. Methods: Thirty-five implants (25 SLA implants and 10 resorbable blasting media [RBM] implants) placed in 20 subjects were included. To measure implant stability, RFA was performed at baseline and at 1, 2, 3, 4, 6, and 10 weeks after surgery. Results: The longitudinal changes in the implant stability quotient (ISQ) values were similar for the SLA implants with different diameters and for the RBM implants. During the initial healing period, the ISQ decreased after installation and reached its lowest values at 1 week and 2 weeks, respectively. The mean ISQ values in the SLA implants were significantly higher in ${\varnothing}5.0mm$ implants than in ${\varnothing}4.0mm$ implants. Men showed a higher ISQ than women. Mandibular sites showed a higher ISQ than maxillary sites. Conclusions: All implants used in this study are suitable for immediate or early loading under appropriate indications. A wider diameter and SLA surface treatment of implants could improve the stability, if the implant is fixed with at least 30 Ncm of insertion torque.

A Study on the Final Evaluation Criteria of Allocation Exceedance Regional in Total Maximum Daily Load (오염총량관리 할당부하량 초과지역의 최종 평가기준에 관한 연구)

  • Oh, Seung Young;Han, Mideok;Kim, Seok Gyu;Ahn, Ki Hong;Kim, Oksun;Kim, Yong Seok;Park, Ji Hyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.5
    • /
    • pp.450-457
    • /
    • 2016
  • The Total Maximum Daily Load (TMDL) is a watershed management system that involves the establishment of the target water quality, the calculation of permission loading (allocation loading), and the control of total pollutants for each unit watershed. Allocation loading is assessed through the comprehensive implementation assessment of the previous year's plan. Assessment results are used for follow-up management measures such as the limit of development and updating of TMDL Management Implementation Plans for the next planning period. Although detailed assessment criteria are important, they are not currently available. Therefore, we suggested assessment criteria by comparing two methods('integration method' and 'separation method') using combination point and non-point discharge loading. We also examined the penalty criteria considering controllable load local government and updating methods of the TMDL Management Implementation Plan for the next planning period.

Characteristic of Fatigue Properties with Tension and Bending Loading Using High Strength Steel Wire (고강도 강선의 인장 및 회전굽힘 피로특성)

  • U, Byeong-Cheol;Kim, Sang-Su;Kim, Byeong-Geol;Seo, Chang-Min
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.25 no.1
    • /
    • pp.161-167
    • /
    • 2001
  • The overhead transmission wires operating both at warm temperature and tighten state for a long period of time in a power transmission plant are degraded by air pollution, wind, creep and slip between steel wire and aluminium conductor. The objective of this study is to investigate to investigate the characteristics of fatigue properties with tension and bending loading of a high carbon steel wire. The fatigue behaviors have been carried out by tension-tension, 4 points bending and 3 points bending loading. In the present study, a conventional fatigue strengths between 4 points bending and tension-tension fatigue were determined by Gerber, Sorderberg and Goodmans theory and we investigated S-N diagram for bending and tensile loading.

Immediate placement and functional loading of implants on canine with fixed partial denture for a patient having canine protected occlusion: a case report

  • Hong, Jun-Won;Ahn, Seung-Geun;Leem, Dae-Ho;Seo, Jae-Min
    • The Journal of Advanced Prosthodontics
    • /
    • v.4 no.1
    • /
    • pp.52-56
    • /
    • 2012
  • Conventional implant protocols required a load-free healing period of three to six months between placement and functional loading of the implants. Many efforts have been made to minimize the duration of treatment time. Several literatures have documented immediate function with provisional or definitive prosthesis within a week of the placement in response to these demands. In addition, immediate implant placement has advantages such as shortened treatment time and preservation of soft tissue architectures. This article presents immediate implant placement into fresh extraction sockets followed by functional immediate loading with provisional prosthesis on canine and premolars for a patient having canine protected occlusion.

Structural Behavior of RC Roof Slab under Cyclic Temperature Load (반복 일사하중에 대한 철근콘크리트 지붕슬래브의 구조적 거동)

  • Seo, Soo-Yeon;Yoon, Seung-Joe;Cho, Yong-Man;Choi, Gi-Bong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.67-74
    • /
    • 2010
  • A variation of temperature acting on a RC roof slab causes a change of stress in concrete since it expands during summer and is compressed during winter. This behavior repeats annually and makes an affection to the structural capacity of member for both serviceability and ultimate level. In this paper, a cyclic temperature loading variation is calculated by analyzing the weather data of Korea for 20 years. In addition, an experimental work is planned to find the long term effect of temperature variation. Six RC slab are made with same dimension. Test parameters are loading duration (10, 20, 30 year) and whether it has pre-damage or not. Observation of stiffness variations according to cyclic loading period shows that the serious stiffness drop happens after 10 year's cyclic loading at summer while after 30 year's loading at winter. From the fracture test about slabs damaged by long term cyclic loading, however, the capacity of member such as initial stiffness and maximum strength were not changed except yield strength according to the period of long term cyclic loading. The yield strength tends to decrease after 20 year's cyclic loading.

Operation Characteristics of the SBR Process with Electro-Flotation (EF) as Solids-liquid Separation Method (전해부상을 고액분리 방법으로 적용한 SBR 공정의 운전 특성)

  • Park, Minjeong;Choi, Younggyun
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.3
    • /
    • pp.340-344
    • /
    • 2008
  • Electro-flotation (EF) was applied to a sequencing batch reactor process (SBR) in order to enhance solids-liquid separation. Solids-liquid separation was good enough in the SBR coupled with EF (EF-SBR) and it was possible to maintain the concentration of mixed liquor suspended solids (MLSS) high in the EF-SBR. Under moderate organic loading condition (COD loading rate: 6 g/day), control SBR (C-SBR) showed similar treatment efficiencies with the EF-SBR. Under high organic loading condition (COD loading rate: 9.6 g/day), the solids-liquid separation in the C-SBR was deteriorated due to proliferation of filamentous bulking organisms at high F/M ratio. However, the EF-SBR was operated stably and with the high MLSS concentration (above 4,000 mg/L) regardless of the organic loading conditions during overall operating period leading to the satisfactory effluent quality. Gas production rate of the electrodes was gradually decreased because of anodic corrosion and scale build-up at the surface of cathode. However it could be partially overcome by use of corrosion-proof electrode material (SUS-316 L) and by periodic current switching between the electrodes.

Retrospective Study of Success Rate of the $XiVE^{(R)}$ Implant;Early evaluation of clinical performance (($XiVE^{(R)}$ 임프란트의 성공률에 관한 후향적 연구;임상성적에 관한 조기평가)

  • Park, Jin-Woo
    • Journal of Periodontal and Implant Science
    • /
    • v.35 no.1
    • /
    • pp.65-76
    • /
    • 2005
  • This retrospective study evaluates the clinical performance of the recently introduced $XiVE^{(R)}$ implant(Dentsply-Friadent) with a new macro-design to improve primary stability. A total of 208 $XiVE^{(R)}$ implants (101 in the maxilla and 107 in the mandible) were placed in 71 patients. The average age of the patients was 49 years. Of the 208 implants, 190 (91.3%) were posterior implants and 82 (39.4%) were placed in compromised sites (grafted sites). Clinical and radiographic evaluation were made at second stage surgery for exposure and after functional loading. 192 implants in 64 patients were evaluated at exposure and 146 implants in 50 patients were loaded (average 170 days-loading) and evaluated after functional loading. Of 192 implants available for evaluation before loading, 3 implants failed (early failure) ; 1 before exposure, 1 at exposure and 1 during prosthetic procedure. 2 implants were in the maxilla and 1 was in the mandible. The success rate before loading was 98.4%. After functional loading, no implant failure was occurred in 146 implants evaluated during this period (100% interval success rate). This preliminary data with a new implant showed excellent success rate although the majority of implants evaluated in this study were placed in the posterior region of the jaw and compromised sites.

A Ternary Polymeric Matrix System for Controlled Drug Delivery of Highly Soluble Drug with High Drug Loading : Diltiazem Hydrochloride (염산 딜티아젬의 방출을 제어하기 위한 삼중 폴리머 매트릭스 시스템)

  • Kim, Hyun-Jo;Fassihi, Reza
    • Journal of Pharmaceutical Investigation
    • /
    • v.31 no.1
    • /
    • pp.19-25
    • /
    • 2001
  • The purpose of this study was to use a ternary polymeric matrix system for high drug loading of a highly soluble drug for controlled release delivery. The controlled drug delivery of diltiazem HCl (solubility > 50% in water at $25^{\circ}C$) with high loading dose (the final loading dose of drug was 34%) from a ternary polymeric matrix (gelatin, pectin, HPMC) was successfully accomplished. This simple monolithic system with 240 mg drug loading provided near zero-order release over a 24 hour-period by which time the system was completely dissolved. The release kinetics of diltiazem HCl tablet with high loading dose from the designed ternary polymeric system was dependent on the ratios of HPMC : pectin binary mixture. The release rate increased as pectin : HPMC ratio were increased. Swelling behavior of the ternary system and the ionic interaction of formulation components with cationic diltiazem molecule appear to control drug diffusion and the release kinetics. Comparable release profiles between commercial product and the designed system were obtained. The binding study between gelatin with diltiazem HCl showed the presence of two binding sites for drug interaction with subsequent controlled diffusion upon swelling. This designed delivery system is easy to manufacture and drug release behavior is highly reproducible and offers advantages over the existing commercial product.

  • PDF

Laboratory Study on the Factors Affecting on Initial Anaerobic Biomass Development (혐기성 부착미생물의 초기성장에 미치는 영향인자에 관한 연구)

  • 허준무;박종안;손부순
    • Journal of environmental and Sanitary engineering
    • /
    • v.13 no.1
    • /
    • pp.185-194
    • /
    • 1998
  • Laboratory-scale investigation into initial anaerobic biofilm development was carried out by circulating mixed liquor from a steady-state anaerobic reactor through silicone tubing and then rerurning the mixed liquor to the reactor. The wall of the silicone tubing was the surface upon which anaerobic biofilm accumulation or development was monitored. Methanogenic bacteria accumulation was monitored by F$_{420}$ fluorescence (picomoles F$_{420}$/cm$^{2}$) of the extracted biofilm material. Biofilm accumulation was measured by the increase in COD of the extracted material ($\mu $g COD/cm$^{2}$). Experiments were conducted for 25 days, and biofilm analyses were performed at 5 days intervals. The results indicated that the initial rates of methangen and anaerobic biofilm accumulation increased with increasing organic loading rate and higher initial rates were observed for 15 days than 15 day liquid HRT or SRT. When the initial rates were plotted against the corresponding mixed liquor volatile suspended solids the difference between the results at the two HRT's became much less significant. Thus, the concentration of mixed liquor volatile suspended solids was found to be a very important parameter affecting initial anaerobic biofilm development. The ratio of methanogens to anaerobic biofilm was also investigated. The results showed that the ratio remained constant through the 25 days of each experiment and for high organic loading rates. Based on the results of this research, a reduction, a reduction of start-up period of anaerobic fixed film reactors might be achieved by maintaining a high organic loading and a large concentration of anaerobic microorganisms in the mixed liquor during the start-up period.

  • PDF

A systematic review of the complications of single implant-supported restorations (단일 임플란트지지 보철물의 후유증에 관한 체계적 연구)

  • Chang, Moon-Taek
    • Journal of Periodontal and Implant Science
    • /
    • v.36 no.4
    • /
    • pp.925-938
    • /
    • 2006
  • The aim of this study was to systematically investigate the complications of single implant-supported restorations followed more than 5-year. Thirty-five studies were selected for the systematic review. A total of 3932 single implants were included at the beginning of studies. Thirty-one implants were removed before loading and 91 implants after loading. The overall implant loss rate was 3.1 %. Implant losses were concentrated on the period between loading and 2-year follow-up, and, after a stable period, increased after 5-year follow-up. The mean marginal bone loss at single-tooth implants was well within 0.2 mm/year, i.e., acceptable annual bone loss by the implant success criteria. However, considerable amounts of single implants suffered a marginal bone loss at implant more than 0.2 mm/year. Fistula was a frequent biological complication in the early studies. The most frequent technical problem was a screw loosening, but its frequency was reduced after the use of a gold screw and torque controller. Within the limits of this study, the complications of single implants might be underestimated due to the lack of information about the biological and technical complications available in the relevant literature.