• 제목/요약/키워드: load margin

검색결과 254건 처리시간 0.032초

Optimal Placement for FACTS to Improve Static Voltage Stability

  • Gu, Min-Yan;Baek, Young-Sik
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권3호
    • /
    • pp.141-145
    • /
    • 2004
  • FACTS devices, such as the Thyristor Controlled Series Compensator (TCSC) and Static Var Compensators (SVC), can help increase system load margin to improve static voltage stability. In power systems, because of the high cost and the effect value, the optimal placement for FACTS devices must be determined. This paper investigates the use of the series device (SVC) and the parallel device (TCSC) from the point of load margin to increase voltage stability. It considers the sensitivity of load margin to the line reactance and eigenvector of the collapse. The study has been carried out on the IEEE 14 Bus Test System to verify the validity and efficiency of the method. It reveals that incorporation of FACTS devices significantly enhance load margin as well as system stability.

Application of Margin of Safety Considering Regional Characteristics for the Management of Total Maximum Daily Loads (지역특성을 고려한 수질오염총량관리 안전부하량 적용)

  • Park, Jun Dae;Oh, Seung Young;Kim, Yong Seok
    • Journal of Korean Society on Water Environment
    • /
    • 제30권3호
    • /
    • pp.351-360
    • /
    • 2014
  • The allocation of margin of safety (MOS) at a uniform rate to all areas of the unit watershed makes it very difficult to keep the load allotment stable in the area for lack of reduction measures like forest land. This study developed an equation to calculate margin of safety differentially according to the regional characteristics. The equation was formulated on the basis of the regional characteristic factors such as a load contribution factor for land use type and a site conversion factor for the unit watershed. The load contribution factor represents a contribution of loads from a particular land use. The site conversion factor was derived from the site conversion ratio of a unit watershed. Margin of safety for the non-point pollution load in the land use sector decreased by 20~25% in three river basins. The margin of safety in the unit watersheds with low site occupation ratios decreased in high rate, while in the unit watersheds with large urban area decreased in low rate. With the application of the differential margin of safety considering regional characteristics, not only the reduction of pollution loads can become lighter but also it can be easier to develop plans for Total Maximum Daily Loads (TMDLs) even where the reduction measures are not available.

A Study on Improved Allocations of Permissible Water Pollution Load at the Implementing Stage of Tatal Water Pollution Load Management Plan (수질오염총량관리계획의 시행단계에서 오염부하량 할당방안 개선에 관한 연구)

  • Kim Sie-Heon;Rim Jay-Myung
    • Journal of environmental and Sanitary engineering
    • /
    • 제20권3호
    • /
    • pp.51-56
    • /
    • 2005
  • Allocation of water pollution load from loading capacity can be much essential, controversial, and its standards can be applied case-by-case to the various situations. Allocation methods to point sources are generally 'Equal effluent concentration', 'Equal percent Treatment', Loading capacity at planning stage consists of basic pollution load, development pollution load, reserved pollution load and margin of safety. But at the implementing stage loading capacity can be consisted of allocatable load and margin of safety to give more flexibility in the total water pollution load management plan. In that case, we can re-adjust and altogether use the pollution load of point sources of series and non-point sources at the implementing stage.

A Study on Decentralized under Voltage Load Shedding Scheme for Preventing Wide-area Black Out (광역정전 예방을 위한 분산형 부하 제어 방안에 대한 연구)

  • Lee, Yun-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • 제63권1호
    • /
    • pp.1-6
    • /
    • 2014
  • An electric power system sometimes fails because of disturbances that occur unexpectedly, such as the uncontrolled loss of load that developed from cascading blackout. Which make stability through a little of under voltage load shedding should work. The development of phasor measurement unit(PMU) makes network supervision possible. The information obtained from PMU is synchronized by global positioning system(GPS). There are many real-time algorithms which are monitoring the voltage stability. This paper presents the study on the VILS(Voltage Instability Load Shedding) using PMU data. This algorithm computes Voltage Stability Margin Index(VSMI) continuously to track the voltage stability margin at local bus level. The VSMI is expressed as active and reactive power. The VSMI is used as an criterion for load shedding. In order to examine the algorithm is effective, applied to KEPCO system.

A Study on the Voltage Stability Control Scheme using Real-time Monitoring Data (실시간 감시 정보를 이용한 전압안정도 제어 방안에 대한 연구)

  • Lee, Yun-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • 제66권4호
    • /
    • pp.206-212
    • /
    • 2017
  • In this paper, using the power system information obtained from real-time monitoring device, to analyze the voltage stability margin index and described the voltage stability control scheme for voltage stability enhancement. Based on the utilization of the voltage stability monitoring index based on local information provided by the PMU(Phasor Measurement Unit), the purpose of the plan is to control the system stably in real time. In order to apply the load control scheme, the voltage stability margin is calculated using the data acquired through the PMU installed in each load bus. If the voltage drops below a certain level, load control is performed for each. The effectiveness of the voltage stability control measures is applied to the actual KEPCO system to analyze the effectiveness.

Operational Mode Analysis of Cooler Driver Electronics in Satellite and System Safety Margin

  • Kim, Kyudong
    • Journal of Aerospace System Engineering
    • /
    • 제14권6호
    • /
    • pp.79-84
    • /
    • 2020
  • Cooler driver electronics (CDE) for maintaining low temperature of the satellite payload IR sensor consists of a compressor that has a pulsation current load condition when it is operated. This pulsation current produces large voltage fluctuation, which affects both load and regulated bus stability. Thus, CDE power conditioning system consists of a primary bus, infrared power distribution unit for battery charging and protection, reverse current protection diode, and battery, which is used as a buffer. In this study, the operational mode analysis is performed by each part with equivalent impedance modeling verified through system level simulation. From this mode analysis, the safety margin for state of charge and open circuit voltage of the battery is determined for satisfying the minimum operational voltage of the CDE load.

A Design of Homopolar Generator System Considering Instability with Negative Characteristics Load (부성부하와의 발진을 고려한 단극발전기 시스템 설계)

  • Kim, In-Soo;Seong, Se-Jin
    • Proceedings of the KIPE Conference
    • /
    • 전력전자학회 2008년도 하계학술대회 논문집
    • /
    • pp.449-451
    • /
    • 2008
  • This paper studies the instability between homopolar generator and constant power load with negative impedance characteristics, provides the design method of homopolar generator system which overcomes the instability. In case of magnitude and phase of impedance of source and load mismatch, control instability of source can occur. For the safety of phase of load impedance, the gain of P, I controller with sufficient phase margin is applied through analysis on the simulation model of generator system, and the gain limit of load impedance is ensured by limitation of the gain margin of generator system. The stability of power system can be increased by considering and analyzing the impedance of source and load.

  • PDF

Current Status of the Feeder Demand Factor in Small Size Apartments (중소형 아파트에서의 전력간선 부하 실태)

  • Lee, Ki-Hong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 한국조명전기설비학회 2004년도 춘계학술대회 논문집
    • /
    • pp.116-118
    • /
    • 2004
  • This paper gives a measurement data of the feeder demand factor in small size apartments. The power load measurement data of the feeder shows that the feeders have $10{\sim}30[%]$ margin in capacity. But this margin is not enough to keep up with the trend of power consumption increase from long term standpoint. So it is necessary to measure the feeder power load periodically for the purpose of optimal feeder capacity estimation

  • PDF

Effect of the marginal position of prosthesis on stress distribution of teeth with abfraction lesion using finite element analysis (보철물 변연의 위치가 abfraction된 치아의 응력 분포에 미치는 영향에 대한 유한요소법적 분석)

  • Kim, Myeong-Hyeon;Lee, Cheong-Hee
    • The Journal of Korean Academy of Prosthodontics
    • /
    • 제52권3호
    • /
    • pp.202-210
    • /
    • 2014
  • Purpose: The aim of this study was to evaluate the stress concentration and distribution whether restoring the cavity or not while restoring with metal ceramic crown on tooth with abfraction lesion using finite element analysis. Materials and methods: Maxillary first premolar was selected and made a total of 10 finite element model. Model 1 was natural tooth; Model 2 was tooth with metal ceramic crown restoration which margin was positioned above 2 mm from CEJ; Model 3 was tooth with metal ceramic crown restoration which margin was positioned on CEJ; Model 4 was natural tooth which has abfraction lesion; Model 5 and 6 had abfraction lesion and the other condition was same as model 2 and 3, respectively; Model 7 was natural tooth which had abfraction lesion restored with composite resin; Model 8 and 9 was tooth with metal ceramic crown after restoring on abfraction lesion with composite resin; Model 10 was restored tooth on abfraction lesion with composite resin and metal ceramic crown restoration which margin is positioned on lower border of abfraction lesion. Load A and Load B was also designed. Von Mises value was evaluated on each point. Results: Under load A or load B, on tooth with abfraction lesion, stress was concentrated on the apex of lesion. Under load A or load B, on tooth that abfraction lesion was restored with composite resin, the stress value was reduced on the apex. Conclusion: In case of abfraction lesion was restored with composite resin, the stress was concentrated on the apical border of restored cavity regardless of marginal position. It was favorable to place crown margin on the enamel for restoring with metal ceramic crown.

A Method of Vulnerable Area Selection for Voltage Stability Using the Variation Rate of Reactive Power Margin (무효전력 여유변화를 이용한 전압안정성 취약지역 선정)

  • Cho, Yoon-Hyun;Seo, Sang-Soo;Lee, Byong-Jun;Kim, Tae-Kyun;Choo, Jin-Boo
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.251-254
    • /
    • 2003
  • A voltage stability assessment consists of the contingency screening, voltage stability analysis, and counter measures. A widely used index for the voltage stability assessment of power system is the reactive power margin. It shows some factors of voluntariness as following the status of power system and load levels for the target analyzing area. Therefore, it has a demerit that the absolute amounts of reactive power margin is not to be applied by the quantized margin criterion. This paper selects a vulnerable area by assigning the voltage instability for the particular contingency for the selection of vulnerable area in the respect of the investigation of reactive power margin or VQVI as an index of V-Q margin sensitivity in order to overcome the demerit. This will be able to grasp the V-Q margin sensitivity for the target analyzing area by presenting the ratio of power margin between the margin before and after contingency as following the calculation of reactive power margin. The presented method is applied to the voltage stability assessment for the Metropolitan area of 2003 KEPCO summer peak system.

  • PDF