• Title/Summary/Keyword: lining

Search Result 1,252, Processing Time 0.026 seconds

프리캐스트 판넬을 이용한 장대터널 내부라이닝 개선방안 연구

  • Lee, Du-Hwa;O, Se-Jun;Choe, Chang-Rim
    • 도로교통
    • /
    • s.84
    • /
    • pp.23-39
    • /
    • 2001
  • Increasing constructions of tunnels are become larger of the size and longer of the length. Construction of the tunnellinings is in poor working environment, for example, dark and narrow underground. Therefore, it is difficult to constructlining by required quality in these poor working conditions. In case of the designing tunnel in large scale, particularly, there may be several problems as follows; delay of construction due to a long time in constructing lining and difficulty of quality control. It is also indicated that longitudinal cracks of them are main defects in domestic tunnels. Therefore, in this study, the precast lining method is introduced for solving problems, which are delay of the tunnel construction a d deterioration of tunnel lining. Precast linings have mainly been constructed in Norway and North Europe. A new construction method of tunnel lining, suitable in domestic situation, is introduced by detailed case study. Also, useful materials for design and construction of Precast lining are presented.

  • PDF

Effect of Fluxes on the Wear of MgO Coating Materials for Tundish (턴디쉬용 MgO Coating 재의 손상에 미치는 Flux의 영향)

  • 홍기곤;박재원;김효준
    • Journal of the Korean Ceramic Society
    • /
    • v.34 no.7
    • /
    • pp.677-684
    • /
    • 1997
  • The effects of fluxes on MgO coating materials for tundish were investigated. As the number of charge in continuous casting was increased, the basicity of tundish slag was decreased due to the increase of silica formed by dissolution from rice hull. As a result, the wear of magnesia lining was increased. In aggregates of MgO coating materials, magnesioferrite was formed by the reaction between magnesia and ferric oxide formed by the oxidation of molten steel, while matrix parts of MgO coating materials were worn by CaO-Al2O3-SiO2 compounds. Silica in rice hull extracted to the molten slag reduced basicity of slag and formed forsterite in the result of its reaction with magnesia lining. Also, fayalite was formed from the reaction between silica and ferric oxide and it caused the increment of magnesia lining's wear. The wear of magnesia lining by flux of CaO-SiO2 was larger than that of Cao-Al2O3 and calcia in the flux increased the wear of magnesia lining through the formation of rankinite.

  • PDF

Numerical modeling of coupled structural and hydraulic interactions in tunnel linings

  • Shin, J.H.
    • Structural Engineering and Mechanics
    • /
    • v.29 no.1
    • /
    • pp.1-16
    • /
    • 2008
  • Tunnels are generally constructed below the ground water table, which produces a long-term interaction between the tunnel lining and the surrounding geo-materials. Thus, in conjunction with tunnel design, the presence of water may require a number of considerations such as: leakage and water load. It has been reported that deterioration of a drainage system of tunnels is one of the main factors governing the long-term hydraulic and structural lining-ground interaction. Therefore, the design procedure of an underwater tunnel should address any detrimental effects associated with this interaction. In this paper an attempt to identify the coupled structural and hydraulic interaction between the lining and the ground was made using a numerical method. A main concern was given to local hindrance of flow into tunnels. Six cases of local deterioration of a drainage system were considered to investigate the effects of deterioration on tunnels. It is revealed that hindrance of flow increased pore-water pressure on the deteriorated areas, and caused detrimental effects on the lining structures. The analysis results were compared with those from fully permeable and impermeable linings.

Cause Analysis for a Lining Damage in Sea Water System Piping Installed in a Korean Industrial Plant

  • Hwang, K.M.;Park, S.K.
    • Corrosion Science and Technology
    • /
    • v.20 no.1
    • /
    • pp.1-6
    • /
    • 2021
  • Many Korean industrial plants including nuclear and fossil power plants use seawater as the ultimate heat sink to cool the heat generated by various facilities. Owing to the high corrosivity of seawater, facilities and piping made of metal material in contact with seawater are coated or lined with polymeric materials to avoid direct contact with seawater. However, polymeric materials used as coating and lining have some level of permeability to water and are degraded over time. Korean industrial plants have also experienced a gradual increase in the frequency of damage to pipes in seawater systems due to prolonged operating periods. In the event of a cavitation-like phenomenon, coating or lining inside the piping is likely to be damaged faster than expected. In this paper, the cause of water leakage due to base metal damage caused by the failure of the polyester lining in seawater system piping was assessed and the experience with establishing countermeasures to prevent such damage was described.

Simplified nonlinear simulation for composite segmental lining of rectangular shield tunnels

  • Zhao, Huiling;Liu, Xian;Yuan, Yong
    • Structural Engineering and Mechanics
    • /
    • v.81 no.4
    • /
    • pp.513-522
    • /
    • 2022
  • Steel-concrete composite segments replacing the conventional reinforced concrete segments can provide the rectangular shield tunnel superiorities on bearing capacity, ductility and economy. A simplified model with high-efficiency on computation is proposed for investigating the nonlinear response of the rectangular tunnel lining composed of composite segments. The simulation model is developed by an assembly of nonlinear fiber beam elements and spring elements to express the transfer mechanism of forces through components of composite segments, and radial joints. The simulation is conducted with the considerations of material nonlinearity and geometric nonlinearity associated with the whole loading process. The validity of the model is evaluated through comparison of the proposed nonlinear simulation with results obtained from the full-scale test of the segmental tunnel lining. Furthermore, a parameter study is conducted by means of the simplified model. The results show that the stiffness of the radial joint at haunch of the ling and the thickness of inner steel plate of segments have remarkable influence on the behaviour of the lining.

A Case study on Effect of Compositeness for Temporary Bridge Integrated Lining Board and Girder (복공판과 주형을 일체화한 가설교량에 대한 합성효과 검토 사례연구)

  • Yoon, Woo-Hyun;Chung, Jee-Seung;Lee, Jong-Soon;Yoon, Yong-Seok;Yang, Sung-Don
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.2
    • /
    • pp.34-41
    • /
    • 2012
  • In this study, it has been proposed the new type of temporary bridge which is structural performance maximization to integrated cover plate and girder as well as roll of lining board. Of all temporary bridge integrated cover plate and main girder in the form of a new type of structure is advantageous for the judge, but to the field of transport difficulties and challenges due to high altitude operations to take advantage of this challenge and deliver a structured, easy transport, and the synthesis of lining board possible was proposed. Lining board proposed in this study through experimental synthesis and analysis of the factors that influence the effectiveness of the construction and economic development in the construction method was superior, compared to the conventional lining board.

Effect of new tunnel construction on structural performance of existing tunnel lining

  • Yoo, Chungsik;Cui, Shuaishuai
    • Geomechanics and Engineering
    • /
    • v.22 no.6
    • /
    • pp.497-507
    • /
    • 2020
  • This paper presents the results of a three-dimensional numerical investigation into the effect of new tunnel construction on structural performance of existing tunnel lining. A three-dimensional finite difference model, capable of modelling the tunnel construction process, was adopted to perform a parametric study on the spatial variation of new tunnel location with respect to the existing tunnel with emphasis on the plan crossing angle of the new tunnel with respect to the existing tunnel and the vertical elevation of the new tunnel with respect to the existing one. The results of the analyses were arranged so that the effect of new tunnel construction on the lining member forces and stresses of the existing tunnel can be identified. The results indicate that when a new tunnel underpasses an existing tunnel, the new tunnel construction imposes greater impact on the existing tunnel lining when the two tunnels cross at an acute angle. Also shown are that the critical plan crossing angle of the new tunnel that would impose greater impact on the existing tunnel depends on the relative vertical location of the new tunnel with respect to the existing one, and that the overpassing new tunnel construction scenario is more critical than the underpassing scenario in view of the existing tunnel lining stability. Practical implications of the findings are discussed.

A Study on the Leakage Interception Work in the Irrigation Canal Founding on the Sandy Gravel or the Porous Soil (모래자갈과 누수성 토질을 기반으로하는 용수로의 누수방지에 대한 연구)

  • 강신업
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.12 no.2
    • /
    • pp.1965-1970
    • /
    • 1970
  • The experiment was carried out in order to improve the leakage stopping work in the irrigation canal founding on the porous soil. But the experiment had many problems to be studied more owing to the insufficient time and facilities. The results obtained are summarized as follows; 1. Polyethylene film is estimated not to make strength decrease owing to buring in the subsoil, but to make owing to the sunlight. 2. Coated nylon shows the tendency to deteriorate strength when it is buried in the earth or exposed to the sun for long time, but leakage is all but impermeability generally. 3. Leakage loss rates for one hour show some differences in the canal to be full with water in accordance with operating methods, that is, the clay lining section is 12.6%, the coated nylon lining section is 1.7%, the polyethylene film lining section is 1.3%, respectively. 4. Leakage quantities per wetted perimeter unit area show $3.556cc/cm^2/hr$. in the clay lining section, $1.574cc/cm^2/hr$. in the coated nylon section, $0.695cc/cm^2/hr$. in the polyethylene film lining section, respectively. 5. When the construction fund make the clay lining section as a standard, the polyethylene film section is 92.1%, the coated nylon section is 174.2%, respectively. But, the unit cost of execution may be low when the polyethylene film and the coated nylon will enable to mass-produce for the purpose of execution.

  • PDF

A Study on Current Extent of Damage of Road Tunnel Lining in Cold Regions (Gangwon-do) (한랭지역(강원권)에서의 도로터널 라이닝부 피해 현황 연구)

  • Jin, Hyunwoo;Hwang, Youngcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.1
    • /
    • pp.49-58
    • /
    • 2017
  • Due to low annual average temperature, road tunnel lining in domestic cold region (Gangwon province) experiences durability problems. The financial and human damage due to cracks, breakout, exfoliation and water leakage increases every year. However, domestic research on effect of temperature on road tunnel lining damage is insufficient. Thus, this research has investigated 70 tunnels located in cold region (Gangwon-do) to analyze damage status. Furthermore, by contrasting damage on tunnels in relatively warm Gangneung area with those in relatively cold Hongcheon area, the effect of temperature on road tunnel lining damage was analyzed.

Nonlinear simulation of tunnel linings with a simplified numerical modelling

  • Zhao, Huiling;Liu, Xian;Bao, Yihai;Yuan, Yong
    • Structural Engineering and Mechanics
    • /
    • v.61 no.5
    • /
    • pp.593-603
    • /
    • 2017
  • A high-efficiency simplified modelling approach is proposed for investigating the nonlinear responses of reinforced concrete linings of shield tunnels. Material and geometric nonlinearities are considered in the analysis of the lining structures undergoing large deformation before ultimately losing the load-carrying capacity. A beam-spring element model is developed to capture the force-transfer mechanism between lining segments and radial joints. The developed model is validated by comparing analyzed results to experimental results of a single-ring lining structure under two loading conditions: the ground overloading and the lateral unloading respectively. The results show that the lining structure under the lateral unloading due to excavation on the both sides of the tunnel is more vulnerable compared to the case of ground overloading on the top of the tunnel. A parameter study is conducted and results indicate that the lateral pressure coefficient has the greatest influence on the behaviour of the lining structure.