• 제목/요약/키워드: lifting performance

검색결과 185건 처리시간 0.024초

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • 국제초고층학회논문집
    • /
    • 제11권2호
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출 (Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction)

  • 김민주;이동민;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.211-212
    • /
    • 2015
  • Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).

  • PDF

Relationship Between the Number of Hip Abduction Performance With Contralateral Adduction in Side-lying and the Lateral Pelvic Shift Distance During One-leg Lifting

  • Do-eun Lee;Jun-hee Kim;Gyeong-tae Gwak;Young-soo Weon;Oh-yun Kwon
    • 한국전문물리치료학회지
    • /
    • 제30권2호
    • /
    • pp.152-159
    • /
    • 2023
  • Background: The gluteus medius (Gmed) plays a critical role in maintaining frontal plane stability of the pelvis during functional activities, such as one-leg lifting. Side-lying hip abduction (SHA) has been used as a dynamic test to evaluate Gmed function. However, the abduction force of the lower leg against the floor is not controlled during SHA. Therefore, hip abduction performance with contralateral adduction in the side-lying position (HAPCA) can be proposed as an alternative method to assess performance of hip abduction. If the number of HAPCA is related to the lateral pelvic shift distance, a new quantitative measurement for hip abductor function may be presented. Objects: This study aimed to investigate the relationship between the number of successful HAPCA and the lateral pelvic shift distance during one-leg lifting. Methods: Thirty healthy participants were recruited, and lateral pelvic shift distance was measured during one-leg lifting test using two-dimensional analysis. The number of successful HAPCA was counted when participants touched both target bars at the beat of a metronome. Results: There was a negative correlation between the number of HAPCA and lateral pelvic shift distance during one-leg lifting (r = -0.630, p < 0.05). The number of HAPCA accounted for 39.7% of the variance in the lateral pelvic shift distance during one-leg lifting (F = 18.454, p < 0.001). Conclusion: The number of successful HAPCA is significantly correlated with lateral pelvic shift distance during one-leg lifting. This finding suggests that HAPCA can be proposed as a new measurement for hip abductor performance and more research is needed on its relationship with hip abductor strength.

철골공사에서의 타워크레인 양중계획 프로세스에 관한 연구 (A Study on the Process of Tower Crane Construction Planning in Steel Structure)

  • 정덕기;박정로;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.145-146
    • /
    • 2011
  • Lifting plan in conjunction with the overall construction plan will be established. It is being created by executive director of the Corporation and other such as an experienced site manager. But, written lifting plan based on the limited information and experience is causing some problems such as decreasing productivity, workability loss, delay. The reasons for the problems are lack of prediction of construction execution, inappropriate materials on the past performance, individual experience, limits of knowledge, lack of technical materials, shortage of advisor. Therefore, to solve the problems, we have to overcome the situation in which we depends on lifting planner's experience and intuition, limited information by accumulating objective and reliable materials. Because unorganized lifting plan will lower efficiency of lifting equipment and make reducing construction period difficult. In this study, influence factors on lifting plans will be derived through reviewing literatures and lifting plan cases. Derived influence factors will be classified as components and classes, classified influence factors are assessed suitability. Also, Decision making items are derived from the factors. Finally, tower crane lifting plan process will be suggested from the result.

  • PDF

인명구조용 소방대원 근력지원장치의 양중성능 및 내환경 시험 방법 (The test methods of Lifting performance and Environmental resistance tests using power assist device for a fireman to rescue humans)

  • Lee, Minsu;Park, Chan;Lee, Seonmin;Lee, Dongeun
    • 한국재난정보학회 논문집
    • /
    • 제13권3호
    • /
    • pp.358-365
    • /
    • 2017
  • 전세계적으로 재난에 의한 피해가 급증하면서 인명피해를 줄이기 위한 장비에 대한 기술 개발이 필요한 실정이다. 이에 소방안전 및 119구조 구급기술연구개발사업의 지원으로 "인명구조용 소방대원 근력지원장치 개발(2015 ~ 2018)" 과제를 통하여 재난환경 및 재난 대응 시나리오를 고려한 리프팅 성능(양중하중 100 kg 이상, 양중높이 1 m 이상, 양중거리 60 cm 이상, 양중속도 0.2 m/s 이상)을 만족하는 장비를 개발 중에 있다. 본 연구는 장치의 유용성을 판단하기 위해 양중성능 및 내환경 시험법을 제안하였고, 양중성능시험의 동역학 해석을 통해 근력지원장치의 상세사양을 분석 및 검증하였다. 본 연구를 통하여 제안한 시험 방법은 근력지원장치의 안정적인 성능 구현여부를 평가하는데 실용적으로 적용할 수 있을 것으로 판단된다.

Cooperative control system of the floating cranes for the dual lifting

  • Nam, Mihee;Kim, Jinbeom;Lee, Jaechang;Kim, Daekyung;Lee, Donghyuk;Lee, Jangmyung
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제10권1호
    • /
    • pp.95-102
    • /
    • 2018
  • This paper proposes a dual lifting and its cooperative control system with two different kinds of floating cranes. The Mega-erection and Giga-erection in the ship building are used to handle heavier and wider blocks and modules as ships and off-shore platforms are enlarged. However, there is no equipment to handle such Tera-blocks. In order to overcome the limit on performance of existing floating cranes, the dual lifting is proposed in this research. In the dual lifting, two floating cranes are well-coordinated to add up the lift capabilities of both cranes without any loss such that virtually a single crane is lifting, maneuvering and unloading. Two main constraints for the dual lifting are as follows: First, two barges of floating cranes should be constrained as a rigid body not to cause a relative motion between two barges and main hooks of the two cranes should be controlled as main hooks of a single crane. In order words, it is necessary to develop the cooperative control of two floating cranes in order to sustain a center of gravity of the module and minimize the tilting angle during the lifting and unloading by the two floating cranes. Two floating cranes are handled as a master-slave system. The master crane is able to gather information about all working conditions and make a decision to control the individual hook speed, which communicates the slave crane by TCP/IP. The developed control system has been embedded in the real floating crane systems and the dual lifting has been demonstrated five times at SHI shipyard in 2015. The moving angles of the lifting module are analyzed and verified to be suitable for hoisting control. It is verified that the dual lifting can be applied for many heavier and wider blocks and modules to shorten the construction time of ships and off-shore platforms.

Development of a hydraulic power transmission system for the 3-point hitch of 50-kW narrow tractors

  • Chung, Sun-Ok;Kim, Yong-Joo;Choi, Moon-Chan;Lee, Kyu-Ho;Ha, Jong-Kyou;Kang, Tae-Kyoung;Kim, Young-Keun
    • 농업과학연구
    • /
    • 제43권3호
    • /
    • pp.450-458
    • /
    • 2016
  • High performance small and mid-sized tractors are required for dryland and orchard operations. A power transmission system is the most important issue for the design of high performance tractors. Many operations, such as loading and lifting, use hydraulic power. In the present study, a hydraulic power transmission system for the 3-point hitch of a 50 kW narrow tractor was developed and its performance was evaluated. First, major components were designed based on target design parameters. Target operations were spraying, weeding, and transportation. Main design parameters were determined through mathematical calculation and computer simulation. The capacity of the hydraulic cylinder was calculated taking the lifting force required for the weight of the implements into consideration. Then, a prototype was fabricated. Major components were the lifting valve, hydraulic cylinder, and 3-point hitch. Finally, performance was evaluated through laboratory tests. Tests were conducted using load weights, lift arm sensor, and lift arm height from the ground. Test results showed that the lifting force was in the range of 23.5 - 29.4 kN. This force was greater than lifting forces of competing foreign tractors by 3.9 - 4.9 kN. These results satisfied the design target value of 20.6 kN, determined by survey of advanced foreign products. The prototype will be commercialized after revision based on various field tests. Improvement of reliability should be also achieved.

탑재용 러그 구조의 설계 시스템 개발 (Development of the Design System for the Lifting Lug Structure)

  • 함주혁
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2000년도 춘계학술대회 논문집
    • /
    • pp.189-194
    • /
    • 2000
  • Due to the rapid growth of ship building industry and increment of ship construction in Korea, several hundred thousand of lifting lugs per year, have been installed at the lifting positions of ship block and removed after finishing their function, therefore, appropriate design system for strength check or optimal design of each lug structure has been required in order to increase the capability of efficient design. In this study, design system of D-type lifting lug structure which is most popular and useful in shipyards, was developed for the purpose of initial design of lug structure. Developed system layout and graphic user interface for this design system based on the C++ language were explained step by step. Using this design system, more efficient performance of lug structural design will be expected on the windows of personal computer.

  • PDF

40m 조합모듈교량 상부구조 이송에 따른 안전성 검토 (Safety Evaluation of 40m Combined Modular Bridge Super-Structures Based on Transportation Lifting Methods)

  • 박성민;정우영
    • 복합신소재구조학회 논문집
    • /
    • 제6권2호
    • /
    • pp.77-84
    • /
    • 2015
  • The purpose of this study was the analytical safety evaluation on the super-structure of precast modular bridge using standardized modular members and robotic construction during the transportation routing and lifting conditions. In order to evaluate the safety performance of the bridge system, 3-D full scale Finite Element (FE) of 40 m standardized modular block was developed in ABAQUS, followed by the analytical study to classify the structural system according to steel girder structures: 1) modular bridge block lifting method including the steel girder system; 2) modular bridge block lifting method without the steel girder system. The results from the analytical study revealed that the maximum stress of each modular member was within the maximum allowable stresses during lifting condition. However, the stress concentration at the connected area was more critical in comparison to the behavior of 40 m combined modular blocks during lifting time

Lifting Scheme과 PVQ를 이용한 영상압축 기법 (An Image Compression Technique with Lifting Scheme and PVQ)

  • 정전대;김학렬;신재호
    • 한국방송∙미디어공학회:학술대회논문집
    • /
    • 한국방송공학회 1996년도 학술대회
    • /
    • pp.159-163
    • /
    • 1996
  • In this paper, a new image compression technique, which uses lifting scheme and pyramid vector quantization, is proposed. Lifting scheme is a new technique to generate wavelets and to perform wavelet transform, and pyramid vector quantization is a kind of vector quantization which dose not have codebook neither codebook generation algorithm. For the purpose of realizing more compression rate, an arithmetic entropy coder is used. Proposed algorithm is compared with other wavelet based image coder and with JPEG which uses DCT and adaptive Huffman entropy coder. Simulation results showed that the performance of proposed algorithm is much better than that of others in point of PSNR and bpp.

  • PDF