Browse > Article
http://dx.doi.org/10.1016/j.ijnaoe.2017.03.003

Cooperative control system of the floating cranes for the dual lifting  

Nam, Mihee (Robotics Related Interdisciplinary Course, Pusan National University)
Kim, Jinbeom (Central Research Institute, Samsung Heavy Industries Co., Ltd)
Lee, Jaechang (Central Research Institute, Samsung Heavy Industries Co., Ltd)
Kim, Daekyung (Central Research Institute, Samsung Heavy Industries Co., Ltd)
Lee, Donghyuk (Electronic Engineering, Pusan National University)
Lee, Jangmyung (Robotics Related Interdisciplinary Course, Pusan National University)
Publication Information
International Journal of Naval Architecture and Ocean Engineering / v.10, no.1, 2018 , pp. 95-102 More about this Journal
Abstract
This paper proposes a dual lifting and its cooperative control system with two different kinds of floating cranes. The Mega-erection and Giga-erection in the ship building are used to handle heavier and wider blocks and modules as ships and off-shore platforms are enlarged. However, there is no equipment to handle such Tera-blocks. In order to overcome the limit on performance of existing floating cranes, the dual lifting is proposed in this research. In the dual lifting, two floating cranes are well-coordinated to add up the lift capabilities of both cranes without any loss such that virtually a single crane is lifting, maneuvering and unloading. Two main constraints for the dual lifting are as follows: First, two barges of floating cranes should be constrained as a rigid body not to cause a relative motion between two barges and main hooks of the two cranes should be controlled as main hooks of a single crane. In order words, it is necessary to develop the cooperative control of two floating cranes in order to sustain a center of gravity of the module and minimize the tilting angle during the lifting and unloading by the two floating cranes. Two floating cranes are handled as a master-slave system. The master crane is able to gather information about all working conditions and make a decision to control the individual hook speed, which communicates the slave crane by TCP/IP. The developed control system has been embedded in the real floating crane systems and the dual lifting has been demonstrated five times at SHI shipyard in 2015. The moving angles of the lifting module are analyzed and verified to be suitable for hoisting control. It is verified that the dual lifting can be applied for many heavier and wider blocks and modules to shorten the construction time of ships and off-shore platforms.
Keywords
Cooperative control system; Dual lifting; Floating crane; Hoisting control; Master-slave system;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Cha, J.H., Ku, N.K., Roh, M.I., Lee, K.Y., 2012. Dynamic response simulation of a heavy cargo suspended by parallel connected floating cranes. Trans. Korean Soc. Mech. Eng. A 36 (6), 681-689.   DOI
2 GL Noble Denton Report, 2005. Guidelines for Marine Lifting & Lowering Operations.
3 Hwang, J.H., Ahn, J.I., Lee, S.B., Kim, Y.H., Choung, J.S., Ham, S.H., Lee, W.J., 2009a. Free surface procedure for lifting operation by parallel connected floating cranes using synchronized operation system and its applications to lifting operation of a heavy cargo. Special Issue of the Society of Naval Architects of Korea, pp. 197-206.
4 Hwang, J.H., Kim, Y.H., Ha, S.H., Seo, J.G., Lee, C.Y., Lee, K.Y., Park, K.P., Cha, J.H., 2009b. Guideline of weight factor for lifting operation by parallel connected floating cranes and verification using simulation. Special Issue of the Society of Naval Architects of Korea, pp. 107-114.
5 Jung, D.W., Kim, H.J., Ji, H.S., Jeong, H.S., Nam, M.H., Lee, D.Y., Kim, B.K., 2016. Development of dual-lifting technique for installation of topside mega-modules. Proc. Paper No. OMAE2016-54669, 35th OMAE Conference.
6 Samsung Heavy Industries Co., Ltd, 2007, Giga block method using many sea-cranes, Korea Patent No. 10-0718928.
7 Ku, N.K., Ha, S., Roh, M.I., 2014. Crane modeling and simulation in offshore structure building industry. Inter. J. Comput. Theory Eng. 6 (3), 278-284.   DOI