• Title/Summary/Keyword: large-scale development project

Search Result 269, Processing Time 0.023 seconds

Entropical Risk Analysis Method for Managing Project Disruptions

  • Ro, In-Kyu
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.5 no.1
    • /
    • pp.61-72
    • /
    • 1980
  • This paper is an attempt at developing a method for the analysis and estimation of the effects of project disruptions due to uncertainties. Such uncertainties may result from design changes in large-scale, complex, research and development, or construction projects. An entropical risk analysis method is developed. The method is able to estimate the project capacity to handle equivocation due to design changes and the effects of project disruptions. In an attempt to evaluate the predictive capability of the method, it is compared with the results obtained by a computer Monte Carlo simulation program. It is shown that the entropical risk analysis method may be suggested as an expedient means of evaluating project status for management in the different stages of project execution.

  • PDF

Otemachi(大手町) Sequential Urban Redevelopment Project

  • Itoh, Toshio
    • Land and Housing Review
    • /
    • v.8 no.2
    • /
    • pp.83-89
    • /
    • 2017
  • Otemachi(大手町) is the region where it plays a pivotal role in Japanese economy as representative head offices of companies including financial insurance, general trading, information and communication newspaper media are concentrated. However, regenerating the entire region from worn-out infrastructures of buildings and city into the fresh and vibrant foothold in international business was the problem to be solved. In this situation, was examined on the basis of administrative agencies and relevant enterprises to reconstruct office buildings in phases without ceasing business functions and activities by utilizing the large-scale vacant land occurred from the relocation of the national public institutions. The independent administrative institution 'Urban Renaissance Agency(UR)' has completed the examination of industrialization and participation request for the commencement of the project. In this article, The overview of , the new form of project promoted and cooperated by officials and people, is introduced by UR (Urban Renaissance Agency) reorganizing the land exchange and infrastructure through the land readjustment project, and at the same time, procuring capital and building office buildings in solidarity with private development enterprises and financial institutions.

A Study on the Application of Agile Methodology to Improve Software Development Quality

  • Kim, Hee Wan
    • International journal of advanced smart convergence
    • /
    • v.9 no.3
    • /
    • pp.59-70
    • /
    • 2020
  • There are many limitations in applying agile methodology to projects so far. In fact, projects overlap with other development methodologies and management processes, resulting in confusing progress, while there are often cases where the benefits of agile cannot be embraced due to a lack of understanding of agile processes and the organization's inability to adapt to change. It is an important role of information system development to improve the quality of agile application projects by discovering the problems and improvements in these cases. In this paper, we analyze the differences between existing development and project management methods and agile, and analyze agile processes. The optimal agile methodology was proposed by analyzing and applying methodologies established and applied mainly by large domestic development companies. In addition, the effectiveness was verified through a questionnaire of IT experts, and the result of the questionnaire was verified to be 4.75 points on a 5-point scale.

차세대 고속전철 시스템 시험검증 체계 구축 및 적용

  • Choe Jong Min;Yu Il Sang;Kim Yeon Tae;Park Yeong Won
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.1079-1084
    • /
    • 2002
  • Systems engineering technology development program for Korea next-generation high-speed railway(KNHR) system in progress is a national large-scale system development program that is not only a large-size and complex but also multi-disciplinary in nature. Using the RDD-IOO, a systems engineering tool, the KNHR program can establish requirements traceability and development process management in the course of development. This paper presents the results from a computer-aided systems engineering application to KNHR system technology development project over the three years of activities. The traceability among the system design database in the vertical direction of SE process, as the results of the first year and the second year research was accomplished. The database in both the requirement management domain and the project management domain was developed and set up the traceability between them in the horizontal direction of the SE process in the V model as the results of the third year research. Therefore, KNHR design database was built to support the life-cycle management of the system as well as to reuse the knowledge in future programs. In the following development phase, this database will be utilized to accomplish the test and integration activities providing a baseline database. The outcome of the study contributes to the establishment of the model-based systems engineering approach as a best practice in the accumulation and advancement of systems engineering technology for railway system development.

  • PDF

A Study on Structural Characteristics of US Urban Development Project and Flexibility of Crisis Response -Focusing on A Comparative Analysis of Hudson Yard and Yongsan International Business District Development- (미국 도시개발사업의 구조적 특징과 위기대응의 유연성 연구 -허드슨 야드 개발의 위기극복 과정을 중심으로-)

  • Lee, Woo-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.80-87
    • /
    • 2017
  • In the past, the United States has been engaged in large-scale urban development projects as a tool for urban regeneration to revitalize distressed urban areas. On the other hand, large-scale urban development projects have been stalled or discontinued globally since the 2008 economic crisis. Despite this, the Hudson Yard development, which is the subject of this study, has resumed smoothly due to the characteristics of its development structure and rational negotiation process. Most domestic developments depend on the economic circumstances, and the problems that are exposed in a privately led development are repeated; the Yongsan International Business District Development is a representative failure case. This study examined the characteristics of the business structure and the nature of the negotiation process in the Hudson Yard development project in New York City.

Development and Application of Computer Aided Systems Engineering Processes for Next Generation High Speed Railway Train (차세대 고속전철시스템 개발을 위한 시스템 엔지니어링 체계구축)

  • Yoo Il Sang;Park Young Won
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.51-56
    • /
    • 2002
  • A Korea next-generation high-speed rail system represents a typical example of large- scale multi-disciplinary systems, consisting of subsystems such as train, electrical hardware, electronics, control, Information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. The system therefore, must be developed using systems engineering that is a efficient and effective methodology to design such a complex system and manage its development. This paper presents the results from a computer-aided systems engineering application to the Korea next generation high-speed railway project. Especially, the focus of the study was on requirement management and PBS management.

  • PDF

A Research on the Core Functions and Management Level of the PMO to Improve IS Project Performance (정보시스템 개발 프로젝트 성과 향상을 위한 PMO 핵심 기능과 관리수준에 관한 연구: 금융권 차세대 프로젝트 사례를 중심으로)

  • Kim, Sang-Yeoul;Chang, Yun-Hi
    • The Journal of Information Systems
    • /
    • v.15 no.4
    • /
    • pp.1-22
    • /
    • 2006
  • Nowadays, IS projects are getting more complicated and large-scaled. Therefore, many researchers and practitioners have been interested in the IS development methodologies, automated tools, techniques, and TQM to improve IS performance. Latest Standish Group's research reported that after the PMO introduction, project scale became bulkier than 1 or 2 year ago, and that IS development project success probability was increased sharply by 62 percents from 37. The previous researches listed just various PMO functions. This research is to seize the core functions and management level of the PMO affecting on the IS project performance with banks which are the leading industry to accept the PMO in Korea. The activities in the categories of implementation management technology support management infrastructure management are the core functions of the PMO to affect the IS performance including schedule management quality management user and stakeholders' satisfaction. Also, the PMO management level is important for IS project success. Among the 5 levels PMI suggested, PMO can implement the project effectively at least at the third level. Korean companies which are about to introduce the PMO have to consider the PMO core functions and management level to increase the IS maturity.

  • PDF

COVID-19 recommender system based on an annotated multilingual corpus

  • Barros, Marcia;Ruas, Pedro;Sousa, Diana;Bangash, Ali Haider;Couto, Francisco M.
    • Genomics & Informatics
    • /
    • v.19 no.3
    • /
    • pp.24.1-24.7
    • /
    • 2021
  • Tracking the most recent advances in Coronavirus disease 2019 (COVID-19)-related research is essential, given the disease's novelty and its impact on society. However, with the publication pace speeding up, researchers and clinicians require automatic approaches to keep up with the incoming information regarding this disease. A solution to this problem requires the development of text mining pipelines; the efficiency of which strongly depends on the availability of curated corpora. However, there is a lack of COVID-19-related corpora, even more, if considering other languages besides English. This project's main contribution was the annotation of a multilingual parallel corpus and the generation of a recommendation dataset (EN-PT and EN-ES) regarding relevant entities, their relations, and recommendation, providing this resource to the community to improve the text mining research on COVID-19-related literature. This work was developed during the 7th Biomedical Linked Annotation Hackathon (BLAH7).

Innovation of Engineering Education via Global Automotive Development Project

  • Jee, Hae-Seong
    • Journal of Engineering Education Research
    • /
    • v.12 no.3
    • /
    • pp.41-49
    • /
    • 2009
  • The paper introduces an educational environment for multidisciplinary automotive development project made with other global institutions worldwide. The main objective is to accelerate students design and manufacturing skills, while giving them the experience of global communications for a large scale collaboration. This objective demands the intimate partnership between industrial design and engineering worldwide as well. Not only is the design and manufacturing portion of the project a challenge, but the students must organize the project teams together to incorporate different subsystem designs from other institutions, which, after all, requires constant communication and a truly team-oriented atmosphere for the global innovative engineering education.

Development of an Application Prototype for Small-Scale Construction Safety Management (소규모 건축공사 안전관리용 애플리케이션 프로토타입 개발)

  • Kim, Jae-Yeob;Lim, Hyeong-Eun;Kim, Eun-Ho
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.21 no.6
    • /
    • pp.65-71
    • /
    • 2019
  • In Korea, there is a lack of adequate safety management for small-scale construction work, particularly when compared to large-scale construction projects. The number of construction disasters is also higher on small-scale construction sites. In this regard, this study aimed to develop the application prototype to support the safety management of small-scale construction projects. The major findings of the research are as follows. 1) About 60% of construction disasters and death occurred on small-scale construction sites over the last two years. In addition, institutional support and costs for safety management were found to be insufficient. 2) The items of the application for the small-scale construction safety management were constructed on the basis of the safety management of large-scale construction work. The contents of the application were confirmed based on a survey of small-scale construction project managers. 3) The application algorithm was developed with a focus on the roles of management subjects and information exchange. For transition from the application prototype presented in this study to a commercial product, further research needs to be conducted regarding the reflection of user requirements and application management subjects.