The Journal of Korean Institute of Communications and Information Sciences
/
v.23
no.8
/
pp.1915-1925
/
1998
The switching system software is large scale, real-time multi-task system which requires high reliability. The reliability assessment of large-scale software is very important for the success of software development project. For this raeson, the software quality measurement is much more important. In this paper, we have learned about the software reliability, metho of the analysis of failure data and estimation of software quality. To estimate the software reliability, using the failure data found during of the system test. We apply the two software reliability growth models, named Goel-Okumoto(G-O) and S-shaped model, to estimate the software reliability. Also, we compared with the results and we reviewed fully not only development cycle but validation and verification of the test data, for each software versions. This paper presents a software reliability model that suitale the software development project and the activeity of quality control for the switching system.
Journal of the Korean Regional Science Association
/
v.8
no.2
/
pp.1-9
/
1992
One of the problems associated with the current system of land development projects implemented by the public sector in Korea is that various service facilities are not ready in time for the occupation of residential dwelling. A major cause of the problem is the lack of financial arrangements which would smooth the cash-flow of the suppliers of the facilities during the project period. In this paper we present two schemes which will contribute to the optimal provision of service facilities by easing the financial constraint facing the land developers and suppliers of the facilities. The first scheme involves channeling a fraction of profits from a land development project and of the proceeds of mandatory sales of Type II National Housing Bonds as a loan to the suppliers of the service facilities. The second scheme considers the participation of the private sector in the project as a member of a consortium comprising the Korea Land development Corporation, the National Housing Fund, and private developers. It is proved that each scheme is superior to the current system. as well as entailing a very small cost.
In the current train operation system, large scaled stations like Cheongnyangni and Yongsan are not remote controlled from the central operator but manually by local operator. It is because there are so many entering and exit of trains between depot and mainline which are operating through the large scaled stations and it is very effective to traffic flow on the mainline. Therefore, Kyong Bong Technology Co., Ltd. (KBTech) and Korea Railway Research Institute (KRRI) are continuing the research and development to import 'Autonomous Decentralized System (ADS)'as part of a new train operation control system which is a national policy project of MOCT (Ministry Of Construction & Transportation). The concept of the 'Autonomous Decentralized System (ADS)' has born in 1970's in Japan by the influences of molecular biology. The special features of ADS are being a system that able to do the online expansion, online maintenance and fault tolerance. This thesis introduces the concept of technology of ADS and also describes the system designing & development to apply with large scaled stations.
Proceedings of the Korean Society for Quality Management Conference
/
1998.11a
/
pp.233-238
/
1998
To manage a phase of coding and unit-test, project managers have used to pay attention to a number of completed programs. And the manager makes a graph of progress. Usually, this graph of progress has S shape and doesn't linearly depend on the workload. So the degree of progress seems to be behind. In actual, many projects tend to be behind the schedule. Because of this reason, it is difficult to judge whether the project is behind or not in the early stage. In this paper, We propose the 'four-division model' to solve this difficulty.
The IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques, TQM to decrease project failure, and to increase IS performance. But, in spite of such various efforts, the latest Standish Group's research indicates that the project scale is bulkier than $1{\sim}2$ year ago and IS development project's batting average falls from 34% to 28% at the same time, proceeded project is increased, and project discharged arrives to $15%{\sim}18%$. According to a research, success possibility increased by 37% after a year of PMO introduction, and increased sharply by 62% after 2 years and by 65% after S years. This research has a goal to survey how the PMO function and operation type affect the IS project performance in the financial industry. I determine nine independent variables and three dependent variables from previous researches. The results of this study are that the four core functions of PMO have relationship with project performance. But, technical support function does not relate with organization performance. Among the four core PMO operation types, three types have an effect on the IS project performance except the perfectionist type.
Journal of Institute of Control, Robotics and Systems
/
v.7
no.8
/
pp.689-696
/
2001
Large-scale Multi-disciplinary Systems(LMS) such as transportation, aerospace, defense etc. are complex systems in which there are many subsystems, interfaces, functions and demanding performance requirements. Because many contractors participate in the development, it is necessary to apply methods of sharing common objectives and communicating design status effectively among all of the stakeholders. The processes and methods of systems engineering which includes system requirement analysis; functional analysis; architecting; system analysis; interface control; and system specification development provide a success-oriented disciplined approach to the project. This paper shows not only the methodology and the results of model-based systems engineering to Automated Guided Transit(AGT) system as one of LMS systems, but also propose the extension of the model-based tool to help manage a project by linking WBS (Work Breakdown Structure), work organization, and PBS (Product Breakdown Structure). In performing the model-based functional analysis, the focus was on the operation concept of an example rail system at the top-level and the propulsion/braking function, a key function of the modern automated rail system. The model-based behavior analysis approach that applies a discrete-event simulation method facilitates the system functional definition and the test and verification activities. The first application of computer-aided tool, RDD-100, in the railway industry demonstrates the capability to model product design knowledge and decisions concerning key issues such as the rationale for architecting the top-level system. The model-based product design knowledge will be essential in integrating the follow-on life-cycle phase activities. production through operation and support, over the life of the AGT system. Additionally, when a new generation train system is required, the reuse of the model-based database can increase the system design productivity and effectiveness significantly.
Korean Journal of Construction Engineering and Management
/
v.13
no.6
/
pp.84-93
/
2012
The information generated from large and complex construction projects transfer and evolve in long-term business cycle. Therefore, while there is any problem, such as delay, the cause of the problem might relate to the previous business process rather than where it arises. However, for complex project players and business relationships, it is unsuitable to search an information flow using traditional retrieval methods. This research addresses a relationship-based information search system to analyze the information flow in large-scale and complex construction projects. First, we identified the components of the information retrieval system customizing for a large-scale complex construction projects, and then developed the inference algorithm which define the relationship between business processes. For the validation, we applied the system on a business information system of urban regeneration projects and suggested some application using information flow retrieval system for project players and project managers. Using the system, players are easy to prepare for their work process and managers can define the causal flow of the problem.
The present article briefly overviews the plan for a new project on joint technology for HTS wires/cables and describes the development plan for the world's highest field NMR magnet, which is a major development item in the project. For full-fledged social implementation of superconducting devices, high temperature superconducting (HTS) wire is a key technology since they can be cooled by liquid nitrogen and they can generate a super-high magnetic field of >>24 T at liquid helium temperatures. However, one of the major drawbacks of the HTS wires is their availability only in short lengths of a single piece of wire. This necessitates a number of joints being installed in superconducting devices, resulting in a difficult manufacturing process and a large joint resistance. In Japan, a large-scale project has commenced, including two technical demonstration items: (i) Development of superconducting joints between HTS wires, which are used in the world's highest field 1.3 GHz (30.5 T) NMR magnet in persistent current mode; the joints performance is evaluated based on NMR spectra for proteins. (ii) Development of ultra-low resistive joints between DC superconducting feeder cables for railway systems. The project starts a new initiative of next generation super-high field NMR development as well as that of realization of better superconducting power cables.
In order to promote the IT business efficiently, the Preliminary Feasibility Study has been conducted since 2004. It is to verify the feasibility of a large-scale IT project in advance and to determine whether to reflect the budget. It is more difficult to analyze the benefits of the IT project than other projects, because the IT project is carried out by combining tangible and intangible assets and human resources. For this reason, the Standard Guideline for Preliminary Feasibility Study in the IT field suggests a framework to support in estimating the benefits of the IT project. However, it includes the following problems : 1) level discrepancy among the benefit categories, 2) lack of types of benefit items, 3) no consideration of benefit inducing factors. So the framework is facing a low utilization. This study develops a new framework through a three-step research process. The new framework can be used not only for preliminary feasibility studies but also for estimating the benefits of general IT projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.