• Title/Summary/Keyword: large-scale development project

Search Result 269, Processing Time 0.027 seconds

A study on hypothetical switching software through of the analysis of failure data (고장 데이터 분석을 통한 교환 소프트웨어 특성 연구)

  • 이재기;신상권;이영목
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.23 no.8
    • /
    • pp.1915-1925
    • /
    • 1998
  • The switching system software is large scale, real-time multi-task system which requires high reliability. The reliability assessment of large-scale software is very important for the success of software development project. For this raeson, the software quality measurement is much more important. In this paper, we have learned about the software reliability, metho of the analysis of failure data and estimation of software quality. To estimate the software reliability, using the failure data found during of the system test. We apply the two software reliability growth models, named Goel-Okumoto(G-O) and S-shaped model, to estimate the software reliability. Also, we compared with the results and we reviewed fully not only development cycle but validation and verification of the test data, for each software versions. This paper presents a software reliability model that suitale the software development project and the activeity of quality control for the switching system.

  • PDF

Optimal Provision of Service Facilities for Large-scale Land Development Projects: A Loan Scheme and a Consortium Approach (택지개발에 따른 기반시설 적기공급을 위한 유관기관 협조융자와 민간참여 방안)

  • 서승환;김경환
    • Journal of the Korean Regional Science Association
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 1992
  • One of the problems associated with the current system of land development projects implemented by the public sector in Korea is that various service facilities are not ready in time for the occupation of residential dwelling. A major cause of the problem is the lack of financial arrangements which would smooth the cash-flow of the suppliers of the facilities during the project period. In this paper we present two schemes which will contribute to the optimal provision of service facilities by easing the financial constraint facing the land developers and suppliers of the facilities. The first scheme involves channeling a fraction of profits from a land development project and of the proceeds of mandatory sales of Type II National Housing Bonds as a loan to the suppliers of the service facilities. The second scheme considers the participation of the private sector in the project as a member of a consortium comprising the Korea Land development Corporation, the National Housing Fund, and private developers. It is proved that each scheme is superior to the current system. as well as entailing a very small cost.

  • PDF

Designing & Development of Prototype of Core Subsystem for High Density & Large Scale Station Traffic Management System (대형.고밀도 철도역 자동운행제어시스템의 핵심서브시스템 설계와 개발)

  • Ahn Jin;Lee Young-Su;Kim Eun-Hee;Ha Sung-Tae;Hong Soon-Heum;Kim Young-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.282-290
    • /
    • 2006
  • In the current train operation system, large scaled stations like Cheongnyangni and Yongsan are not remote controlled from the central operator but manually by local operator. It is because there are so many entering and exit of trains between depot and mainline which are operating through the large scaled stations and it is very effective to traffic flow on the mainline. Therefore, Kyong Bong Technology Co., Ltd. (KBTech) and Korea Railway Research Institute (KRRI) are continuing the research and development to import 'Autonomous Decentralized System (ADS)'as part of a new train operation control system which is a national policy project of MOCT (Ministry Of Construction & Transportation). The concept of the 'Autonomous Decentralized System (ADS)' has born in 1970's in Japan by the influences of molecular biology. The special features of ADS are being a system that able to do the online expansion, online maintenance and fault tolerance. This thesis introduces the concept of technology of ADS and also describes the system designing & development to apply with large scaled stations.

ON CODING AND UNIT-TEST PROCESS MANAGEMENT FOR SOFTWARE DEVELOPMENT OF LARGE-SCALE

  • Kino Yasunobu
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.233-238
    • /
    • 1998
  • To manage a phase of coding and unit-test, project managers have used to pay attention to a number of completed programs. And the manager makes a graph of progress. Usually, this graph of progress has S shape and doesn't linearly depend on the workload. So the degree of progress seems to be behind. In actual, many projects tend to be behind the schedule. Because of this reason, it is difficult to judge whether the project is behind or not in the early stage. In this paper, We propose the 'four-division model' to solve this difficulty.

  • PDF

A Research on the core PMO function and operation type for the IT project of financial industry in Korea (금융권 핵심 PMO 기능과 운영형태에 관한 연구)

  • Lee, Jae-Beom;Lee, Jae-Chul;Chang, Yun-Hi
    • Journal of Digital Convergence
    • /
    • v.7 no.3
    • /
    • pp.35-47
    • /
    • 2009
  • The IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques, TQM to decrease project failure, and to increase IS performance. But, in spite of such various efforts, the latest Standish Group's research indicates that the project scale is bulkier than $1{\sim}2$ year ago and IS development project's batting average falls from 34% to 28% at the same time, proceeded project is increased, and project discharged arrives to $15%{\sim}18%$. According to a research, success possibility increased by 37% after a year of PMO introduction, and increased sharply by 62% after 2 years and by 65% after S years. This research has a goal to survey how the PMO function and operation type affect the IS project performance in the financial industry. I determine nine independent variables and three dependent variables from previous researches. The results of this study are that the four core functions of PMO have relationship with project performance. But, technical support function does not relate with organization performance. Among the four core PMO operation types, three types have an effect on the IS project performance except the perfectionist type.

  • PDF

Application of Model-Based Systems Engineering to Large-Scale Multi-Disciplinary Systems Development (모델기반 시스템공학을 응용한 대형복합기술 시스템 개발)

  • Park, Joong-Yong;Park, Young-Won
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.8
    • /
    • pp.689-696
    • /
    • 2001
  • Large-scale Multi-disciplinary Systems(LMS) such as transportation, aerospace, defense etc. are complex systems in which there are many subsystems, interfaces, functions and demanding performance requirements. Because many contractors participate in the development, it is necessary to apply methods of sharing common objectives and communicating design status effectively among all of the stakeholders. The processes and methods of systems engineering which includes system requirement analysis; functional analysis; architecting; system analysis; interface control; and system specification development provide a success-oriented disciplined approach to the project. This paper shows not only the methodology and the results of model-based systems engineering to Automated Guided Transit(AGT) system as one of LMS systems, but also propose the extension of the model-based tool to help manage a project by linking WBS (Work Breakdown Structure), work organization, and PBS (Product Breakdown Structure). In performing the model-based functional analysis, the focus was on the operation concept of an example rail system at the top-level and the propulsion/braking function, a key function of the modern automated rail system. The model-based behavior analysis approach that applies a discrete-event simulation method facilitates the system functional definition and the test and verification activities. The first application of computer-aided tool, RDD-100, in the railway industry demonstrates the capability to model product design knowledge and decisions concerning key issues such as the rationale for architecting the top-level system. The model-based product design knowledge will be essential in integrating the follow-on life-cycle phase activities. production through operation and support, over the life of the AGT system. Additionally, when a new generation train system is required, the reuse of the model-based database can increase the system design productivity and effectiveness significantly.

  • PDF

Development of the Retrieval System of Information Flow for a Large-scale and Complex Construction Project using Information Transfer Relationship on Business Process (업무 정보전달관계를 이용한 대형복합건설사업의 정보흐름 색시스템 개발)

  • Shin, Jinho;Lee, Hyun-Soo;Park, Moonseo;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.84-93
    • /
    • 2012
  • The information generated from large and complex construction projects transfer and evolve in long-term business cycle. Therefore, while there is any problem, such as delay, the cause of the problem might relate to the previous business process rather than where it arises. However, for complex project players and business relationships, it is unsuitable to search an information flow using traditional retrieval methods. This research addresses a relationship-based information search system to analyze the information flow in large-scale and complex construction projects. First, we identified the components of the information retrieval system customizing for a large-scale complex construction projects, and then developed the inference algorithm which define the relationship between business processes. For the validation, we applied the system on a business information system of urban regeneration projects and suggested some application using information flow retrieval system for project players and project managers. Using the system, players are easy to prepare for their work process and managers can define the causal flow of the problem.

Development plan for a persistent 1.3 GHz NMR magnet in a new MIRAI project on joint technology for HTS wires/cables in Japan

  • Yanagisawa, Y.;Suetomi, Y.;Piao, R.;Yamagishi, K.;Takao, T.;Hamada, M.;Saito, K.;Ohki, K.;Yamaguchi, T.;Nagaishi, T.;Kitaguchi, H.;Ueda, H.;Shimoyama, J.;Ishii, Y.;Tomita, M.;Maeda, H.
    • Superconductivity and Cryogenics
    • /
    • v.20 no.2
    • /
    • pp.15-22
    • /
    • 2018
  • The present article briefly overviews the plan for a new project on joint technology for HTS wires/cables and describes the development plan for the world's highest field NMR magnet, which is a major development item in the project. For full-fledged social implementation of superconducting devices, high temperature superconducting (HTS) wire is a key technology since they can be cooled by liquid nitrogen and they can generate a super-high magnetic field of >>24 T at liquid helium temperatures. However, one of the major drawbacks of the HTS wires is their availability only in short lengths of a single piece of wire. This necessitates a number of joints being installed in superconducting devices, resulting in a difficult manufacturing process and a large joint resistance. In Japan, a large-scale project has commenced, including two technical demonstration items: (i) Development of superconducting joints between HTS wires, which are used in the world's highest field 1.3 GHz (30.5 T) NMR magnet in persistent current mode; the joints performance is evaluated based on NMR spectra for proteins. (ii) Development of ultra-low resistive joints between DC superconducting feeder cables for railway systems. The project starts a new initiative of next generation super-high field NMR development as well as that of realization of better superconducting power cables.

  • PDF

Development of a Framework for Estimating the Benefits of IT Projects : Focusing on Preliminary Feasibility Study (정보화 사업의 편익 추정 프레임워크 개발 : 정보화부문 예비타당성조사를 중심으로)

  • Lee, Chunghun
    • Journal of Information Technology Services
    • /
    • v.17 no.3
    • /
    • pp.101-115
    • /
    • 2018
  • In order to promote the IT business efficiently, the Preliminary Feasibility Study has been conducted since 2004. It is to verify the feasibility of a large-scale IT project in advance and to determine whether to reflect the budget. It is more difficult to analyze the benefits of the IT project than other projects, because the IT project is carried out by combining tangible and intangible assets and human resources. For this reason, the Standard Guideline for Preliminary Feasibility Study in the IT field suggests a framework to support in estimating the benefits of the IT project. However, it includes the following problems : 1) level discrepancy among the benefit categories, 2) lack of types of benefit items, 3) no consideration of benefit inducing factors. So the framework is facing a low utilization. This study develops a new framework through a three-step research process. The new framework can be used not only for preliminary feasibility studies but also for estimating the benefits of general IT projects.