• 제목/요약/키워드: large space building

검색결과 339건 처리시간 0.033초

복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 - (A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex -)

  • 강신엽;안재홍;김주형
    • 한국BIM학회 논문집
    • /
    • 제3권1호
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

Geometric Regualrization of Irregular Building Polygons: A Comparative Study

  • Sohn, Gun-Ho;Jwa, Yoon-Seok;Tao, Vincent;Cho, Woo-Sug
    • 한국측량학회지
    • /
    • 제25권6_1호
    • /
    • pp.545-555
    • /
    • 2007
  • 3D buildings are the most prominent feature comprising urban scene. A few of mega-cities in the globe are virtually reconstructed in photo-realistic 3D models, which becomes accessible by the public through the state-of-the-art online mapping services. A lot of research efforts have been made to develop automatic reconstruction technique of large-scale 3D building models from remotely sensed data. However, existing methods still produce irregular building polygons due to errors induced partly by uncalibrated sensor system, scene complexity and partly inappropriate sensor resolution to observed object scales. Thus, a geometric regularization technique is urgently required to rectify such irregular building polygons that are quickly captured from low sensory data. This paper aims to develop a new method for regularizing noise building outlines extracted from airborne LiDAR data, and to evaluate its performance in comparison with existing methods. These include Douglas-Peucker's polyline simplication, total least-squared adjustment, model hypothesis-verification, and rule-based rectification. Based on Minimum Description Length (MDL) principal, a new objective function, Geometric Minimum Description Length (GMDL), to regularize geometric noises is introduced to enhance the repetition of identical line directionality, regular angle transition and to minimize the number of vertices used. After generating hypothetical regularized models, a global optimum of the geometric regularity is achieved by verifying the entire solution space. A comparative evaluation of the proposed geometric regulator is conducted using both simulated and real building vectors with various levels of noise. The results show that the GMDL outperforms the selected existing algorithms at the most of noise levels.

한국 현대건축의 기술역사에 관한 연구 (A Study on the History of Technology in Korean Modern Architecture)

  • 정인하;김진
    • 건축역사연구
    • /
    • 제9권3호
    • /
    • pp.51-69
    • /
    • 2000
  • This study tries to analyze the development of architectural technologies appeared in several tall buildings and large spatial structures from 1955 to 1999 in Korea. We suppose that these buildings represent the development of technology in Korean modern architecture. By the detailed analysis of these buildings, we can arrive at a conclusion as such; During the years 1955-1999, there existed a great changement in the eighties. We can find this fact very well in the domain of structural system and curtain wall system. In large spatial structures, the structural-system of shell and steel truss dome was replaced by that of space frame, space truss and cable truss with membrane. In tall building, the structural system of rigid frame and shear wall was replaced by tubular system, core and outrigger system. Korean architects introduced the aluminum curtain wall in the sixties, but its low technological level caused many problems in reality. Therefore, precast concrete curtain wall appeared from seventies as the main method for an outer wall in tall building. With the augmentation of height after 1980, PC curtain wall was replaced by the aluminum curtain wall of unit type and structural glass wall system. These systems help to stress the transparency in a tall building.

  • PDF

우리나라 공공도서관의 규모에 관한 연구 (A Study on the Size of the Public Libraries in Korea)

  • 김영석
    • 한국도서관정보학회지
    • /
    • 제44권2호
    • /
    • pp.377-398
    • /
    • 2013
  • 대규모 도서관을 몇 개 건립하는 것보다 소규모 도서관을 많이 건립하는 것이 단기간에 공공도서관 인프라를 확충하는 데 효율적이다. 우리나라의 공공도서관은 선진국들과 비교해서 큰 규모로 건립되었다. 본 연구는 우리나라 공공도서관의 대부분이 중 대규모로 건립된 원인을 분석하고자 하였다. 이를 위해 2011년 12월 기준 우리나라 전체 791개 공공도서관의 연면적을 조사하였다. 우리나라 공공도서관의 평균 연면적은 $2,495m^2$로 나타났다. 본 연구는 도서관의 규모 측면에서 공공도서관의 효율적인 인프라 확충을 위해 고려해야할 도서관 건립 정책은 무엇인지를 파악하고자 하였다.

Spatial Scheduling in Shipbuilding Industry

  • Duck Young Yoon;Varghese Ranjan;Koo Chung Kon
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2004년도 학술대회지
    • /
    • pp.106-110
    • /
    • 2004
  • In any large heavy industry like that of ship building, there exist a lot of complications for the arrangement of building blocks optimally for the minimal space consumption. The major problem arises at yard because of laxity in space for arranging the building blocks of ship under construction. A standardized erection sequence diagram is generally available to provide the prioritised erection sequence. This erection sequence diagram serves as the frame work. In order to make a timely erection of the blocks a post plan has to be developed so that the blocks lie in the nearest possible vicinity of the material handling devices while keeping the priority of erection. Therefore, the blocks are arranged in the pre-erection area. This kind of readiness of blocks leads to a very complex problem of space. This arises due to the least available space leading to an urgent need of an availability of intelligent spatial schedule without compromising the rate of production. There exists two critical problems ahead namely, the spatial occupation layout of pre-erection area and the emptying pattern in the spatial vicinity. The block shape is assumed be rectangular. The related input data's are the dates of erection (earliest as well as the latest), geometrical parameters of block available on pre-erection area, slack time and the like.

  • PDF

학교건물의 정보통신기반시설 계획에 관한 연구 (A Study on the Planning of Telecommunications Infrastructure for Educational Buildings)

  • 박동소
    • 교육시설
    • /
    • 제9권5호
    • /
    • pp.5-12
    • /
    • 2002
  • High-speed telecommunication has brought variety of changes in every field of the world at large. In the field of education, use of multimedia has been positively introduced as teaching and learning tools. In addition, introduction of remote education as well as information and communication technology (ICT) has led an educational system gone into melting pot. These changes have known to be impossible without the provision of the infrastructure of telecommunications such as cabling, cable pathway, telecommunication equipments, and space for the equipments. Although the infrastructure of telecommunications should be fully considered from the early stage of the building design, most of the existing buildings have only cabling for voice communication such as telephone. As a result, heavy expenses are required for the installation of new telecommunication equipments. Such problems as defilement of the appearance of the building and a falling-off in reliability of telecommunication line are caused by the exposed cabling, when the cabling pathway and/or the space for the equipments are not reserved. Considering over 70% of error in telecommunication is coming from the cabling in building, it is necessary to reserve the space for efficient maintenance of the cabling and the equipments. In recent years, the national standard(TTAS.KO-04.0005) on the reservation of space for telecommunication cabling and equipments in residential and commercial building is established and applied for the building design. As well, the standard is in force for the educational buildings. In this study, we try to provide the guidelines for the design of telecommunications infrastructure in educational buildings for the purpose of efficient operation of education information and ICT.

대공간 목구조 건축의 건립 현황과 구조시스템 특성 분석 (A Study on the Construction Status and the Structural System Features of Wooden Large Space Buildings)

  • 이주나;이형훈;이승재
    • 한국공간구조학회논문집
    • /
    • 제22권3호
    • /
    • pp.15-24
    • /
    • 2022
  • In this research, the case of modern wooden structures since 1950 with span of 30m or more was investigated and analyzed the construction status and structural planning characteristics of wooden large space architecture. As a result, wooden large space buildings have built around Asia, North America, and Europe, in which cases of ice skating stadiums with span of 30m to 60m were concentrated. In the case of baseball parks and football stadiums, even a span of about 165m was built in a wooden structure. In addition, it was found that the structural systems used in wooden large space structures were a funicular arch and truss structure, in that cases, funicular arch system consisting of radial arrangements was used in the examples exceeded 150m and the two way truss system was also used in long span wooden structures exceeding 100m. As the truss structure with a tie-rod or the flexure+tension structure was partially investigated, it can be seen that various timber structural systems need to be devised and researched. Also, It was investigated that a technique in which some members of the truss are made of steel or a composite member of steel and timber is also possible to develop

고밀도 EPS를 이용한 돔 구조 안전성에 대한 고찰 (Dome Structure using High-Density EPS Review of Safety)

  • 장석준;이동운
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.119-120
    • /
    • 2011
  • Dome structure to form a space-efficient, applied a lot of beautiful buildings with structural systems, as well as a large space structure in the form of new residential lots have been applied. And domestic demand for housing in the dome with increasing dome house using various materials, are becoming commonplace. But now the Dome House is mainly used in construction steel, wood, stone, FRP construction and building materials per unit area and the high cost, long construction time, energy efficiency, has some disadvantages such as degradation. And structural strength of the structure is weak, the natural ingredients used come from natural damage is so big. In addition, demolition of buildings in trouble when handling the environmental problems has emerged. Recently expanded polystyrene to improve these problems by using the various approaches and research is being attempted and there.

  • PDF

HRSG건물 온도제어를 위한 환기방안에 관한 수치적 연구 (Numerical Study on Ventilation Method for Temperature Control of HRSG Building)

  • 김철환;이종욱;최훈기;유근종
    • 한국산업보건학회지
    • /
    • 제19권3호
    • /
    • pp.240-249
    • /
    • 2009
  • HRSG(Heat Recovery Steam Generator) building is large enclosed structure included various heat sources. This building needs to appropriately keep internal air temperature for worker's safety and operability of control devices. In this study, ventilation analysis is performed to find proper ventilation method for temperature control. Ventilation analysis is applied to entire internal space of the building with standard $k-{\varepsilon}$ model and enhanced wall treatment because of large size of the structure. And the ventilation method is considered natural and forced convection with two louver structures which has damper or not. Louver structure affect directly air circulation in near HRSG and lower region of the building. Forced ventilation provides strong inertial force which cause upward airflow. From the analysis, it is found that design requirement for internal air temperature can be satisfied by forced ventilation method with louver structure without damper.

프리캐스트 콘크리트 부재의 현장생산용 증기 양생 방법 개발 연구 (Study on Development of Steam Curing Method for In-situ production of Precast Concrete members)

  • 성수진;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.71-72
    • /
    • 2014
  • Green Frame is a building frame system to construct a column-beam structure using composite precast concrete members. To reduce the cost of producing precast concrete, in-situ production of members is required. However, when the structural members are produced on site, it needs a large space for production. So, "Just-In-Time" production method should be adopted. For Just-In-Time to be realized, the early strength of members should be ensured for them to be transported. Thus, steam curing to secure the early strength is applied in Green Frame. Yet, a large-scale steam curing system is not possible for in-situ production of precast concrete. A smaller steam curing system is needed. In this regard, the study is aimed to develop a new steam curing method applicable to the in-situ production of precast concrete.

  • PDF