The key competition factor of manufacturing industries has progressively changed from cost to quality and time. Recently, the manufacturing environments more rapidly change than before. So, many companies want to introduce a advanced manufacturing system like CIMS to meet various user's needs and short delivery. But there is a considerable gap between the decision to invest and the achievement of promised benefits. Managers, generally, cannot afford CIM invesment unless they can determine beforehand that CIM will work in thier company and that will provide a coherent strategy and satisfactory return on investment In many cases, it is impossible to justify CIM investment by only economical analysis. Decision making problems like CIM investment are of a multiple objective nature. So, decision making process and multiattribute utility function are very useful methods to evaluate CIM justification In this paper, we described the key functions of CIM justification evaluation using IDEF methodology and developed the applicattion procedure of DMP and MUF method for CIM justification.
This paper analyzes the facility investment appraisal process of a real world shipyard and proposes several improving points. For this purpose the investment appraisal sheets are investigated in terms of the theory of the discounted cash flow (DCF) method. Through this investigation, the differences between the theory and its application are clarified and it is tried to resolve the gab by applying the DCF method appropriately including explicit use of actual cash flows in revenue and expense expressions. It is also proposed that some portion of the capital loss caused by defending facility sales may not be the sunk cost and that the portion can conceptually be calculated by the difference between economic value and sales price.
In this study, a stereolithography apparatus (SLA) prototype is used as a master model to be transformed into the silicone pattern by vacuum tool forming. The tool for the first prototype is fabricated by using this silicone pattern. Following this procedure, a temporary tool with metal powder and epoxy for wax injection is prepared for the die set of quick change type which consists of upper and lower base die나 and an insert die. The die set of quick change type appears to be very effective in casting operation by changing tools rapidly. The original wax pattern is formed through the die set, and is made of lost-was. Finally the lost-wax pattern is applied to investment casting. The final casting product is checked regarding its dimensional accuracy.
The resumption of economic cooperation between South and the North Korea will be a new growth engine for our economy. Many Korean companies are preparing to invest in North Korea in accordance with the progress of inter-Korean relations. However, there are many risks inherent in inter-Korean economic cooperation, as experienced in previous cases. Specifically, one should be prepared for unfair measures such as the expropriation of investment assets of South Korean enterprises by North Korea authorities. Therefore, it is essential to review the protection measures of investment in North Korea and to review the investment dispute settlement system. The South and the North have an agreement to establish the inter-Korean Commercial Arbitration Committee to resolve the disputes that may arise if one party's investments are lost due to inappropriate or unfair measures due to the other party's authority. However, the Investment Agreement, which governs the Inter-Korean Commercial Arbitration Committee, contains a number of declarative statements that are somewhat ineffective. Even today, nearly 20 years after the adoption of the Agreement, the specific detailed procedures have shown no real progress, such as in the enactment of arbitration rules. Therefore, at present, it is difficult to expect a system that can effectively address the damage of our corporations which have invested in North Korea. When the assets freeze after the suspension of Kumgang tourism and the closure of the Kaeseung Industrial Complex by North Korea, the activation of the inter-Korean Commercial Arbitration Committee is the most important prerequisite for economic cooperation with North Korea. For this purpose, the resolution of disputes through the Inter-Korean Commercial Arbitration Committee has to be made more concrete, with the effectiveness of the dispute settlement system enhanced by means of various efforts.
Since imposing Performance Requirements (PRs) on investors have been conducted as a means to protect a host state's domestic industry in the short run, with its effect on improving the international balance of payments, it has been implemented mostly in developing countries. From the viewpoint of investors, however, PRs hinder free competition and investment activities and have the effect of distorting international trade activities; therefore, they are expected to bring detrimental effects on the host state's economic development in the long run. PRs provided by International Investment Agreements (IIAs) and WTO-TRIMs, too, included many abstract regulations which are grounded on the host state's economic efficiency in the past; however, those PRs are gradually being more concretely specified, shifting to a form of prohibition with the goals of increasing the protection on investors and realizing investment liberalization. Accordingly, when Korea freshly concludes IIAs or revises them afterwards, one should focus more on following the points regarding PRs. First, to protect Korean companies' investment activities, it is advantageous to list the contents of prohibited PRs extensively and concretely and create a stipulation. Second, it is necessary to list the contents of the PRs prohibited and add the phrases for prohibiting "any other similar requirements" explicitly, as well so as to cover the PRs that can appear newly. Third, as in the cases associated with PRs, issuable matters are mostly either the range of applying PRs or the conditions of applying them (relevance or detrimental effects); therefore, it is necessary to classify the cases accumulated by issues and analyze them thoroughly. In conclusion, as this study has analyzed the theoretical characteristics of PRs provided in IIAs and related cases and suggests exquisite theory regarding PRs, it not only lays fundamental grounds for follow-up research but also gives useful and practical guidelines for the parties concerned and the arbitrators according to the ISDS procedure.
투자협정상의 MFN 조항을 실체적인 규정 외에 절차적인 규정에까지 적용할 수 있는지에 대한 논의는 보호 범위를 결정하기 때문에 중요한 의의를 가진다. 그러나 투자협정마다 MFN 조항에서 대우의 범위를 조금씩 상이하게 규정하고 있어 이에 대한 해석의 차이가 존재한다. 그러므로 본 연구는 ICSID에서 판정한 중재사례에 초점을 맞추어 국제투자분쟁에서 외국인투자자가 원 투자협정상의 MFN 조항을 통하여 다른 투자협정상에 규정된 분쟁해결절차를 원용할 수 있는지를 분석함으로써 MFN 조항의 적용범위를 획정할 수 있는 기준들을 도출하여 유용한 시사점 및 실무적인 지침을 제시하고자 한다.
This article examines the necessity for the introduction of an ICSID Appellate System. In comparison with the WTO appellate system, the ICSID ad hoc Committee has a very limited mandate. An annulment inquiry under the ICSID arbitration system barely focuses on whether the arbitral decision resulted from a justifiable process. As long as there is procedural legitimacy, the resulting awards remain unaffected under the annulment procedure, irrespective of mistakes of fact or law. In contrast, in the WTO DSS the AB substantively reviews panel rulings and suggestions that are founded on any deficiency of objectivity or error in the interpretation of a particular WTO provision. This defect intrinsic in the annulment procedure could cause injustice to a party earnestly interested in correcting recognized misapplication of law by ICSID tribunals. Accordingly, the establishment of an appellate system would result in a more substantive and procedural review of awards. The creation of such an ICSID appellate system would ensure thorough scrutiny of the decisions of the tribunal of first instance, leading to better reasoned outcomes. This could lead to a crystallization of predictability in investment relations. The end result would be that fairness, clarity, reliability, and legality in the ICSID adjudicative process would be unassailable, to the advantage of all the contracting parties.
The purpose of this study was to investigate the displacements of cast framework by torch soldering and electric soldering techniques. Specimen had two cylinders and connecting bar that had sectioned with 0.3mm gap at mid point. 10 of total specimens were divided into two groups. In torch soldered group, soldering investment block was made and conventional torch solder-ing procedure was carried out. In electric soldered group, electric soldering was carried out on the master cast without soldering investment block by using electric soldering machine(Dentapunkt DP 7, Kulzer, Germany) After soldering procedure, three dimensional coordinates of two centroids of each cylinder were measured by three dimensional coordinate measuring machine. The intercentroidal displacement and global displacement were calculated and then, these values were compared and evaluated. The results were obtained as follows: 1. Intercentroidal distances of specimens decreased after both soldering procedures, and the decrease in intercentroidal distance was greater for torch soldered group than for electric soldered group 2. Global displacements of torch soldered group were greater than those of electric soldered group.
Number of highway lanes and level of service are based on the 30th, 60th or 100th highest hour volume of the target year. On the other hand, railroad design volume is generally expressed in average annual daily traffic (AADT). This procedure ignores attributes of railroad demand's concentration on peak days and hours. Actual data analysis represents railroad's peaking characteristics very similar to those of highways. Therefore it is necessary to set a procedure in selecting design volume for railroad planning. This study presents a concept and the calculating procedure for railroad design hourly volume to analyze effect of railroad investment.
The 1th International Conference on Construction Engineering and Project Management
/
pp.731-736
/
2005
The governmental attitude toward private investment and financing for infrastructure projects has changed from the initial prohibition to the current encouragement in China, which has been embodied in the legal documents and administrative process. However, the problem of identification, bidding, and approval procedure for privately financed infrastructure projects has been observed in policies and administrative measures promulgated by different or even the same government branches, which is prohibitive factors for smooth project implementation. After analysis of the identification, bidding, and approval process of infrastructure projects, the authors proposed a simplified and alternative procedure and clarified the key points of relevant project documents.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.