• 제목/요약/키워드: interval order

검색결과 1,457건 처리시간 0.021초

초음파 영상장치에서 측방향 해상도 향상에 관한 연구 (A Study on the Improvement a Lateral Resolution of the Ultrasound Imaging System)

  • 이후정;이행세
    • 대한의용생체공학회:의공학회지
    • /
    • 제9권1호
    • /
    • pp.87-92
    • /
    • 1988
  • In this paper, a new focusing method, to be called the pipelined sampled delay focusing (PSDF), is implemented. This method improves the lateral resolution in ultrasound imaging system. In PSDF, the analog belay lines are no longer necessary because sampling sum process can replace the conventional delay sum process. Also, the method offers continuous dynamic focusing on the resolution pixel basis, and eliminates the constraint that the maximum delay time is less than the sampling interval. Second order sampling is adopted in order to extend the sampling interval.

  • PDF

NONLINEAR FRACTIONAL PROGRAMMING PROBLEM WITH INEXACT PARAMETER

  • Bhurjee, A.K.;Panda, G.
    • Journal of applied mathematics & informatics
    • /
    • 제31권5_6호
    • /
    • pp.853-867
    • /
    • 2013
  • In this paper a methodology is developed to solve a nonlinear fractional programming problem, whose objective function and constraints are interval valued functions. Interval valued convex fractional programming problem is studied. This model is transformed to a general convex programming problem and relation between the original problem and the transformed problem is established. These theoretical developments are illustrated through a numerical example.

Lp SOLUTIONS FOR GENERAL TIME INTERVAL MULTIDIMENSIONAL BSDES WITH WEAK MONOTONICITY AND GENERAL GROWTH GENERATORS

  • Dong, Yongpeng;Fan, Shengjun
    • 대한수학회논문집
    • /
    • 제33권3호
    • /
    • pp.985-999
    • /
    • 2018
  • This paper is devoted to the existence and uniqueness of $L^p$ (p > 1) solutions for general time interval multidimensional backward stochastic differential equations (BSDEs for short), where the generator g satisfies a ($p{\wedge}2$)-order weak monotonicity condition in y and a Lipschitz continuity condition in z, both non-uniformly in t. The corresponding stability theorem and comparison theorem are also proved.

구매의도 생성 순서와 구매실현 순서의 역전 현상을 감안한 확장된 순차분석 방법론 (An Investigation on Expanding Traditional Sequential Analysis Method by Considering the Reversion of Purchase Realization Order)

  • 김민석;김남규
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제22권3호
    • /
    • pp.25-42
    • /
    • 2013
  • Recently various kinds of Information Technology services are created and the quantities of the data flow are increase rapidly. Not only that, but the data patterns that we deal with also slowly becoming diversity. As a result, the demand of discover the meaningful knowledge/information through the various mining analysis such as linkage analysis, sequencing analysis, classification and prediction, has been steadily increasing. However, solving the business problems using data mining analysis does not always concerning, one of the major causes of these limitations is there are some analyzed data can't accurately reflect the real world phenomenon. For example, although the time gap of purchasing the two products is very short, by using the traditional sequencing analysis, the precedence relationship of the two products is clearly reflected. But in the real world, with the very short time interval, the precedence relationship of the two purchases might not be defined. What was worse, the sequence of the purchase intention and the sequence of the purchase realization of the two products might be mutually be reversed. Therefore, in this study, an expanded sequencing analysis methodology has been proposed in order to reflect this situation. In this proposed methodology, the purchases that being made in a very short time interval among the purchase order which might not important will be notice, and the analysis which included the original sequence and reversed sequence will be used to extend the analysis of the data. Also, to some extent a very short time interval can be defined as the time interval, so an experiment were carried out to determine the varying based on the time interval for the actual data.

구간 그래프를 이용한 스케쥴링 알고리듬 (A Scheduling Algorithm Using the Interval Graph)

  • 김기현;정정화
    • 전자공학회논문지A
    • /
    • 제31A권1호
    • /
    • pp.84-92
    • /
    • 1994
  • In this paper, we present a novel scheduling algorithm using the weighted interval graph. An interval graph is constructed, where an interval is a time frame of each operation. And for each operation type, we look for the maximum clique of the interval graph: the number of nodes of the maximum clique represents the number of operation that are executed concurrently. In order to minimize resource cost. we select the operation type to reduce the number of nodes of a maximum clique. For the selected operation type, an operation selected by selection rule is moved to decrease the number of nodes of a maximum clique. A selected operation among unscheduled operations is moved repeatly and assigned to a control step consequently. The proposed algorithm is applied to the pipeline and the nonpipeline data path synthesis. The experiment for examples shows the efficiency of the proposed scheduling algorithm.

  • PDF

새로운 무손실 의료영상 압축방법 (A new method of lossless medical image compression)

  • 지창우;박성한
    • 한국통신학회논문지
    • /
    • 제21권11호
    • /
    • pp.2750-2767
    • /
    • 1996
  • In this papr, a new lossless compression method is presented based on the Binary Adaptive Arithmetic Coder(BAAC). A simple unbalanced binary tree is created by recursively dividing the BAAC unit interval into two probability sub-inervals. On the tree the More Probable Predicted Value(MPPV) and Less Probable Predicated Value(LPPV) estimated by local statistics of the image pixels are arranged in decreasing order. The BAAC or Huffman coder is thus applied to the branches of the tree. The proposed method allows the coder be directly applied to the full bit-plane medical image without a decomposition of the full bit-planes into a series of binary bit-planes. The use of the full bit model template improves the compresion ratio. In addition, a fast computation for adjusting the interval is possible since a simple arithmetic operation based on probability interval estimation state machine is used for interval sub-division within the BAAC unit interval.

  • PDF

중의적 문장 인지에 있어서의 구경계의 영향 (The Influence of Phrasing on the Perception of Ambiguous Sentences)

  • 강선미;김기호;이주경
    • 음성과학
    • /
    • 제14권4호
    • /
    • pp.65-80
    • /
    • 2007
  • This experimental study is designed to investigate the acoustic cues produced by English native speakers in order to disambiguate the ambiguous sentences. This study also investigates whether Korean learners of English and English native speakers can perceive the appropriate meanings from the sentences produced with those acoustic cues. In the perception test, English native speakers successfully found out the proper meaning, utilizing the intonational cues, while Korean learners had difficulties in distinguishing the differences in meaning. The break interval was manipulated in order to see whether the pause duration facilitates or interferes with disambiguation. Though phrasing played an important role in disambiguation, the break interval itself did not have influence on it. The result, therefore, suggests that the tonal realization of phrasal accents and boundary tones seem to be more significant than the break interval in the perception of phrasing.

  • PDF

LOW REGULARITY SOLUTIONS TO HIGHER-ORDER HARTREE-FOCK EQUATIONS WITH UNIFORM BOUNDS

  • Changhun Yang
    • 충청수학회지
    • /
    • 제37권1호
    • /
    • pp.27-40
    • /
    • 2024
  • In this paper, we consider the higher-order HartreeFock equations. The higher-order linear Schrödinger equation was introduced in [5] as the formal finite Taylor expansion of the pseudorelativistic linear Schrödinger equation. In [13], the authors established global-in-time Strichartz estimates for the linear higher-order equations which hold uniformly in the speed of light c ≥ 1 and as their applications they proved the convergence of higher-order Hartree-Fock equations to the corresponding pseudo-relativistic equation on arbitrary time interval as c goes to infinity when the Taylor expansion order is odd. To achieve this, they not only showed the existence of solutions in L2 space but also proved that the solutions stay bounded uniformly in c. We address the remaining question on the convergence of higherorder Hartree-Fock equations when the Taylor expansion order is even. The distinguished feature from the odd case is that the group velocity of phase function would be vanishing when the size of frequency is comparable to c. Owing to this property, the kinetic energy of solutions is not coercive and only weaker Strichartz estimates compared to the odd case were obtained in [13]. Thus, we only manage to establish the existence of local solutions in Hs space for s > $\frac{1}{3}$ on a finite time interval [-T, T], however, the time interval does not depend on c and the solutions are bounded uniformly in c. In addition, we provide the convergence result of higher-order Hartree-Fock equations to the pseudo-relativistic equation with the same convergence rate as the odd case, which holds on [-T, T].

제약부 구간 선형 회귀모델에 의한 실동시간의 견적 (Estimation of the Actual Working Time by Interval Linear Regression Models with Constraint Conditions)

  • Hwang, S. G.;Seo, Y. J.
    • 한국경영과학회지
    • /
    • 제14권2호
    • /
    • pp.105-114
    • /
    • 1989
  • The actual working time of jobs, in general, is different to the standard time of jobs. In this paper, in order to analyze the actual working time of each job in production, we use the total production amount and the encessary total working time. The method which analyzes the actual working time is as follows. In this paper, we propose the interval regression analysis for obtaining an interval linear regression model with constraint conditions with respect to interval parameters. The merits of this method are the following.1) it is easy to obtain an interval linear model by solving a LP problem to which the formulation of proposed regression analysis is reduced, 2) it is easy to add constraint conditions about interval parameters, which are a sort of expert knowledge. As an application, within a case which has given certain data, the actual working time of jobs and the number of workers in a future plan are estimated through the real data obtianed from the operation of processing line in a heavy industry company. It results from the proposed method that the actual working time and the number of workers can be estimated as intervals by the interval regression model.

  • PDF

Non-stochastic interval arithmetic-based finite element analysis for structural uncertainty response estimate

  • Lee, Dongkyu;Park, Sungsoo;Shin, Soomi
    • Structural Engineering and Mechanics
    • /
    • 제29권5호
    • /
    • pp.469-488
    • /
    • 2008
  • Finite element methods have often been used for structural analyses of various mechanical problems. When finite element analyses are utilized to resolve mechanical systems, numerical uncertainties in the initial data such as structural parameters and loading conditions may result in uncertainties in the structural responses. Therefore the initial data have to be as accurate as possible in order to obtain reliable structural analysis results. The typical finite element method may not properly represent discrete systems when using uncertain data, since all input data of material properties and applied loads are defined by nominal values. An interval finite element analysis, which uses the interval arithmetic as introduced by Moore (1966) is proposed as a non-stochastic method in this study and serves a new numerical tool for evaluating the uncertainties of the initial data in structural analyses. According to this method, the element stiffness matrix includes interval terms of the lower and upper bounds of the structural parameters, and interval change functions are devised. Numerical uncertainties in the initial data are described as a tolerance error and tree graphs of uncertain data are constructed by numerical uncertainty combinations of each parameter. The structural responses calculated by all uncertainty cases can be easily estimated so that structural safety can be included in the design. Numerical applications of truss and frame structures demonstrate the efficiency of the present method with respect to numerical analyses of structural uncertainties.