CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

Present and Future of Risk Management of Construction Practice in Asia

  • Watanabe, Tsunemi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.4-5
    • /
    • 2015
  • Owning to rapid infrastructure development, Asia is experiencing dramatic economic growth. There are not a few cases in which, however, economic growth is achieved by increasing the external diseconomy. Pursuit of sustainable development is one of the most important issues for mankind. Under the post-industrial capitalism society, however, there seems a big risk of increase in the external diseconomy worldwide. The objectives of this manuscript are to discuss importance of risk management of construction practice in present and future. Regarding the latter, a particular attempt is made to discuss how project risk communication should be done to reduce the external diseconomy. Presently, one of the important issues in implementation of infrastructure projects is practice of risk management to properly manage time, cost, quality, and safety: mainly maximization of internal economy. Multi-party risk and uncertainty management process (MRUMP) is one of tolls to assist it. The idea on MRUMP can be used to reduce the external diseconomy through identifying, sharing, and tuning people's rhythms.

  • PDF

Reaching Beyond the Science Education Guidelines: Project-Centered Approaches

  • Son, Yeon-A;Shin, Young-Joon;Lee, Yang-Rak;Choi, Don-Hyung
    • Journal of The Korean Association For Science Education
    • /
    • v.24 no.1
    • /
    • pp.29-47
    • /
    • 2004
  • Two project-centered secondary school programs were studied as part of an effort to elucidate successful components for science reform-based curriculum development. The Teachers for Exciting Science (TES), and Foundational Approaches in Science Teaching (FAST) programs in Korea and U.S., respectively, are project-centered programs because their curricula are centered on the activities initiated and engaged in by the students. Students serve as principal investigators in their projects, and teachers serve as guides. Both programs were analyzed based on criteria such as curriculum design, teaching, lives of students, lives of teachers, evaluation of program, from the Third International Mathematics and Science Study (TIMSS). In the programs, teachers and students directed the development of curricula and their implementation. Students assumed teacher roles as mentors of other students. And emphasis was on development of communication skills through student-delivered talks and written papers, and professional development of teachers as educators and scientists. Participation in TES stimulated secondary school student interest in science, encouraged inquiry thinking, increased achievement in learning science, and promoted better awareness of science related to real life. FAST students practice laboratory and field techniques, experimental design, hypothesis formation, generalization, and practical implications of research as academic and applied disciplinarians. These project-centered programs have been successfully implemented in field, lab, and classroom curricula for secondary science education. Comparison of these programs will provide an opportunity for identifying key elements instrumental in successful implementation of guidelines for science education, as measured through successful outcomes.

A Study on Conflicts in Restoration Projects of Modern Cultural Heritage for Sustainable Tourism Development -Focusing on Daebul Hotel, Jung-gu, Incheon- (지속가능한 관광개발을 위한 근대문화유산의 복원사업 갈등연구 -인천 중구 대불호텔을 중심으로-)

  • Hong-bo Shim
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.2
    • /
    • pp.159-169
    • /
    • 2023
  • The purpose of this study is, first, to establish a theory about the conflict between sustainable tourism development and the restoration process of modern cultural heritage. Second, a research model is established through literature research, and the difference in perception between the local government (Incheon Jung-gu Office) and the local residents is analyzed. Third, based on the results of the analysis, we will present a conflict management strategy for sustainable tourism development in the modern hotel restoration project. If a conflict management strategy is presented based on the analysis results, first, a procedure to confirm whether the goal of development for sustainable tourism development and local residents is the same before the modern cultural heritage restoration project is necessary. Second, it is necessary to coordinate opinions on priority items among sustainable tourism development indicators during the modern cultural heritage restoration project. Third, in the modern cultural heritage restoration project, priority should be given to the change of awareness of the development subject rather than the change of awareness of the local residents. Fourth, in the modern cultural heritage restoration project, the development entity should attempt continuous dialogue and compromise in an effort to find an alternative that satisfies local residents. Fifth, in the modern cultural heritage restoration project, it would be effective to pay special attention to and focus on the part of 'adjustment of opinions' where the difference of opinion between the developer and the local residents is the largest.

The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim- (건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 -)

  • Yoon Jun-Seon
    • Journal of Arbitration Studies
    • /
    • v.15 no.3
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

DEVELOPMENT OF BIM-BASED DECISION-MAKING SUPPORT SYSTEM FOR APARTMENT REMODELING

  • Dong-Gun Lee;Sik Kim;Hee-Sung Cha;Ju-Yeoun Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1117-1123
    • /
    • 2009
  • Compared with other industries, the construction Industry has many parties(A/E/C) as well as many types of construction activities. Especially, as for the remodeling project, the owner group the remodeling union consists of various stakeholders union and requiring the additional activities of demolition except for the existing new building construction project. Like this, the remodeling project has its own characteristics different from a new building construction project. As for the remodeling project, the Owner's decision making for a remodeling alternative has to be preceded, and other parties are required to propose a remodeling alternative which satisfies the Owner's requirements. However, because of time constraints, many types of problems occur during the decision-making process. In consideration of this, in this research, the authors would like to suggest a decision-making support system to help the Owner's decision-making in the early stage of a remodeling project. For this paper purpose of a remodeling decision-making framework based on Building Information Modeling(BIM) was suggested to help with the Owner's decision-making for each remodeling item and the decision-making support system was evaluated through Case Study.

  • PDF

QUANTIFICATION MODEL FOR APPLYING CONSTRUCTION MANAGEMENT PRACTICES IN CONSIDERATION OF PROJECT CHARACTERISTIC FACTORS

  • Hee Sung Cha;Jin Lee Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.624-627
    • /
    • 2013
  • No single project is identical to one another in the construction industry. Furthermore, many construction projects are suffering from tighter budget, shortened schedule and higher client satisfaction level. To overcome these, project managers and engineers are willing to apply various best management practices to their projects. However, it is non-trivial to select the most appropriate practices for their projects. In many cases, it is much more important to find the appropriateness of the management practices than just to use the practices. Although many researchers are focusing on the development of new management practices, there is little research on matching between the circumstances of projects and the developed management practices. The objective of this study is to provide a structured process to suggest the best management practices for individual construction projects by developing a computerized system where an individual project is matched with the most optimal management practices to increase the value of the project. At this stage of writing, the authors have developed a computerized system to effectively find out the best suitable management practices for individual projects. By maximizing the usages of this system, it would facilitate the application of the best management practices in the industry.

  • PDF

Raffles City in Hangzhou China -The Engineering of a 'Vertical City' of Vibrant Waves-

  • Wang, Aaron J.
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.1
    • /
    • pp.33-47
    • /
    • 2017
  • This mixed-use Raffles City (RCH) development is located near the Qiantang River in Hangzhou, the capital of Zhejiang province, located southwest of Shanghai, China. The project incorporates retail, offices, housing, and hotel facilities and marks the site of a cultural landscape within the Quianjiang New Town Area. The project is composed of two 250-meter-tall twisting towers with a form of vibrant waves, along with a commercial podium and three stories of basement car parking. It reaches a height of 60 stories, presenting views both to and from the Qiantang River and West Lake areas, with a total floor area of almost 400,000 square meters. A composite moment frame plus concrete core structural system was adopted for the tower structures. Concrete filled steel tubular (CFT) columns together with steel reinforced concrete (SRC) beams form the outer moment frame of the towers' structure. The internal slabs and floor beams are of reinforced concrete. This paper presents the engineering design and construction of this highly complex project. Through comprehensive discussion and careful elaboration, some conclusions are reached, which serve as a reference guide for the design and construction of similar free-form, hybrid, mix-use buildings.

Current Practices of Collecting and Utilizing Daily Work Report Data and Areas for Improvements

  • Shrestha, K. Joseph;Jeong, H. David;Gransberg, Douglas D.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.205-209
    • /
    • 2015
  • A significant amount of data including ongoing construction activities, work quantities, resources utilized by contractors, and site conditions is collected in highway construction sites on a daily basis by resident engineers. This data is commonly known as daily work reports (DWRs) in the U.S. Although a lot of time and effort is invested in collecting the DWR data, its utilization has been very limited. This paper discusses current practices of collecting and utilizing DWR data among various Departments of Transportation in the U.S., and discusses the challenges and opportunities for better collection and utilization of the data. An extensive literature review and two nationwide surveys in the U.S. were conducted as a part of this study. Finally, it provides a set of recommendations to effectively address the challenges identified and maximize the benefits of utilizing DWR data such as supporting various decisions for highway project development process. The findings of this study are implementable ideas that can aid DOTs in making data-driven decisions throughout the project development processes in the future.

  • PDF

STRATEGIC ANALYSIS OF SINGAPORE CONSTRUCTION MARKET-A CHINESE CONTRACTOR'S PERSPECTIVES

  • Liu Yanzhe;David A. S. Chew;Ma Yanzhi
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.787-799
    • /
    • 2007
  • The Singapore construction market has just recovered from the decline of the last seven years. Past annual construction volume remains around S$10 to 12 billion and the market is saturated with local and international contractors. This study examined the competitiveness of the construction market from the perspective of a Chinese contractor. The case company in this study is China Construction (SP) Development Co Pte Ltd. The purpose of this study is to use strategic research and management methods to analyze the case company's internal and external environment and development strategies, so as to bring about the approaches and measures to achieve its strategic targets.

  • PDF