• Title/Summary/Keyword: integration of construction

Search Result 846, Processing Time 0.03 seconds

Performance Evaluation of Smart Intersections for Emergency Response Time based on Integration of Geospatial and Incident Data

  • Oh, Heung Jin;Ashuri, Baabak
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.945-951
    • /
    • 2022
  • The major objective of this research is to evaluate performance of improved intersections for response time to emergency vehicle preemption. Smart technologies have been introduced to civil infrastructure systems for resilient communities. The technologies need to evaluate their effectiveness and feasibility to confirm their introduction. This research focuses on the performance of emergency vehicle preemption, represented by response time, when smart intersections are introduced in a community. The response time is determined by not only intersections but also a number of factors such as traffic, distance, road conditions, and incident types. However, the evaluation of emergency response has often ignored factors related to emergency vehicle routes. In this respect, this research synthetically analyzes geospatial and incident data using each route of emergency vehicle and conducts before-and-after evaluations. The changes in performance are analyzed by the impact of smart intersections on response time through Bayesian regression models. The result provides measures of the project's performance. This study will contribute to the body of knowledge on modeling the impacts of technology application and integrating heterogeneous data sets. It will provide a way to confirm and prove the effectiveness of introducing smart technologies to our communities.

  • PDF

Evaluation on the Possibility of Connection Between IFC and Digital Quantity DataBase Exchange Standard (IFC와 디지털 수량산출정보 교환표준의 연계 가능성 평가)

  • Won, Ji-Sun;Moon, Jin-Seok;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6488-6494
    • /
    • 2013
  • Recently, BIM has attracted attention as a technology to improve the construction productivity. The BIM standards to be applied to the BIM project are necessary for using or connecting the current 2D-based drawing standards. To develop the standard for BIM-based QTO and cost, this paper focused on using QDBEx, which was applied to road project cost management and connecting QDBEx with IFC, which is the BIM data delivery format. The IFC schema was evaluated to determine if it is possible to use the converts to the QDBEx XML file. As a result, 66% of the whole was available to connect directly, and 17% was available to connect through the processing of instance. The remaining 17% was evaluated to determine if it was available to connect. In the future, improvements in the schema will be suggested based on these results.

Integration Technique of Smart Infra Management for Smart City Construction

  • Yeon, Sangho;Yeon, Chunhum
    • International Journal of Contents
    • /
    • v.15 no.2
    • /
    • pp.75-78
    • /
    • 2019
  • The Integration technique of combining the measurement method with the fine precision of the sensor collecting the satellite-based information to determine the displacement space is available to a variety of diagnostic information. The measurement method by a GNSS with the sensors is needed since there will always be occasional occurrence of natural disasters caused by various environmental factors and the surroundings. Such attempts carried out nationally by distributed torsional displacement of the terrain and facilities. The combination of the various positioning analysis of mm-class for the facility of main area observed is required constantly in real time information of the USN/IoT Smart sensors and should be able to utilize such information as a precisely fine positioning information for the precisely fine displacement of the semi-permanent main facilities. In this study, for the installation of the receiving system, the USN/IoT base line positioning are easily accessible for the target bridges. Transmitting hourly from the received data is also executed in real time using the wireless Wi-Fi/Bluetooth bridges and related facilities to automatically process a fine position displacement. The results obtained from this method can be analyzed by real-time monitoring for a large structure or facilities for disaster prevention.

Comparison of Reinforced Concrete Construction Technology between North and South Korea (남북한 철근콘크리트 시공기술 비교)

  • Baek, Cheong-Hoon;Kim, Eun-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.208-209
    • /
    • 2020
  • There is no disagreement that the construction sector will play an important role in inter-Korean economic development cooperation. However, very few studies have been made at North Korea's construction technology. North Korea shows a lot of differences from South Korea, from the quality standards of building materials to construction technology. It is clear that these differences will be a stumbling block to the promotion of construction projects in the inter-Korean cooperation stage. Therefore, the start of inter-Korean economic development cooperation should be preceded by work to clearly recognize each other's differences and lay the foundation for integration or compatibility. The purpose of this study is to compare the construction technology of rebar concrete construction. We compared the differences with Korea's construction method based on the construction books recently published in North Korea, and derived the characteristics of North and South Korea for each detailed process of reinforced concrete construction.

  • PDF

Research on the Integration and Coexistence Path of Innovation and Entrepreneurship Education and Professional Education in Universities (대학교 혁신 창업 교육과 직업 교육의 융합과 공존 경로 연구)

  • Xiaoyue Song;Jinling Wang
    • Journal of the International Relations & Interdisciplinary Education
    • /
    • v.3 no.1
    • /
    • pp.29-50
    • /
    • 2023
  • This study selected college students in Anhui Province as the research subjects and used a questionnaire survey method to understand the current implementation status of the integration of innovation and entrepreneurship education and professional education. The survey results indicate that college students have insufficient awareness of innovation and entrepreneurship; Poor integration of curriculum construction. This study analyzes the reasons for the problems from four aspects: the government, enterprises, and universities, as well as the subjective will of students. Based on qualitative and quantitative research, the following countermeasures and suggestions are proposed: firstly, strengthen top-level design; Secondly, promote the integration of curriculum construction; Thirdly, expand the teaching staff; Fourthly, a practical platform for school enterprise co creation; Fifth, cultivate students' innovative awareness and guide innovative practice.

Meshfree consolidation analysis of saturated porous media with stabilized conforming nodal integration formulation

  • Wang, Dongdong;Xie, Pinkang;Lu, Hongsheng
    • Interaction and multiscale mechanics
    • /
    • v.6 no.2
    • /
    • pp.107-125
    • /
    • 2013
  • A strain smoothing meshfree formulation with stabilized conforming nodal integration is presented for modeling the consolidation process in saturated porous media. In the present method, nodal strain smoothing is consistently introduced into the meshfree approximation of strain and pore pressure gradient variables associated with the saturated porous media. Meanwhile, in order to achieve a consistent numerical implementation, a smoothing approximation of the meshfree shape function within a nodal representative domain is also proposed in the stiffness construction. The resulting discrete system of equations is all expressed in smoothed nodal measures that are very efficient for numerical evaluation. Subsequently the space-time fully discrete equations are further established by the generalized trapezoidal rule for time integration. The effectiveness of the proposed meshfree consolidation analysis method is systematically illustrated by several benchmark problems.

A study on the non-integrated use of BlM (비통합적 BlM의 적용 가능성에 관한 연구)

  • Choi, Jong-Chon;Kim, Khil-Chae
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.8 no.2
    • /
    • pp.21-28
    • /
    • 2008
  • The main purpose of this paper is to find the phase-in of BIM adoption by focusing on the level of integration. BlM should be aimed at integration and collaboration of all parties furnishing design and construction services to increase the productivity. Therefore, the degree and depth of integration for project collaboration is very important to BlM design process. One of the key advantages of full integration is that is to facilitates the development of detailed information much earlier in the entire design process to improve collaboration among stakeholders. Such integrated use is the ultimate method, but even so, it's not the precondition of BlM. One of the key advantages of relatively low integration as a transition phase is to adopt the BlM earlier than full integration. Such transitional and non-integrated BIM can also reduce the possibility of trial and error in BlM adoption. Therefore, this paper focused on non-integrated use of BlM as a substitute of full IPD by analyzing obstacles in BIM adoption.

  • PDF

USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF

A Mobile Application Plan of The Construction CALS (건설사업정보시스템의 모바일 기술 적용 방안)

  • Ok, Hyun;Kim, Young-Jin;Yang, Sung-Hoon;Kim, Jin-Uk
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2014.07a
    • /
    • pp.415-416
    • /
    • 2014
  • 본 연구에서는 ICT 기술특성을 건설 전 생애주기에 걸쳐 활용하여 미래 건설 환경 변화에 신속하게 대응하고, 시간과 장소에 구애 받지 않고 실시간 현장 업무를 지원할 수 있도록 건설사업정보시스템(CALS)의 하위 업무시스템인 건설사업관리시스템, 시설물유지관리시스템, 건설인허가시스템, 용지보상시스템에 모바일 기술을 적용하는 스마트화 방안을 제시하였다.

  • PDF

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.