• 제목/요약/키워드: integrated process

검색결과 4,448건 처리시간 0.029초

BIM정보를 활용한 강구조물의 공정 물량 통합관리 (Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information)

  • 김진욱;신태송
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

공학공차설계와 6시그마 공차설계를 통합한 공차설계 적용 사례 - 광학 디스크 드라이브 스핀들 모터 - (Case of Integrated tolerance design process by Engineering tolerance design and 6 Sigma Tolerance Design - Spindle Motor For Optical Disc Drive -)

  • 김용태;이상복
    • 품질경영학회지
    • /
    • 제42권4호
    • /
    • pp.563-578
    • /
    • 2014
  • Purpose: The purpose of this paper is integrated tolerance design process by advantages of engineering design and 6 sigma statistical tolerances design. Methods: Integrated tolerance design process can determine the goals by using engineer's experience and clarify tolerance by 6 Sigma statistical methods. Integrated design process can be applied by using non-linear simulations. Results: We applied integrated design process to the optical disc drive spindle motor and get good result. Conclusion: If this method is applied test method in the early stages of development, then Design can be reduced development time and cost.

집단중심 추세모형을 적용한 과학고등학교 학생들의 통합 탐구 기능 변화 분석 (Analyzing the Change of Science High School Students' Integrated Process Skills Using Group-based Trajectory Modeling)

  • 이기영;하민수;박재용
    • 한국지구과학회지
    • /
    • 제41권1호
    • /
    • pp.48-60
    • /
    • 2020
  • 이 연구의 목적은 집단중심 추세모형을 적용하여 과학고 학생들이 탐구를 수행하는 과정에서 나타난 통합 탐구 기능 변화의 양상과 특징을 분석하는 것이다. 이를 위해 3개의 가설-연역적 탐구 과제를 이용하였으며, 이를 59명의 과학고 학생들에게 순차적으로 수행하게 하고 그 과정을 보고서로 작성하게 하였다. 작성된 보고서는 Lee and Park(2017)에 의해 개발된 평가 준거틀에 따라 통합 탐구 기능 4개 요소별로 평가하였으며, 이를 집단중심 추세모형에 적용하여 탐구 과제를 수행한 3개 시점에 따른 탐구 기능 수준의 변화 양상을 요소별로 분석하였다. 또한, 탐구 기능 변화에서 나타난 특징을 몇 가지 관점에서 분석하였다. 연구 결과는 다음과 같다: 첫째, 집단중심 추세모형을 적용하여 학생들의 통합 탐구 기능 변화 양상을 분석한 결과, 4개 요소 모두에서 2개 집단으로 분류되었으나 그 변화 양상은 요소별로 많은 차이가 있었다. 둘째, 학생들의 통합 탐구 기능 변화에서 나타난 특징을 분석한 결과, 탐구 기능의 맥락의존성, 탐구 기능 발달 경로의 변이성, 탐구 기능 요소별 수준의 들쭉날쭉성을 발견할 수 있었다. 연구 결과를 토대로 과학고 학생들의 통합 탐구 기능 발달을 위한 제언을 하였다.

BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구 (A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms)

  • 이진희;전한종
    • 한국실내디자인학회논문집
    • /
    • 제16권6호
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

중수 재이용을 위한 오존 고도산화 및 세라믹 분리막 일체형 공정의 최적화 연구 (Optimization of an Advanced Oxidation with Ozone and Ceramic Membrane Integrated Process for Greywater Reuse)

  • 이종훈;노호정;박광덕;우윤철
    • 한국물환경학회지
    • /
    • 제37권6호
    • /
    • pp.433-441
    • /
    • 2021
  • The aim of this study was to optimize the ozonation and ceramic membrane integrated process for greywater reclamation. The integrated process is a repeated sequential process of filtration and backwash with the same ceramic membrane. Also, this study used ozone and oxygen gas for the backwashing process to compare backwashing efficiency. The study results revealed that the optimum filtration and backwash time for the process was 10 minutes each when comparing the filtrate flow and membrane recovery rate. The integrated process was operated at three different operating conditions with i) 10 minutes for filtration and 10 minutes for ozonation, ii) 10 minutes for filtration and 10 minute for oxygen aeration, and iii) continuous filtration without any aeration for synthetic greywater. The integrated process with ozone backwashing could produce 0.55 L/min of filtrate with an average of 18.42% permeability recovery, while the oxygen backwashing produced 0.47 L/min and 6.26%, respectively. And without any backwashing, the integrated process could produce 0.29 L/min. This shows that the ozone backwash process is capable of periodically recovering from membrane fouling. The resistance of the fouled membrane was approximately 34.4% for the process with ozone backwashing, whereas the resistance was restored by 10.8% for the process with oxygen backwashing. Despite the periodical ozone backwashing and chemical cleaning, irreversible fouling gradually increased approximately 3 to 4%. Approximately 97.6% and 15% turbidity and TOC were removed by ceramic membrane filtration, respectively. Therefore, the integrated process with ozonation and ceramic membrane filtration is a potential greywater treatment process.

동정 네트 모델에 의한 공정 계획과 일정 계획의 통합 (A Process-net based System for the Integration of Process Planning and Operation Scheduling)

  • 박지형;강민형;노형민
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1997년도 춘계학술대회 논문집
    • /
    • pp.445-449
    • /
    • 1997
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper,an integrated system of process planning and operations scheduling based on the concept of process net model is presented. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

공정 네트 모델과 유전 알고리즘에 의한 공정 계획과 일정 계획의 통합 (Integration of Process Planning and Operations Scheduling by Process Net Model and Genetic Algorithm)

  • 박지형;강민형;노형민
    • 한국정밀공학회지
    • /
    • 제15권3호
    • /
    • pp.82-87
    • /
    • 1998
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper, an integrated system of process planning and operations scheduling based on the concept of process net model and genetic algorithm is suggested. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

동시적 업무수행을 위한 통합된 시스템 설계 프로세스연구 (Research of Integrated System Design Process for Concurrency Design Activity)

  • 김진훈;박영원
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 2004년도 품질경영모델을 통한 가치 창출
    • /
    • pp.103-108
    • /
    • 2004
  • This paper will describe integrated system design process and its application. Integrated design process is performed activities concurrently and sequentially for product development. For a group of activities to be truly integrated, the flow of deliverables among them must be well defined, and committed to. For this purpose, the study will suggest procedure that is executed context analysis of standard process, interface definition from activity decomposition, integration of related activities, and definition of concurrency & sequential activities flow, This procedure and method will contribute to minimize time loss that is emerged from activities iteration by not definitely definition of activities interface.

  • PDF

악기를 활용한 음악.과학 통합활동이 유아의 음악적 개념 및 과학적 과정기술에 미치는 영향 (The Effects of Music and Science Integrated Activities Using Instruments on the Musical Concept and Science Inquiry Process Skill)

  • 이정화;한희승
    • 아동학회지
    • /
    • 제31권1호
    • /
    • pp.283-300
    • /
    • 2010
  • This paper investigated the effect of music and science integrated activities using instruments designed to test both musical concept and science inquiry process skills of children. The subjects of this study consisted of two classes of children aged 5 at H Kindergarten in Busan city. This study involved a class of 31 children using a music and science integrated curriculum as the experimental group and another class of 32 children using a traditional music and science curriculum as the control group. The integrated activities were used 12 times over a 6-week period. A test was taken to evaluate the effects of the integrated activities on the children's understanding on seven sub-categories of musical concepts and six sub-categories of science inquiry process skills. The results were that the experimental group showed significantly higher improvements in all subcategories of musical concept and science inquiry process skills, compared to the control group. Based on these results, we concluded that these integrated activities were effective in the development of both musical concepts and the science inquiry process skills of children.

Integrated engineering environment for the process FEED of offshore oil and gas production plants

  • Hwang, Ji-Hyun;Roh, Myung-Il;Lee, Kyu-Yeul
    • Ocean Systems Engineering
    • /
    • 제2권1호
    • /
    • pp.49-68
    • /
    • 2012
  • In this paper, an offshore process front end engineering design (FEED) method is systematically introduced and reviewed to enable efficient offshore oil and gas production plant engineering. An integrated process engineering environment is also presented for the topside systems of a liquefied natural gas floating production, storage, and offloading (LNG FPSO) unit, based on the concepts and procedures for the process FEED of general offshore production plants. Various activities of the general process FEED scheme are first summarized, and then the offshore process FEED method, which is applicable to all types of offshore oil and gas production plants, is presented. The integrated process engineering environment is presented according to the aforementioned FEED method. Finally, the offshore process FEED method is applied to the topside systems of an LNG FPSO in order to verify the validity and applicability of the FEED method.