Journal of electromagnetic engineering and science
/
제13권4호
/
pp.233-239
/
2013
This paper proposes an accurate approach for predicting transferred power from a noise source to integrated circuits based on the characteristics of the power transfer network. A power delivery trace on a package and a printed circuit board are designed to transmit power from an external source to integrated circuits. The power is demonstrated between an injection terminal on the edge of the printed circuit board and integrated circuits, and the power transfer function of the power distribution network is derived. A two-tier calibration is applied to the test, and scattering parameters of the network are measured for the calculation of the power transfer function. After testing to obtain the indispensable parameters, the real received and tolerable power of the integrated circuits can be easily achieved. Our proposed estimation method is an enhancement of the existing the International Electrotechnical Commission standard for precise prediction of the electromagnetic immunity of integrated circuits.
미래전의 양상은 첨단과학기술의 발전에 따라 다양한 유·무인 전투체계들이 전투를 수행하는 것으로 변화하고 있다. 미래의 무기체계들은 대량의 정보를 생성하고 송·수신하게 되며, 이에 따라 현재의 전술정보통신체계는 미래의 기반 통신체계로 운용하기에 제한된다. 또한 군단급 이상의 대규모 제대의 정보유통량을 분석하기 위해서는 전장에서 발생할 수 있는 다양한 상황들을 고려하여야 한다. 이에 본 논문에서는 Army TIGER 군단의 정보유통량을 분석하기 위해 지상망 단독 운용, 통합망 운용, 부하 분산, 장애 극복 시나리오 등 네 가지 시나리오를 기반으로 한 M&S 결과를 분석한다. 또한 지상·공중·우주망이 통합된 다계층 통합 전술통신망의 운용을 통해 네트워크의 신뢰성과 안정성을 향상할 수 있음을 제시한다.
본 연구에서는 상수관망의 신뢰도해석을 위해 수리적 신뢰도와 기계적 신뢰도를 통합적으로 해석할 수 있는 통합신뢰도 해석모형을 개발하였다. 수리적 신뢰도는 불화실성을 가진 변수들에 대하여 적절한 변동계수를 가진 확률 분포형을 적용시켜 임의변수로 고려하였고 기계적 신뢰도는 관망의 각 구성물에 대해 순차적 고장을 발생시켜 각 고장에 대한 영항을 해석하여 신뢰도를 산정하였다. 덕 연구모형을 실제관망에 대한 적용결과 본 모형은 실제관망에 대한 불확실한 요소를 고려한 신뢰도를 잘 모의하고 있었다. 앞으로 신뢰성있는 상수관망 설계 및 기존 관망의 신뢰도 판정에 본 모형이 적용된다면 기계적 및 수리적으로 객관성이 있는 신뢰도를 가진 상수관망의 건설 및 유지관리가 될 수 있다고 판단된다.
본 논문에서는 대 면적 기판 집적 도파관 전력 분배 네트워크(Substrate Integrated Waveguide Power Distribution Network: SIW PDN)의 출력 단자 간 위상차를 제거하기 위해 유전체 나사를 적용한 가변 기판 집적 도파관(SIW: Substrate Integrated Waveguide)을 제안한다. 본 제안 구조는 가변 기판 집적 도파관에 비 도금된 비아 홀에 부분적으로 유전체 나사를 삽입하여 S-parameter의 크기에 거의 영향을 주지 않고 위상 천이를 이룬다. 이로써, 유전체 나사가 삽입되지 않은 가변 기판 집적 도파관이 적용된 대 면적 SIW PDN($370\;mm{\times}195\;mm$)의 측정된 ${\pm}33.9^{\circ}$의 위상 차이가 본 제안 구조를 통하여 ${\pm}4.65^{\circ}$까지 크게 감소되었다. 본 논문에서 제안된 유전체 나사를 이용한 가변 SIW는 향후 초경량, 고성능 기판 집적 위상 배열 시스템 및 대 면적 SIW 회로 응용에 중요한 역할을 할 것으로 기대된다.
본 논문은 저압 감시 기능을 포함하는 개선된 배전자동화시스템 개발에 관한 연구 결과를 소개한 것으로서 연구배경, 시스템 구성, 설계, 시제품 제작, 시험 및 실계통 시범운영 등 전반적인 사항을 설명한다. 개발 시스템은 배전현장에서 별도로 수행 중인 변압기 부하감시, 전압감시 및 정전감시 및 품질감시 업무를 배전자동화시스템에 통합하여 운영함으로써 보다 경제적이고 효율적인 배전망의 운영을 위하여 개발되었다. 시스템 통합을 위한 통신망은 간선망과 지선망을 갖도록 계층적으로 구성하고, 변압기 부하 측의 저압 감시를 위한 단말장치를 새로 개발하였다. 또한, 기존 배전자동화시스템에 저압 감시 기능을 추가하기 위하여 주장치 소프트웨어를 개선하였다. 개발 시스템은 실계통 시범운영을 통하여 설계 및 성능이 검증되었다.
This paper presents a design and implementation of an intelligent-integrated production-logistics systems. The situation considered here is that there are multiple manufacturing plants and multiple distribution centers. Effective distribution resource and production planning are required to reduce inventory cost and to avoid inventory shortage. We propose an intelligent forecasting scheme of each distribution centers, adaptive inventory replenishment planning, distribution resource planning, and integrated production planning system. In forecasting a huge number of on-line model identification is performed using neural network approximation capability. An efficient adaptive replenishment planning and distribution resource planning are also presented in connection with forecasting scheme. An appropriate production is also requested based on production lead-time and the results of distribution planning. Experimental simulations are presented to verify the proposed approach using real data.
In this paper, a new algorithm of Integrated Volt/Var Control (IVVC) is proposed using Volt/Var control for the Distribution Automation System (DAS) based on the modeling of the distributed load and the distributed current. In the proposed, the load flow based on the modeling of the distributed load and the distributed current are estimated from constants of four terminals using the measurement of the current and power factor from a Feeder Remote Terminal Unit (FRTU). For Integrated Volt/Var Control (IVVC), the gradient method is applied to find optimal solution for tap and capacity control of OLTC (On-Load Tap Changers), SVR (Step Voltage Regulator), and SC (Shunt Condenser). What is more Volt/Var control method is proposed using moving the tie switch as well as IVVC algorithm using power utility control. In the case studies, the estimation and simulation network have been testified in Matlab Simulink.
In this paper, we study a cross-layer and end-to-end optimization problem for the integrated wireless and wireline network that consists of one wireline core network and multiple wireless access networks. We consider joint end-to-end flow control/distribution at the transport and network layers and opportunistic scheduling at the data link and physical layers. We formulate a single stochastic optimization problem and solve it by using a dual approach and a stochastic sub-gradient algorithm. The developed algorithm can be implemented in a distributed way, vertically among communication layers and horizontally among all entities in the network, clearly showing what should be done at each layer and each entity and what parameters should be exchanged between layers and between entities. Numerical results show that our cross-layer and end-to-end optimization approach provides more efficient resource allocation than the conventional layered and separated optimization approach.
Many of companies have made significant improvements for globalization and competitive business environment The supply chain management has received many attentions in the area of that business environment. The purpose of this study is to generate realistic production and distribution planning in the supply chain network. The planning model determines the best schedule using operation sequences and routing to deliver. To solve the problem a hybrid approach involving a genetic algorithm (GA) and computer simulation is proposed. This proposed approach is for: (1) selecting the best machine for each operation, (2) deciding the sequence of operation to product and route to deliver, and (3) minimizing the completion time for each order. This study developed mathematical model for production, distribution, production-distribution and proposed GA-Simulation solution procedure. The results of computational experiments for a simple example of the supply chain network are given and discussed to validate the proposed approach. It has been shown that the hybrid approach is powerful for complex production and distribution planning in the manufacturing supply chain network. The proposed approach can be used to generate realistic production and distribution planning considering stochastic natures in the actual supply chain and support decision making for companies.
The government has proposed a mission to enhance intelligent power networks, decrease coal-fired generation, expand distributed energy resources, and promote energy prosumer into the distribution network in Korea. Installation cost of facility expansion to guaranteed interconnection with small distributed energy resources increases dramatically on KEPCO's distribution sector. And it is hard to withdraw in time. In addition, there are explicit research is required to meet the reliability on grid corresponding to the increase of distributed power. Infrastructure support for accommodating energy prosumer is also needed. Therefore, KEPCO is pushing transition to DSO by expanding distribution management scope and changing its roles. In addition, KEPCO is proactively preparing for integrated operation between distribution network and existing distributed power which is accommodated passively. KEPCO is also trying to accept multiple network users, e.g. building platforms, to manage a data and promote new markets. In the long term, transition to DSO will achieve saving investment costs for accommodating distributed sources and maintaining stable electrical quality. And it will be possible to create new business model using the platform to secure revenue.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.