• Title/Summary/Keyword: installation and maintenance plan

Search Result 53, Processing Time 0.027 seconds

Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel (지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안)

  • Woo, Jong-Tae;Kim, Jong-Soo;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities (방폭설비 성능유지 실태분석을 통한 관리방안 연구)

  • Kwon, Yong Jun;Byeon, Junghwan
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

Case Study on Analysis the Problem and Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 문제점 분석 및 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03c
    • /
    • pp.93-104
    • /
    • 2000
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the methods of improvement were proposed for applying to subway monitoring maintenance effectively in future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

A Study on the Maintenance Plan Considering Maintenance Cycle of Wind Turbine Component (각 컴포넌트 유지보수 주기를 고려한 풍력발전 설비의 유지보수 계획에 관한 연구)

  • Lee, Yun-Seong;Shin, Jun-Hyun;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.5
    • /
    • pp.39-45
    • /
    • 2013
  • Wind power is one of the fastest growing renewable energy sources. In these days, wind turbine shifts from onshore to offshore because the offshore wind farm has a abundant wind resource. However, offshore wind turbine is not easy to access, it has a long downtime when the failures of the wind turbine component occur. Therefore, the appropriate wind turbine maintenance plan is required to meet the economic and reliability of the components. This paper proposes the maintenance planning method based on the RCM(Reliability Centered Maintenance) to determine an economical maintenance cycle to satisfy the appropriate reliability of the wind turbine components. In order to compare the proposed method with the conventional RCM method, critical components are selected in the case study because they have a long downtime and a large amount of total cost.

Cost Breakdown Structure for Reasonable Maintenance of Educational Facilities (교육시설물의 합리적인 유지관리를 위한 비용분류체계)

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Kim, Tae-Hui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.65-67
    • /
    • 2011
  • It is necessary to the development of the best maintenance system for applying the long-term maintenance plan using the cost breakdown structure in the educational facilities. This study developed the cost breakdown structure for the best maintenance system using the delphi method. For the convenience of maintenance, the maintenance cost breakdown structures are separated into building exterior wall, building inside wall, electric installation, heating installation and outdoor facilities. And these results atomized in each parts. And this study constructed the cost breakdown structure to maintenance's practicality and effectiveness through the expert analysis.

  • PDF

Study on a Optimal Inspection Cycle of Electrical facility of Railroad (철도전기설비의 최적점검주기에 관한 기초연구)

  • Chu, Cheol-Min;Kim, Jae-Chul;Lee, Tae-Hee;An, Jae-Min;Moon, Jong-Fil
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.224-228
    • /
    • 2007
  • It is focused on a methodology to establish a optimal inspection cycle of electrical facility of railroad Decision method of optimal inspection cycle is a process which establishes maintenance plan for facilities' immanent function as using reliability theory in operation term In order to ensure normal operation in a given condition, the decision method is logical for selecting effective maintenance plan to consider characteristic of system In estimation of failure rate, critical facility is selected firstly. After that, proper distribution function on each facility is decided to investigate distribution function for extraction of failure rate. Next, cost produced by the case that facility's failure is occurred is surveyed. Finally, maintenance method developed until now is investigated, before suitable model for the facility applying maintenance method is developed, and that maintenance decision is made. Therefore, this process is the method to find optimal inspection cycle for reasonable cost and effective reliability on facility.

  • PDF

LoRa LPWAN-based Wireless Measurement Sensor Installation and Maintenance Plan (LoRa LPWAN 기반의 무선 계측센서 설치 및 유지관리 방안)

  • Kim, Jong-Hoon;Park, Won-Joo;Park Sang-Hyun, Jin-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.1
    • /
    • pp.55-61
    • /
    • 2020
  • Social infrastructure facilities that have been under construction since the country's high-growth period are undergoing rapid aging, and, thus, safety assessments of large structures such as bridge tunnels, which can be directly linked to large-scale casualties in the event of an accident, are necessary. It is difficult to construct economical and efficient wireless smart sensor networks that improve structural health monitoring (SHM) because the existing wire sensors have a short signal reach. However, low-power wide-area networks (LPWANs) are becoming popular within the Internet of Things, and enable economical and efficient SHM. In this study, the technology trends of a wireless measuring sensor based on LoRa LPWANs were investigated, and an installation and maintenance plan for this type of sensor is proposed.

The Most Suitable Plan of Automatic Domestic Solid Waste Collection System for Land Development Area (택지개발지구의 쓰레기자동집하시설 최적규모 연구)

  • Lee, Joon-Young
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.1
    • /
    • pp.28-34
    • /
    • 2009
  • The objective of this study was to draw the most suitable plan of an automatic domestic solid waste collection system for land development area. The results of this study indicated that the most suitable plan is identified as a land development area larger than 3,600,000 $m^2$ located in the metropolitan area with an incinerator system (or MBT). There are the cases smaller than the standard area but this may cause additional allotment from the residents. According to a rating method to compute the size of the most suitable plan, installation of an automatic clean network has to be minimized if the rated score is below 2.0. On the other hand, the installation is required if the rated score is above 2.5. For a certain circumstance, a cautious decision has to be made for installation of the automatic domestic solid waste collection system by considering the influence of the initial cost, sale price, residential allotment, and maintenance cost on the land development.

Reliability-Centered Maintenance of Generating Unit Using Stochastic FMECA (확률론적 FMECA를 이용한 발전설비의 신뢰도 기반 유지보수계획 수립)

  • Joo, Jae-Myung;Kim, Dong-Min;Byeon, Yoong-Tae;Kim, Hyung-Chul;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.1
    • /
    • pp.58-65
    • /
    • 2008
  • Reliability-Centered Maintenance plan for maintenance schedule of generating unit is being assessed in this paper. Maintenance schedule is a key index that can be used to determine stability and cost. In this paper, stochastic FMECA is described for the life assessment by using probability distribution, and combustion-turbine generations in Korean power systems have been assessed for maintenance schedule. Such an assessment can be a useful guide for maintenance plans in restructured power industry.

The Establishment Plan of Strong-Motion Instrumentation of Dams for Monitoring of Seismic Behavior and Taking An Urgent Countermeasure (댐의 지진관측 및 내진대책 수립을 위한 지진계측시스템 구축 방안에 관한 연구)

  • Oh, Byung-Hyun;Lee, Jong-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1588-1595
    • /
    • 2005
  • In this study, the installation location of accelerometer and accelerograph for dam are investigated in the field to establish of emergency action against dam failure when earthquake occur and to guarantee the results of seismic stability of dams which are analysed with dynamic analysis method during 1999 to 2003 by KOWACO. By a comparative study concerning of domestic and foreign guidelines of seismic strong motion instrumentation for dams, "Guidelines of Seismic Strong-Motion Instrumentation Installation, Operation and Maintenance for Dams" is established to set up the standard of seismic strong-motion instrumentation for dam, are supervised by KOWACO There is some problems in taking a measure of stability of dams when earthquake event occur because the existing seismic strong motion instruments are operated independently. This make difficult to confirm the occurrence of seismic event. For that reason, in this study the plan of unified operation and maintenance system for strong-motion instrument for dams is designed. It will make possible real-time seismic monitoring, data transmission and receiving, giving warning for earthquake, and exchanging data with national seismic network.

  • PDF