The purpose of this stuffy is to derive critical success factors for ERP system implementation by integrating managerial, technical. human resource and organizational culture factors welch have been proposed as influencing factors for the performance of ERP system implementation in previous studios. Especially, this stuffy divides ERP system implementation process into preparation stave, implement stage and settle-down and stabilization stave, and then derives critical success factors in each stage. The data for empirical analysis of the research model are collected from 64 companies and the respondents for questionnaire consist of ERP system implementation project managers and user department managers in companies which have already operated it after ERP system installation. The main results of this study are as follows. First, it derives 27 success factors through comprehensive review of various factors which may affect ERP system implementation performance, and categorizes them into one of three stapes preparation stave, implement stage, and settle-down and stabilization stage. Second, the relationship between many success factors at each stave (preparation stave, implement stage, and settle-down and stabilization stave) and performance variables is tested. As a result, the significant correlations between many success factors at each stage and ERP system implementation performance are found, and the difference among success factors in the degree of influencing the system performance is significantly shown. finally, the relationship between process-oriented performance variables and result-oriented performance ones is tested. As a result, it is found that there is significant correlation between process-oriented performance variables except for one variable-project resource management appropriateness - and result-oriented performance ones. The theoretical contribution of this study is to derive a comprehensive model of critical success factors for implementing ERP system project from the system deve1opment life cycle perspective, and empirically test it through field survey with a wide range of data collection. And, the practical implication of this study is to present the desirable guidelines for performing ERP system implementation project successfully.
KSLV (Korea Space Launch Vehicle)-I telemetry system will be composed of two telemetry streams: a lower stage telemetry stream and an upper stage telemetry stream. In this paper, the authors present design, implementation and test results of the upper stage telemetry interface for KSLV-I. The telemetry system currently is in the stage of the prototype model development, and its engineering model and flight model will be developed in the near future.
본 논문의 목적은 기존의 연구에서 ERP 시스템 구축성과에 영향을 미치는 요인들로 제시되었던 관리적, 기술적, 인적자원 및 조직문화적 요인 등 제반 영향요인들을 통합하여, ERP시스템 구축의 주요성공 요인을 도출하고자 하였다. 본 연구의 주요 결과로서는, 첫째, 기존의 연구에서 ERP시스템 구축성과에 영향을 미치는 제반 요인들을 종합적으로 고찰한 결과 33가지 성공요인을 도출하였다 또한, 도출된 성공요인을 사전 준비단계, 구현단계, 정착 안정화단계별로 구분하여 제시하였다. 둘째, ERP시스템 구축단계별 성공요인들이 ERP시스템 구축전략 유형에 따라서 시스템 구축성과와 상이한 상관관계를 갖는지를 검증하였다. 그 결과 BPR실시시기에 따라 일부 성공요인들이 성과변수와 상이한 상관관계를 나타냈다.
One of the most important issues in a small and medium sized enterprise (SME) is to identify how to apply IT to the organization so that it maximizes the effectiveness of IT. In general, a large company mainly plans to adopt, implement, and stimulate a new IT in a viewpoint of advanced IT system's capability for maximizing the effectiveness of IT. However, SME requires a totally different approach since SME's situation is different from a large enterprise's one. In this study, we investigate several factors that have an influence on the successful IT adoption and implementation of a SME through the case of Hwacheon. We also find out that CEO's support, CEO-initiating strategic meeting, IT development ability, and organizational compatibility in the introduction stage of IT are relatively more important than those in the implementation stage of IT, whereas IT flexibility, system quality, training and support, overcoming organizational resistance and performance improvement in the implementation stage of IT play critical roles in the IS success. Our results show that the advance of IT may not guarantee the success of IT implementation.
Journal of Construction Engineering and Project Management
/
제1권1호
/
pp.31-36
/
2011
Construction materials usually constitute a major portion of the total cost in a building construction project. Materials management Is made problematic by materials shortages, delays in supply, price fluctuations, damage and wastage, and lack of storage space. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the case studies reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia Is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.195-200
/
2011
Construction materials usually constitute a major portion of the total cost in a building construction project. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the interviews reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.
This study was made on the concerns and implementation of the ICT(Inormation and Communication Technology)-utilized lesson by home economics teacher. The objective of this study is to investigate the stages of concern and the level of use of the ICT-utilized lesson by home economics teachers in Kyunggi Province through the concerns based adoption model(CBAM) and to provide assistance for ICT-utilizing lesson to be efficiently adopted to home economics. This study made selected 200 schools by random sampling among 233 middle schools which have two or more home economic teachers and 21 or more classes in Kyunggi Province which has a total of 395 middle schools and mail-surveyed on 400 home economics teachers by means of questionnaire. The stages of concern. the levels of use and the types of implementation were used as instruments in this survey. The results of this study on the stages of concern. the levels of use and the type of implementation of the ICT-utilized lesson by home economics teachers in Kyunggi Province were as following: First. the highest point of the concern of home economics teachers of ICT-utilized lesson was the stage of awareness. the second highest point was the stage of management. the 3rd stage. and the stage of information. the lst stage. Second. the highest level of implementation of ICT-utilized lesson by home economics teachers was the level of mechanical use. the 3rd stage(30.4%), which followed by the level of orientation. the 1st stage(22.5%). and the level of nonuse(16.7%). the level of rountine use. the 4th stage(13.7%) the level of integration. the 5th stage(11.8%). the level of preparation 2(3.9%). and the level of renewal. the 6th stage(1.0%) Third, information search was the most in the type of ICT-use and in the course of lesson CD-ROM was used the most.. During ICT-utilized lesson. most of teachers used computer one to two hours a week mainly in the lessons of clothing life and eating life. Home economics teachers took the most training of how to use word-processor(68.6%) during computer education. and 60 teachers(66.0%) gave positive response about the effect of computer education on teacher's learning. Finally. the biggest problem with ICT-use in the teacher's learning was the long preparation time for lesson. and problem with ICT-utilized lesson was the burden of time and effort spent to buy needed materials and to recompose the existing materials for the lesson. Therefore. so as to adopt ICT-utilized lesson efficiently into school it is needed that active promotion for the lesson should be made to teachers. training teachers to raise their ability to use computer and various kinds of software should be expanded. and school authorities' financial and administrative assistance should be given for the smooth proceeding of the lesson.
Design VE (Value Engineering) has been basic design and implementation design separately, but due to the recent change in guidelines, it is changing to implement only once in the implementation design stage. However, in the implementation design stage, construction costs, plans, and specifications based on the volume details are almost completed. Therefore, it is effective to perform the function analysis step after identifying information analysis and key issues through CostModeling based on functional center for the selected target in the process of implementing the VE performance procedure.
Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.
본 논문에서는 다단계 구조의 유리수배 표본화율 변환기의 계산 효율성을 메모리 사용량과 초당 곱셈 수 측면에서 정량적으로 평가한다. 그리고 다단계 구조에서 해상도 보존 조건과 서로소 조건을 설명하고, 각 단계의 최적 변환 비율을 유리수배로 직접 얻을 수 있는 설계 과정을 제시한다. 실제 예로, 44.1KHz 에서 48KHz 로의 표본화율 변환기를 2단계 구조로 구현한 예를 보인다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.