• Title/Summary/Keyword: high-rise construction

Search Result 997, Processing Time 0.028 seconds

Research of Circuit Working Construction Elevator with Single-guide Rail and Multi-cages

  • Kun Zhang;Kaiqiang Wang;Di Li;Qing Sun;Zhen Ye;Wei Liu
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.137-144
    • /
    • 2022
  • As one of the most important vertical transportation equipment in super high-rise buildings, the construction elevator directly affects the project period, cost, and effectiveness. The paper proposes a new construction elevator with single-guide rail and multi-cages. It can solve the problems of single construction elevator capacity shortage and efficacy decrease with height reduction, the occupancy of plan and elevation position of multiple construction elevators, and extension of total construction period by cycling operation of multi-cages on a single-guide rail. The paper focuses on the design and research of the main components of the equipment, such as the rotating guide rail mechanism, vertical bearing mast tie system, segmented electrical power supply system, group control scheduling system, and safety anti-collision system.

Facade Cleaning Process Analysis For Construction Robot System Design of High-rise Building External wall Maintenance (고층건물 외벽 유지보수 건설로봇 시스템 개발을 위한 청소공정 작업절차 분석)

  • Kim, Dae-Geon;Kim, Bok-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.77-79
    • /
    • 2011
  • As residents and building owners demand maintenance that is required to achieve sustainable building performance, efficient building management methods are required. Even though the demand for maintenance systems is increasing, current maintenance work for high-rise buildings mostly uses conventional ropes and gondolas that pose a high risk of accidents and exhibit poor performance and efficiency. Thus, there is an urgent need to develop an automation robot system that can reduce accidents and improve the maintenance efficiency of the conventional high-rise building façade maintenance system. As a preceding work for the development of an automation robot system, this study classified and analyzed the work processes of actual construction sites and proposed basic techniques for the work mechanisms of the robot system by investigating the motions of cleaning workers.

  • PDF

Design and Quality Assurance Tests of Drilled Shafts of High Rise Buildings (고층 건물 현장타설말뚝기초의 설계 및 품질확인시험)

  • Cho, Chun-Whan;Seok, Jeong-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.585-592
    • /
    • 2006
  • Recently, many high rise buildings is planning and under construction over the world. The drilled shafts as a foundation of high rise buildings are often adopted fur the purpose of construction safety and construction cost effectiveness. It is common that the capacity of drilled shafts is beyond conventional conception. The reasonable design and quality assurance for the drilled shaft as foundation of high rise building become much more important since the drilled shafts should bear much higher working load. This paper reviews state of the art of the design and quality assurance for the drilled shafts as foundation of high rise buildings. And also some related suggestions are given in this paper.

  • PDF

A Study on Pricing Model of High-Rise Residential Buildings From the viewpoint of Landmark Factor

  • Sung-Kon Moon;Sang-Hyo Lee;Kyung-Min Min;Joo-Sung Lee;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.573-578
    • /
    • 2009
  • Previous research on super high rise buildings focused mostly on the use of public space from building plan perspective, survey of residents' satisfaction evaluation, construction technology and structural technology. But little research is done on the economic analysis of landmark factors. The purpose of this study is to find landmark factors that can be quantitatively measured, collect data on super high rise residential buildings in Seoul. Find the intrinsic values of the landmarks, and analyze how these values differ in areas with different densities, i.e. in 3 Gangnam-gus & Yeongdeungpo-gu and in other areas. It is expected that the results of this study can be used to set an appropriate price of super high rise building in consideration of its landmark value in different area

  • PDF

Organizational Approach for Enhancing the Performance of High-Rise Building Projects (초고층 건축프로젝트의 성과 향상을 위한 조직차원의 접근방법)

  • Hong Young-Tak;Song Sang-Hun;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.271-276
    • /
    • 2004
  • In recent years, many high-rise buildings have been constructed for the purpose of redevelopment of urban environments in Korea. However, generally the construction durations do not increase in proportion to the number of the floors or the height of the building. So new materials, equipments, and methods are applied to high-rise building construction in order to overcome this problem. In most cases, applying these new resources is considered mainly as the technical issue, and the organizational aspects of this is frequently overlooked. This study discussed the performance variance in time and identified the causes of time variance in high-rise building construction from organizational viewpoint .

  • PDF

The Study of Load Test Method for In-Site Casting Pile In High Rise Building. (초고층에서의 현장타설말뚝 재하시험방법 고찰)

  • Kim, Dae-Hak;Hong, Young-Kil;Han, Sung-Moo;Gu, Ung-Hwoe;Park, Chan-Duck
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.385-392
    • /
    • 2008
  • Modern city have had a lot of high-rise building in high standards and multi-level performance. Using of city space reach better stages by using integration. These skyscraper have increased working load on ground. that building is efficiently designed for that soil capacity is well applied. With material side, big size pile, high strength concrete and high strength steel is used for that getting enough lobby space and resisting load increased of high-rise building. limit load test and load transmitted test can make soil capacity optimized. By the way, method of measuring pile capacity is more advanced and bigger. pile type applied by high rise building have underground excavation space, also reflect regional soil property and have some fact reviewed. A lot of high rise building recently is built as land mark in Seoul, Busan and Incheon. about method of measuring capacity of foundation pile, example of construction field is compared and reviewed.

  • PDF

A Study on the Pre-fabrication of Three-story Column Re-bars for Saving Construction Time of High-rise Buildings (초고층 건물 공기단축을 위한 기둥철근 3개층 선조립공법에 관한 연구)

  • Kim, Gwang Hee;Kim, Jae Yeob;Seo, Deok Seok;An, Sung Hoon;Choi, Hee Bok;Jung, Beong Won
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.39-46
    • /
    • 2007
  • A high-rise building construction in Korea has some problems in engineering, construction and management technologies although the high-rise building construction is recently booming. In addition, the lack of skilled construction labors is increasing, so the development for methods is needed to reduce the labors by prefabrication and mechanization. A re-bar work is one of very important works with regard to cost and schedule management in the high-rise building construction. Nevertheless, the re-bar work has some problems that it is needed many re-bars for joints linking and much time for lifting due to high-rise buildings, and it is difficult to level the skill of labors. So, in this study, the pre-fabrication of three-story height in column re-bars is proposed and the results of an implementation are analyzed and explored by a case study. As the results of case study, the pre-fabrication of three-story heights in column re-bars could reduce the cost in the re-bar work and accelerate the time in the structural frame work. In addition, the pre-fabrication of three-story height in column re-bars could solve the problems such as the waste of many re-bars for joints linking, and the lack of the skilled labors.

Framework on Database Development based on Modular Simulation Model Implementation for Curtain Wall Operations in High-rise Buildings (초고층 커튼월공사 MSM 구성 및 데이터베이스 구축을 위한 프레임워크)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Tae-Hyung;Shin, Young-Keun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.301-302
    • /
    • 2012
  • Recently, high-rise building projects have been in the spotlight in South Korea. Curtain wall construction, as one of important operations in the high-rise building projects is composed of various, entangled and complex unit processes that require a systematic planning to prevent unexpected delays. A schedule simulation technique has been used for deriving more efficient planning and accurate performance measurement. However, the simulation technique has difficulty in collecting actual data and in applying data fluctuations during construction. Thus, this paper suggests a concept model of Modular Simulation Model(MSM) that overcomes such limitations of traditional simulation technique based on curtain wall operations.

  • PDF

Data Standardization of Construction Performance for Optimized Process Management in High-rise Curtain-wall Operations (초고층 커튼월 공정관리 최적화를 위한 건설성능 데이터 표준화)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.283-284
    • /
    • 2012
  • High-rise building construction has been increasing for the recent years and the construction process has become more complicated. This suggests a need for precise planning based on reliable data to prevent cost overruns and delays. However, the process planning is implemented based mainly on the experience of engineers that can result in critical damage in cost and time. Accurate productivity estimation and unit cost analysis must be considered important matter to prevent such disaster. This study estimates productivity and unit cost of curtain wall operations in high-rise building construction by simulation techniques and statistical methodologies. This study suggests a decision making methodology for the site personnel that enables to compare various combinations of productivity and unit cost based on reliable data that has been collected in actual construction sites. It is expected that this study contributes to the following research of developing an optimized construction performance assembling model for the site personnel.

  • PDF

An Investigative Study on the Structural Characteristics of High-Rise Complexes in Korea (국내 고층 주상복합 건물의 구조적 특성에 관한 조사 연구)

  • Kang Suk-Won;Lee Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.137-144
    • /
    • 2003
  • Recently, the interest in a complex building increases rapidly in Korea. High-rise complex is not simply the combination of a residential apartment and a business office as previous but a building with the object of the convenience of the residents familiar with city-life style through adapting the high class life style and new residential culture to the business space, and the efficiency in using the limited building site in the town. This study presents an exploratory analysis focusing the structural system with the help of the extensive survey of the construction site in Korea, and aims a guideline for the structural design and construction of high rise complex. Through the survey, change and development in the design and the construction can be seen as the height and size of the complex grow. It is almost indispensable to design a structural system against lateral forces like earthquake or wind, which is usually measured by story drift ratio or story displacement. Improvement of the structural materials and their usages is also included for the efficiency of the structural system. Useful slab-beam system contributing to the decrease of the story height is still a concern.