• 제목/요약/키워드: high-flux advanced neutron application reactor (HANARO)

검색결과 17건 처리시간 0.026초

Estimation of nuclear heating by delayed gamma rays from radioactive structural materials of HANARO

  • Noh, Tae-yang;Park, Byung-Gun;Kim, Myong-Seop
    • Nuclear Engineering and Technology
    • /
    • 제50권3호
    • /
    • pp.446-452
    • /
    • 2018
  • To improve the accuracy and safety of irradiation tests in High flux Advanced Neutron Application ReactOr (HANARO), the nuclear energy deposition rate, which is called nuclear heating, was estimated for an irradiation capsule with an iridium sample in the irradiation hole in order. The gamma rays emitted from the radioisotopes (RIs) of the structural materials such as flow tubes of fuel assemblies and heavy water reflector tank were considered as radiation source. Using the ORIGEN2.1 code, emission rates of delayed gamma rays were calculated in consideration of the activation procedure for 8 years and 2 months of HANARO operation. Calculated emission rates were used as a source term of delayed gamma rays in the MCNP6 code. By using the MCNP code, the nuclear heating rates of the irradiation capsules in the inner core, outer core, and heavy water reflector tank were estimated. Calculated nuclear heating in the inner core, outer core, and heavy water reflector tank were 200-260 mW, 80-100 mW, and 10 mW, respectively.

핵연료 노내조사시험설비의 시공 현황 (The Construction Status of Fuel Test Loop Facility)

  • 박국남;이정영;김학노;유현재;유성연
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2007년도 동계학술발표대회 논문집
    • /
    • pp.305-309
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. The Commissioning of the FTL is to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

Considerations of the Optimized Protective Action Distance to Meet the Korean Protective Action Guides Following Maximum Hypothesis Accidents of Major KAERI Nuclear Facilities

  • Goanyup Lee;Hyun Ki Kim
    • Journal of Radiation Protection and Research
    • /
    • 제48권1호
    • /
    • pp.52-57
    • /
    • 2023
  • Background: Korea Atomic Energy Research Institute (KAERI) operates several nuclear research facilities licensed by Nuclear Safety and Security Commission (NSSC). The emergency preparedness requirements, GSR Part 7, by International Atomic Energy Agency (IAEA) request protection strategy based on the hazard assessment that is not applied in Korea. Materials and Methods: In developing the protection strategy, it is important to consider an accident scenario and its consequence. KAERI has tried the hazard assessment based on a hypothesis accident scenario for the major nuclear facilities. During the assessment, the safety analysis report of the related facilities was reviewed, the simulation using MELCOR, MACCS2 code was implemented based on a considered accident scenario of each facility, and the international guidance was considered. Results and Discussion: The results of the optimized protective actions were 300 m evacuation and 800 m sheltering for the High-Flux Advanced Neutron Application Reactor (HANARO), the evacuation to radius 50 m, the sheltering 400 m for post-irradiation examination facility (PIEF), 100 m evacuation or sheltering for HANARO fuel fabrication plant (HFFP) facility. Conclusion: The results of the optimized protective actions and its distances for the KAERI facilities for the maximum postulated accidents were considered in establishing the emergency plan and procedures and implementing an emergency exercise for the KAERI facilities.

조사시험용 압력용기의 조립 및 시험 (The Assembly and Test of Pressure Vessel for Irradiation)

  • 박국남;이종민;윤영중;전형길;안성호;이기홍;김영기;케네디
    • 대한기계학회논문집A
    • /
    • 제33권2호
    • /
    • pp.179-184
    • /
    • 2009
  • The Fuel Test Loop(FTL) which is capable of an irradiation testing under a similar operating condition to those of PWR(Pressurized Water Reactor) and CANDU(CANadian Deuterium Uranium reactor) nuclear power plants has been developed and installed in HANARO, KAERI(Korea Atomic Energy Research Institute). It consists of In-Pile Section(IPS) and Out-of Pile System(OPS). The IPS, which is located inside the pool is divided into 3-parts; the in-pool pipes, the IVA(IPS Vessel Assembly) and the support structures. The test fuel is loaded inside a double wall, inner pressure vessel and outer pressure vessel, to keep the functionality of the reactor coolant pressure boundary. The IVA is manufactured by local company and the functional test and verification were done through pressure drop, vibration, hydraulic and leakage tests. The brazing technique for the instrument lines has been checked for its functionality and performance. An IVA has been manufactured by local technique and have finally tested under high temperature and high pressure. The IVA and piping did not experience leakage, as we have checked the piping, flanges, assembly parts. We have obtained good data during the three cycle test which includes a pressure test, pressure and temperature cycling, and constant temperature.

MECHANICAL AND IRRADIATION PROPERTIES OF ZIRCONIUM ALLOYS IRRADIATED IN HANARO

  • Kwon, Oh-Hyun;Eom, Kyong-Bo;Kim, Jae-Ik;Suh, Jung-Min;Jeon, Kyeong-Lak
    • Nuclear Engineering and Technology
    • /
    • 제43권1호
    • /
    • pp.19-24
    • /
    • 2011
  • These experimental studies are carried out to build a database for analyzing fuel performance in nuclear power plants. In particular, this study focuses on the mechanical and irradiation properties of three kinds of zirconium alloy (Alloy A, Alloy B and Alloy C) irradiated in the HANARO (High-flux Advanced Neutron Application Reactor), one of the leading multipurpose research reactors in the world. Yield strength and ultimate tensile strength were measured to determine the mechanical properties before and after irradiation, while irradiation growth was measured for the irradiation properties. The samples for irradiation testing are classified by texture. For the irradiation condition, all samples were wrapped into the capsule (07M-13N) and irradiated in the HANARO for about 100 days (E > 1.0 MeV, $1.1{\times}10^{21}\;n/cm^2$). These tests and results indicate that the mechanical properties of zirconium alloys are similar whether unirradiated or irradiated. Alloy B has shown the highest yield strength and tensile strength properties compared to other alloys in irradiated condition. Even though each of the zirconium alloys has a different alloying content, this content does not seem to affect the mechanical properties under an unirradiated condition and low fluence. And all the alloys have shown the tendency to increase in yield strength and ultimate tensile strength. Transverse specimens of each of the zirconium alloys have a slightly lower irradiation growth tendency than longitudinal specimens. However, for clear analysis of texture effects, further testing under higher irradiation conditions is needed.

핵연료 노내조사시험설비 설치공사 완료 (The Construction Work Completion of the Fuel Test Loop)

  • 박국남;이정영;지대영;박수기;심봉식;안성호;김학노;이종민
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2007년도 춘계학술대회A
    • /
    • pp.291-295
    • /
    • 2007
  • FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL consists of In-Pile Test Section (IPS) and Out-Pile System (OPS). FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. Task Force Team was organized to do a construction systematically and the communication between members of the task force team was done through the CoP(community of Practice) notice board provided by the Institute. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. Without a sweet of the workers of the participating company of HEC(Hyundae Engineering Co, Ltd), HDEC(HyunDai Engineering & Construction Co. Ltd), equipment manufacturer, and the task force team, it is not possible to install the FTL facility within the planned shutdown period. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

  • PDF

DISSOLUTION AND BURNUP DETERMINATION OF IRRADIATED U-Zr ALLOY NUCLEAR FUEL BY CHEMICAL METHODS

  • Kim, Jung-Suk;Jeon, Young-Shin;Park, Soon-Dal;Song, Byung-Chul;Han, Sun-Ho;Kim, Jong-Goo
    • Nuclear Engineering and Technology
    • /
    • 제38권3호
    • /
    • pp.301-310
    • /
    • 2006
  • Destructive methods were used for the burnup determination of U-Zr alloy nuclear fuel irradiated in the High-flux Advanced Neutron Application Reactor (HANARO) at KAERI. The dissolution rate of unirradiated U-Zr alloy fuel in $HNO_3$/HF mixtures was investigated for the experimental conditions of a different temperature, and initial concentrations of HF and $HNO_3$. The irradiated U-Zr alloy fuel specimen was dissolved in a mixed acid condition of 3 M HNO3 and 1 M HF at $90^{\circ}C$ for 8 hours under reflux. The total burnup was determined from measurement of the Nd isotope burnup monitors. The method includes U, Pu, $^{148}Nd,\;^P{145}Nd+^{146}Nd,\;^{144}Nd+^{143}Nd$ and total Nd isotopes determination by the isotope dilution mass spectrometric method (IDMS) using triple spikes $(^{233}U,\;^{242}Pu\;and\;^{150}Nd)$. The effective fission yield was calculated from the weighted fission yields averaged over the irradiation period. The results are compared with that obtained by the destructive -spectrometric measurement of the $^{137}Cs$ monitor.