• Title/Summary/Keyword: harbor construction

Search Result 239, Processing Time 0.024 seconds

Signal-Based Structural Health Monitoring Methods for Caisson-Type Breakwaters (케이슨식 방파제의 신호기반 구조건전성 모니터링 기법)

  • 이용환;김주영;박재형;김정태
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.10a
    • /
    • pp.451-458
    • /
    • 2004
  • The caisson-type breakwaters have been widely used in the area of harbor construction. Because of the importance of the breakwaters, structural health monitoring in the breakwaters by using appropriate methods is of great needs. In this study, a caisson-type breakwater that has fatigue cracks due to wave-impact is investigated. First, a signal-based structural health monitoring method is proposed for the breakwaters structures. Excitation and sensor systems are designed on finite element model and monitoring categories are also selected. Structural health monitoring was realized by using measured dynamic response signals and analyzed information.

  • PDF

The Design and Construction of the Anchorage of Yi Sun-Sin Grand Bridge (이순신대교 앵커리지 설계-시공사례)

  • An, Ik-Kyun;Kim, Kyung-Taek;Seo, Young-Hwa
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.14-25
    • /
    • 2010
  • The Yi Sun-Sin grand bridge is the suspension bridge which connects Myodo and Gwangyang. It is over the main navigation channel of Gwangyang Harbor. South anchorage(AN1, Myodo side) of the bridge is designed as rock anchored type. It sustains using the resistance of the underground rock's mass in Myodo. As this type of anchorage can minimize the exposure of the structure, It is economically efficient and environmentally friendly. North anchorage (AN2, Gwangyang side) is designed as the gravity type. This anchorage is 68 meters in diameter and use its own weight to support. Instead of normal rectangular diaphragm wall, the circular shape diaphragm wall is adopted to the north anchorage. It doesn't need to use internal temporary facilities, so it can significantly improve the constructability of the structure.

  • PDF

VIRTUAL REALITY SHIP SIMULATOR

  • Yim, Jeong-Bin
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.06a
    • /
    • pp.93-105
    • /
    • 2000
  • This paper describes prototype Virtual Reality Ship Simulator (VRSS) that we have recently developed next-generation training equipment based on the virtual reality (VR) technology. The inherent defects of conventional ship simulators are enormous costs and difficult system upgrade due to the system construction, such as large mock-up bridge system, wide visual presentations, In this paper, to cope with those problems, we explored VR technology that can give realistic environments in a virtual world. Then we constructed prototype VRSS system, which is, consists of PC-based human sensors, and Databases set having 3D object models and coefficients of Head Related Transfer Functions (HRTFs). 3D-WEBMASTER authoring tool was used as Virtual Reality Modeling Language (VRML). Using the VRSS system, we constructed Port an Passage Simulator for the harbor of INCHON in Korea, and Ship and Sea State Simulator for an arbitrary given sea environmental states by user. Through many simulation tests, we testified the efficiency of developed prototype VRSS by subject assessment with five participants. Then, we present results on the simulation experiments and conclude with discussion of evaluation results.

  • PDF

Development of Geotube Technology Using Dredging Ship (준설선을 활용한 지오튜브공법 개발)

  • 신은철;오영인;김종인
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.177-184
    • /
    • 2000
  • Geotube is a tube made of geotextile and hydraulically filled with dredged soil. This technological method has been widely used in the advanced countries of the world to build the shore protection embankment. The dredged contaminated sediments from the lake, river, and harbor can be pumped into the geotube by using the hydraulic pump. So, environments effects can be minimized and enhanced by using this method. This paper presents a field test result of a geotube in the land reclamation project for the Songdo New City construction site. The dredged silty clay was dredged by the dredging ship and hydraulically pumped into the geotube. The height of geotube was measured at every filling stage and also measured width and diameter of geotube with the elapsed time. The unit weight of soil and undrained shear strength of filled soil in a tube were measured at the various locations and heights of geotube with the elapsed time. Geotube technique can be effectively implemented for the silty clayey soil with using the dredging ship.

  • PDF

Redescription of Chironomus salinarius (Diptera: Chironomidae), nuisance midges that emerged in brackish water of Jinhae-man (Bay), Kyongsangnam-do, Korea

  • REE Han-Il;YUM Jin-Hwoa
    • Parasites, Hosts and Diseases
    • /
    • v.44 no.1 s.137
    • /
    • pp.63-66
    • /
    • 2006
  • Huge numbers of non-biting midges emerged from brackish water which were made at the harbor construction field in Jinhae City, Kyongsangnam-do, Korea in late summer in 2005, and caused a serious nuisance to villagers. The midges were collected and identified as Chironomus salinarius (Kieffer, 1921). Although this species was recorded in Korea for the first time in 1998, the morphological descriptions were so brief and simple. A full redescription is made with detailed illustrations for ecological and control workers of this nuisance midge.

Tranquility Reformation of Nearby Fishing Port due to Construction of a New Harbor (항만건설에 따른 인근어항 정온도 개선방안)

  • Seo, Kyu-Hak;Ha, Tae-Min;Cho, Yong-Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2010.02a
    • /
    • pp.110-110
    • /
    • 2010
  • 본 연구에서는 대규모 항만시설물을 계획함에 따라 발생될 수 있는 인근 소규모 어항의 안정성에 대하여 일예를 들어 검토하였다. 제주해군기지 건설로 인해 인근어항(강정항)의 기축조분 84m를 제외한 잔량분 126m에 대한 평면수정이 불가피할 것으로 판단됨에 따라 수치모형실험(SWAN)을 통해 강정항의 현 상태 및 기지건설 후의 항내파고 분포에 대하여 검토하였다. 또한 남방파제 잔량분이 미 시행됨에 따라 발생할 수 있는 항내정온도를 확보하기 위하여 대안을 연구한 결과 제주해군기지 서방파제 시점부에 파제제 50.0m를 설치함으로써 보다 효율적이고 경제적으로 인근어항(강정항)의 항내정온도를 크게 개선시킬 수 있을 것으로 판단된다.

  • PDF

The Design and Implementation of Multi RFID Middle System for U-Logistics environment construction (U-Logistics환경 구축을 위한 다중 RFID 미들웨어 시스템의 설계 및 구현)

  • Han, Soo;Park, Sang-Hyun;Shin, Seung-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.703-704
    • /
    • 2006
  • RFID/USN means a way of attaching RFID to all required objects to identify them and exchanging the required information through the network. High frequency (13.56MHz) has been commonly used in the field of processing management in Korea, and extremely short wave (433.92MHz) has been used for harbor logistics management by being attached to containers in the US. As for SCM field where we need to have a broader understanding, the research on $860{\sim}960MHz$, a sort of extremely short wave has been most actively conducted. Therefore, in-this study, in order to understand the features of all frequencies ranging and to design and implementation of RFID Middle System suitable for realizing u-Logistics by using those diverse frequencies.

  • PDF

Application of the Lateral Subgrade Reaction Modulus in Landing Pier (잔교식 안벽 해석시 수평지반반력계수의 적용)

  • Park, See-Boum;Kim, Ji-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1707-1711
    • /
    • 2008
  • Landing pier is connect from onshore to offshore with bridge type that a coast structure. The sub-structure is consisted of vertical or batter pile and combined reinforced concrete slab. These days useful design method of quay wall of landing pier type for pile foundation analysis abide by approximate depth of pile supported method, "Harbor and port design criterion, 2005 The ministry of land transport and maritime affairs". The approximate depth of pile supported is calculated two kind of method that one is assume to below depth of 1/$\beta$ from assumed submarine surface and other is 1st fixpoint depth by Chang(1937)'s theory. By this paper, FEM dynamic analysis of 3-dimensions was achieved that it has compared pile fixed end modeling with elastic spring modeling base on winkler theory.

  • PDF

Development of the Method for Liquefaction Hazard Microzonation in Korean Coastal Areas (국내 연안지역의 액상화 재해도 작성기법 개발)

  • 곽창원;최재순;강규진;김수일
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.431-438
    • /
    • 2002
  • Reclaimed coastal areas for the construction of ports and harbors are in general subjected to strong possibility of liquefaction. In this research, a new method for liquefaction hazard microzonation based on liquefaction settlements was developed. Severity of liquefaction hazard was defined by liquefaction settlements obtained from the method proposed by Tokimatsu and Seed. 10 coastal areas, representing typical geological and geotechnical characteristics of Korean ports and harbors, and 3 real earthquake records for site response analysis were selected. From this research, liquefaction settlement criteria is adapted as a new quantitative index for the liquefaction hazard microzonation. Liquefaction settlements were also compared with LPI (Liquefaction Potential Index), obtained from the assessment of liquefaction potential based on the modified Seed and Idriss's method. As an example, 2 and 3 dimensional liquefaction hazard microzonations of Pusan port and harbor area were mapped by overlapped liquefaction settlement contours.

  • PDF

Mechanism of Sedimentation in Bangkok Bar Channel and Estimation of Sedimentation Volume in the Channel

  • Ichiro Deguchi;Toru Aswaragi;Masanobu Ono;Sucharit Koontanakulvong
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 1993.07a
    • /
    • pp.122-123
    • /
    • 1993
  • Bangkok Bar Channel is a unique approach channel to Bangkok(on Toi)Harbor that is the representative river port constructed along the river mouth of Chao Praya River. Various facilities are scattered along the both sides of the river between the river mouth and the bridge located about 50km upward. The construction of the channel began in 1951 and was completed in 1954. (omitted)

  • PDF