• Title/Summary/Keyword: guideline for risk management

Search Result 172, Processing Time 0.024 seconds

A Model of Operational Situation Analysis with Functional Safety for ASIL Determination (ASIL 결정을 위한 기능안전 운전상황 분석 모형)

  • Baek, Myoung-Sig;Jang, Hyeon Ae;Kwon, Hyuck Moo
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.160-167
    • /
    • 2014
  • To determine a proper ASIL for each hazardous event with a proper safety goal, the right classes should first be determined for the three properties of the hazardous event; (i) severity of harm from the resultant accident, (ii) exposure to the relevant operational situation, and (iii) controllability to avoid the induced risks. ASIL can be clearly determined with right classes of these three properties. But no specific methodologies or processes for their classification can be found in ISO 26262, except only a rough guideline with a simplified set of illustrative tables. In this paper, we try to present a systematic model for classifying the three properties of the hazardous event and suggest a refined procedure of ASIL determination. The proposed model provides a specific method to get a more objective ASIL compared with that in the standard. Scrutinizing the current methodology, we develop a refined method and also provide an illustrative example.

Build up management mind of the construction expert engineer (건설전문기술자의 경영마인드 정립에 관한 연구)

  • Chun, Jin-Ku;Kim, Byeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.45-55
    • /
    • 2006
  • This study aims need set of mind to construction manager built a theory logic conceive decision making system and principles designed to create the administrative procedures that a company needs to integrate management and environmental concerns into its daily business practices. Integrate considerations of risk reduction and wise resource management into daily business decision making environmental that includes performance and cost. Seek to make better Dynamic time solutions that promote competitiveness set of management mind provide business with tools and methodologies management participation, psychology, philosophy effects of resource flows. A last of understand use of the decision making element principal as a guideline for evaluating and ranking approaches. The result of this study are summarized as follows; (1) setting for approach decision making of manager police, (2) dynamic of time and management mind (3) a primary factor out environment to decision making (4) methodologies of set up system for management mind (5) expectation effect of management mind.

Activation Strategies of the Disaster Public-Apps in Korea (국내 재난관련 공공 앱의 활성화 방안 연구)

  • Shin, Dong-Hee;Kim, Yong-Moon
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.11
    • /
    • pp.644-656
    • /
    • 2014
  • In recent years, a series of large-scale disastrous accidents have been occurred frequently both in public and private sector. Such disasters become catastrophe due to poor early response and delayed prompt rescue. Damage from catastrophe could have been drastically reduced or minimized with effective response and recovery management. The smart phone-based mobile applications have important potentials in providing solutions for the effective response and recovery management. Mobile applications can greatly improve risk communication in case of disasters by integrating process of exchange information and data on risk among risk evaluators, risk managers, and other interested parties. In this light of potentials, this study investigates the measures and management to better manage early responses and to effectively deal with domestic disaster-related of the status of public applications service, and utilization. This study examines how disaster applications can be better used and how effective information dissemination through applications could help the post-disaster management process. Based on this findings, it proposes a guideline of effective disaster-related applications by public sector for the future development of actual services and activation solutions. The results show that "User Promptness Side" and "Content Believability Side" factors found to be the two most significant factors in the disaster-related applications by public sector. Discussion and implications are discussed.

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

Systematic Improvement of Safety Management-Related Laws in Domestic Demolition Works (국내 해체공사 안전관리 관련 법령의 체계적인 개선방안)

  • Ha, Gee-Joo;Ha, Jae-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.5
    • /
    • pp.169-178
    • /
    • 2010
  • Generally speaking, the demolition works is the subsequent construction activity which has been done after building life-span of twenty two years or so. However, it was not prepared suitable systems and laws and regulations as long-term solutions. In this study, it was suggested the improvement guideline of safety management-related laws in domestic demolition works. The three improvement of laws was suggested as follows. ${\bullet}$ First, it was suggested proposals for demolition works standards in safety management plan of management law for construction activity. ${\bullet}$ Secondly, it was provided improvements for standard safety work guide of demolition works of industrial safety and health law. ${\bullet}$ Third, it was proposed integration method of redundancy in safety management plan and risk assessment regulations.

GIS-based strategic approach for the estimation of soil erosion (토사유실평가를 위한 GIS기반의 전략적 접근 방법)

  • Lee, Geun-Sang;Koh, Deuk-Koo;Je, Seong-Jin
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.11a
    • /
    • pp.413-416
    • /
    • 2006
  • This paper presents a strategic approach to effective soil conservation planning and management. To do this, the soil loss model, Revised Universal Soil Loss Equation (RUSLE) was used to quantify soil erosion in two basins (Andong and Imha basin), which are distinct in terms of sedimentation in the reservoir of each basin. Areas with high soil erosion potential were analyzed on the basis of land surface characteristics handled by geographic information system (GIS), especially dividing the basin into several sub-basins and then examination was emphasized near the river channel (water-pollutant buffering zone), along which human activities are large. Modeling results show the approach suggested herein provides a basis and guideline for choosing prior erosion risk areas to be examined for soil conservation planning and management. Also, this approach is relatively simple and has wide practical applicability.

  • PDF

Does Process Quality of Inpatient Care Serve as a Guide to Reduce Potentially Preventable Readmission (PPR)? (의료서비스의 과정적 질과 잠재적으로 예방 가능한 재입원율과의 관계)

  • Choi, Jae-Young
    • Korea Journal of Hospital Management
    • /
    • v.23 no.1
    • /
    • pp.87-106
    • /
    • 2018
  • Objective: The objective of this study is to examine the association between process quality of inpatient care and risk-adjusted, thirty-day potentially preventable hospital readmission (PPR) rates. Data Sources/Study Setting: This was an observational cross-sectional study of nonfederal acute-care hospitals located in two states California and Florida, discharging Medicare patients with a principal discharge diagnosis of heart failure, acute myocardial infarction, or pneumonia January through December 31, 2007. Data were obtained from the Healthcare Cost and Utilization Project State Inpatient Database of the Agency for Healthcare Research and Quality, Centers for Medicare and Medicaid Services Hospital Compare database, and the American Hospital Association Annual Survey of Hospitals. Study Design: The dependent variable of this study is condition-specific, risk-adjusted, thirty-day potentially preventable hospital readmission (PPR). 3M's PPR software was utilized to determine whether a readmission was potentially preventable. The independent variable of this study is hospital performance for process quality of inpatient care, measured by hospital adherence to recommended processes of care. We used multivariate hierarchical logistic models, clustered by hospitals, to examine the relationship between condition-specific, risk-adjusted, thirty-day PPR rates and process quality of inpatient care, after taking clinical and socio-demographic characteristics of patients and structural and operational characteristics of hospitals into account. Findings: Better performance on the process quality metrics was associated with better patient outcome (i.e., low thirty-day PPR rates) in pneumonia, but not generally in two cardiovascular conditions (i.e., heart failure and acute myocardial infarction). Practical Implication: Adherence to the process quality metrics currently in use by CMS is associated with risk-adjusted, thirty-day PPR rates for patients with pneumonia, but not with cardiovascular conditions. More evidence-based process quality metrics closely linked to 30-day PPR rates, particularly for cardiovascular conditions, need to be developed to serve as a guideline to reduce potentially preventable readmissions.

What are the Appropriate Surgery and Postoperative Surveillance for Intraductal Papillary Mucinous Neoplasm?

  • Ideno, Noboru;Nakata, Kohei;Nakamura, Masafumi
    • Journal of Digestive Cancer Research
    • /
    • v.9 no.1
    • /
    • pp.8-18
    • /
    • 2021
  • Although many guidelines for pancreatic cystic neoplasms focus on the management of intraductal papillary mucinous neoplasm of the pancreas (IPMN) at the highest oncological risk, there are many issues that surgeons need to consider at the time to plan the surgical procedures based on characteristics of IPMN subtypes, such as multiplicity of branch duct-IPMN (BD-IPMN) and intraductal spreading of main duct-IPMN (MD-IPMN). For multifocal BD-IPMN, partial pancreatectomy would be selected to remove BD-IPMN with predictors of malignancy, while the other lesions without risk factors can be left, although total pancreatectomy might be considered if the patients have a strong family history of pancreatic cancer. Partial pancreatectomy would be also adequate procedure for MD-IPMN if negative surgical margin for high-grade dysplasia or invasive carcinoma were achieved. It has become to be well-known that patients with BD-IPMN are at increased risk for developing not only IPMN-associated pancreatic ductal adenocarcinoma (PDAC) but also PDAC independent from the IPMN. Hence, the detection of a concomitant PDAC is also an important focus for strategies after resection of BD-IPMNs. Our recent analysis of patients after partial pancreatectomy for MD-IPMN with negative surgical margin identified an unexpected recurrence pattern, which we called "monoclonal skip" recurrence. MD-IPMN seems to be disseminated in the pancreatic ductal systems and MD-IPMN with identical genetic background was detected in the remnant pancreas even in a long time after index surgery. We proposed strategies of postoperative surveillance based on characteristics and natural history of each morphological subtype.

Safety Management Network of Sports Facilities Abroad and System Status (해외의 스포츠시설 안전관리 네트워크 및 시스템 현황)

  • Kim, Il-Gwang;Kwon, Hei-Won;Choi, Jin-Ho
    • Journal of Digital Convergence
    • /
    • v.14 no.6
    • /
    • pp.547-562
    • /
    • 2016
  • The purpose of this research was to provide the information of mandatory regulation for Korean sports facilities and the preliminary data for building sport safety management manual through sports facilities abroad and system status. Futhermore, based on the information of sports facilities safety management, this research performed the benchmarking of each country sports facilities safety management system. As a result, in the U.S, Department of Homeland Security(DHS) leads effort to achieve a safe, secure, and resilient homeland. In Germany, law & regulations, sports facilities safety guideline and expert extension have been reviewed. Germany is more realistic and practical than other countries. In Australia, Major Hazard Facilities(MHF) is responsible for eliminating the risk of a major incident. Emergency Management System(EMS) should spontaneously respond when the alarm is raised as early detection and intervention are vital to ensuring that a small incident does not escalate to become a major disaster.

A Study on Problems and Improvement in Operation of the BTL Projects. (임대형 민자 사업(BTL)에서 운영부문의 문제점 분석과 해결 방안 연구)

  • Noh, Jung-Ho;Lee, Jae-Young;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.686-691
    • /
    • 2006
  • Beginning January 2005, the BTL (Build-Transfer-Lease) project was initiated by government to provide high level of public services for the upgraded quality of life. The most important process of the BTL project is operation, because the company have to operate the building about $20{\sim}30$ years after completion. But a lot of problems have been founded so far. For example, no counterplan for the risk in operation, no total control system and the vagueness in project guideline and so on. These problems will cause serious demage to the BTL project. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the improvement and deliver the successful operation in BTL project.

  • PDF