The purpose of this study is to reduce the probability of occurrence of electric fires as a preemptive preventive measure, and to strengthen the capability of preventing electric fires by strengthening the cooperative function between electric fire-related departments and establishing a cooperative system. In this study, the general aspects of electric fires were identified by reviewing the literature such as ignition mechanisms of electric fires. And the major electrical fires that occurred in the last 10 years were classified into ignition factors (short circuit, overload/overcurrent, and earth leakage/ground fault) and ignition sources (wiring/wiring appliances, electrical equipment/household appliances). And the 4M technique was used to analyze the potential causes of ignition at the fire site and to suggest preventive measures. In the case In this study, out of 48 electrical fires in the past 10 years, 16 short-circuit fires, 3 overload/overcurrent fires, 3 short-circuit and earth fault fires, 16 fires in wiring/wiring appliances, and 10 fires in electrical equipment/home appliances classified as cases. And prevention measures were presented in terms of human, machine, media, and management by using the 4M technique. For the preemptive prevention of electric fires, strengthening the compulsory electrical safety inspection and making it mandatory to report when new or expanding electric facilities, charging a fee for electric safety inspection for detached houses and granting benefits subject to inspection completion, improvement of the electric safety voluntary inspection table and safety indications; It was suggested as a policy to organize and operate electrical safety inspection personnel in a two-person team (mixed), establish a close work cooperation system with related organizations, and strengthen electrical safety education and publicity.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.22
no.5
/
pp.111-116
/
2022
The causes of motor burnout include overload, phase loss, restraint, interlayer short circuit, winding ground fault, instantaneous overvoltage, and the rotor contacting the stator, leading to insulation breakdown, leading to breakdown or electrical accidents. Therefore, equipment failure causes not only loss due to cost required for equipment maintenance/repair, but also huge economic loss due to productivity decrease due to process stop because the process itself including the motor is stopped. The current level of technology for diagnosing motor failures uses vibration, heat, and power analysis methods, but there is a limit to analyzing the problems only after a considerable amount of time has passed according to the failure. Therefore, in this paper, a device and algorithm for measuring insulation resistance using DC AMP signal was applied to an industrial motor to solve this problem. And by following the insulation resistance state value, we propose a diagnosis of deterioration and failure of the motor that cannot be solved by the existing method.
Rojas-Mercedes, Norberto;Erazo, Kalil;Di Sarno, Luigi
Earthquakes and Structures
/
v.22
no.5
/
pp.503-515
/
2022
This paper presents the development of seismic fragility curves for a precast reinforced concrete bridge instrumented with a structural health monitoring (SHM) system. The bridge is located near an active seismic fault in the Dominican Republic (DR) and provides the only access to several local communities in the aftermath of a potential damaging earthquake; moreover, the sample bridge was designed with outdated building codes and uses structural detailing not adequate for structures in seismic regions. The bridge was instrumented with an SHM system to extract information about its state of structural integrity and estimate its seismic performance. The data obtained from the SHM system is integrated with structural models to develop a set of fragility curves to be used as a quantitative measure of the expected damage; the fragility curves provide an estimate of the probability that the structure will exceed different damage limit states as a function of an earthquake intensity measure. To obtain the fragility curves a digital twin of the bridge is developed combining a computational finite element model and the information extracted from the SHM system. The digital twin is used as a response prediction tool that minimizes modeling uncertainty, significantly improving the predicting capability of the model and the accuracy of the fragility curves. The digital twin was used to perform a nonlinear incremental dynamic analysis (IDA) with selected ground motions that are consistent with the seismic fault and site characteristics. The fragility curves show that for the maximum expected acceleration (with a 2% probability of exceedance in 50 years) the structure has a 62% probability of undergoing extensive damage. This is the first study presenting fragility curves for civil infrastructure in the DR and the proposed methodology can be extended to other structures to support disaster mitigation and post-disaster decision-making strategies.
The purpose of this study is to develop an earth leakage alarm circuit breaker, equipped with a leakage alarming function (JER-E2S, ETECKOREA Co., Korea), and to analyze its characteristics. The developed mechanism is exclusively used for single-phase and 220 V circuits, with a rated current of 32 A, 20 A, 20 A (for restrooms), 16 A, etc. It satisfies all characteristics of existing earth leakage circuit breakers (ELB). If a fire current, which is a resistive leakage current (Igr), flows through an electric line, the device detects the leakage current in real time and warns against the leakage through a blinking LED lamp. Since the developed device displays a tolerance to a capacitative leakage current (Igc) that inevitably occurs in LED lamps, communication devices, etc., it ensures a stable power supply. In addition, the earth leakage alarm circuit breaker protects against power failure due to a momentary ground fault. Therefore, it can supply power without the risk of the circuit breaker malfunctioning due to a momentary ground fault caused by water droplets, leaves, etc. Moreover, with a standby power of less than 0.1 W, the developed earth leakage alarm circuit breaker exhibits a power saving performance that is 3~8 times greater than that of other ELBs. Installation of approximately 10 earth leakage alarm circuit breakers in one apartment household, with an area of 120 ㎡, can save 2~5 kWh per month. Therefore, the developed earth leakage alarm breaker not only satisfies the characteristics of existing earth leakage breakers, but also exhibits outstanding power supply quality since it has the functions of electric fire prevention and malfunction prevention. Therefore, this device can innovatively contribute to electric fire prevention.
This paper presents the final configuration of test field and test items for the application of IEC 60364-4-44 in Korea. IEC 60364-4-44 provides rules for the protection against the effects of conducted and radiated disturbances on electrical installations. Especially this standard deals with the protection of low voltage facility against the ground fault in the high voltage side of power distribution system. Many countries define the regulations on the use of electrical facilities based on their own power system and technical references which are considered to be suitable for them. The background of circuit of IEC 60364-4-44 is based on the ungrounded system as most of European countries. However, domestic electric power distribution system is based on multi-grounding system different from European system. Therefore, it is necessary to evaluate or prove the effect of the IEC 60364-4-44 for introducing and applying it to the domestic grounding system as a national standard. The authors with KEA(Korea Electric Association) carried out a project on the application of IEC 60364-4-44 to Korean electrical installations of buildings sponsored by Korean ministry of commerce, industry and energy for three years(2004.4.1$\sim$2007.3.31). The test field is established in K.E.R.I.(Korea Electrotechnology Research Institute), which is the purpose of evaluating the formula to calculate touch voltage and stress voltage in the IEC standards. This paper presents some considerations and final configuration of test field to evaluate and introduce the IEC 60364-4-44 applicable to domestic rule for the protection against ground fault.
In recent yeaes, the collapses of man made structures have been encountered from time to time due to the deformation of the ground in korea. Furthermore, the possibilities of casasters from the ground deformation suCh as landslide and active fault are atrracting our attention to the deformation monitoring. In this study, two-coordinate tilt which was monitored during six months in order to develop tediniques for prevention of disasters from the ground deformation. The two-coordinate tilt which was detected by a tilt-sensor installed in shallow depth on the slope with the sensitivity of 0.0001 arc.sec in every 10 minutes was recorded continously to PC through the interface with 200-m line coonection. The observed digital tilt data. together with the relevant meteorological data were analyzed in reference to engineering application. During the whole observation period of six months, the net tilt is 10.06 arc.sec to the west and 73.88 arc.sec to the south. Consequently the ground has a tilt of 74.56 arc.sec to the direction of $S7.75^{\circ}W$ with average tilting of 0.02 arc.sec/hour. In spite of such fast and large tilting, it is interpreted in view of engineering aspects that the site is much safe from danger, since both East-West and North-South components of tilt converge as time goes by. Two categories of deformational events are recognized ; one is toward the direction of surface slope and the other is to the direction of increased pore pressure. Tiks are acenain to have a close relation with precipitation of rain. The daily variation of two-coordinate tilt is delayed 4.3 hours in average after the variation of atmospheric temperature. A certain correlation between atmospheric pressure and deformation might be revealed.
The fire event occurred in fire proof zone often causes serious electrical problems such as shorts, ground faults, or open circuits in nuclear power plants. These would be directed to the loss of safe shutdown capabilities performed by safety related systems and equipments. The fire event can treat the basic design principle that safety systems should keep their functions with redundancy and independency. In case of a cable fire, operators can not perform their mission properly and can misjudge the situation because of spurious operation, wrong indication or instrument. These would deteriorate the plant capabilities of safety shutdown and make disastrous conditions. In this paper, investigation and cause analysis of cable fire in Nuclear Power Plant, we described the cable fire temperature and functional failure criteria and the cable functional failure temperature evaluation by exposed fire is studied.
Sonmezer, Yetis Bulent;Bas, Selcuk;Isik, Nihat Sinan;Akbas, Sami Oguzhan
Geomechanics and Engineering
/
v.16
no.4
/
pp.435-448
/
2018
In order to make reliable earthquake-resistant design of civil engineering structures, one of the most important considerations in a region with high seismicity is to pay attention to the local soil condition of regions. It is aimed in the current study at specifying dynamic soil characteristics of Kirikkale city center conducting the 1-D equivalent linear and non-linear site response analyses. Due to high vulnerability and seismicity of the city center of Kirikkale surrounded by active many faults, such as the North Anatolian Fault (NAF), the city of Kirikkale is classified as highly earthquake-prone city. The first effort to determine critical site response parameter is to perform the seismic hazard analyses of the region through the earthquake record catalogues. The moment magnitude of the city center is obtained as $M_w=7.0$ according to the recorded probability of exceedance of 10% in the last 50 years. Using the data from site tests, the 1-D equivalent linear (EL) and nonlinear site response analyses (NL) are performed with respect to the shear modulus reduction and damping ratio models proposed in literature. The important engineering parameters of the amplification ratio, predominant site period, peak ground acceleration (PGA) and spectral acceleration values are predicted. Except for the periods between the period of T=0.2-1.0 s, the results from the NL are obtained to be similar to the EL results. Lower spectral acceleration values are estimated in the locations of the city where the higher amplification ratio is attained or vice-versa. Construction of high-rise buildings with modal periods higher than T=1.0 s are obtained to be suitable for the city of Kirikkale. The buildings at the city center are recommended to be assessed with street survey rapid structural evaluation methods so as to mitigate seismic damages. The obtained contour maps in this study are estimated to be effective for visually characterizing the city in terms of the considered parameters.
We investigated the distribution and geomorphic development of alluvial fan in Gyeongju City including Cheonbuk area. According to a relative height to a river bed, alluvial fans of this area are divided into Higher surface, Middle surface, and Lower surface. As alluvial fans of Bulguk temple∼Ulsan bay area, the confluent fans in Cheonbuk and Gyeongju areas were formed by the Quaternary climatic change alternating glacial and interglacial stages, and the development of N-S and NW-SE fault lines. The Gyeongju alluvial fan, the largest in Korea, has been provided as the significant space for human activity since the prehistoric age. Bukcheon river formed the Gyeongju alluvial fan had not flowed over during the prehistoric and the ancient times. In contrast with general geomorphic characteristics, many springs in the Gyeongju alluvial fan are located in the middle part of the fan because ground water reaches to the surface. It is supposed that sedimental materials were not sufficiently piled up at lower reach of Bukcheon river due to the large deposits at upper and middle reach of the basin.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.1
/
pp.98-104
/
2010
In order to evaluate the performance of a grounding system against lightning or fault currents including high frequency components, the grounding impedance should be considered rather than the steady state ground resistance. To evaluate the ground impedance, the frequency dependence of resistivity and relative dielectric constant of the soil have to be analyzed. This paper deals with the frequency dependence of the resistivity and relative dielectric constant of three types of soil on water content. As a result, the resistivity of soil is getting lower with increasing of water content. It is nearly independent of the frequency in the range less than 1[MHz], and is decreased over the frequency range above 1[MHz]. On the other hand, the relative dielectric constant is rapidly decreased with the frequency in the range less than 1[MHz], but it is nearly independent on the frequency over the range of 1[MHz]. It was found from the experiments that the frequency-dependant resistivity and relative dielectric constant of soil should be considered when designing the grounding systems for protection from lightning or switching surges.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.