• Title/Summary/Keyword: geotechnical design

Search Result 1,808, Processing Time 0.025 seconds

Suggested Method for the Tunnel Instrumentation on the Lattice Girder from the Results of the Laboratory Test using Load Cells (로드셀 실내시험을 통한 터널 격자지보 계측 기법)

  • Kim, Hak-Joon;Park, Si-Hyun;Lee, Ki-Se
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.269-275
    • /
    • 2009
  • The use of lattice girder is increased at the tunnel site in Korea recently for the substitute of H-steel rib. However, field measurements at the lattice girder are rarely performed at the tunnel site and the method of the measurement is not well established. The use of the vibrating wire strain gauges used for the H-steel rib was proven to be not suitable for the strain measurements of the lattice girder according to the previous research. The credibility of the load cell was investigated using laboratory compression tests for load cells, specially manufactured for the lattice girder far this study, installed at the specimen of the lattice girder. The method of the tunnel instrumentation for the lattice girder using the load cell is given from the interpretation of the compression test results.

Evaluation of Dynamic Rock Stiffness Using In-hole Seismic Technique (인홀 탄성파 시험을 이용한 암반의 동적 강성 평가)

  • Sun Chang-Guk;Kang Byung-Soo;Kim Young-Su;Mok Young-Jin
    • The Journal of Engineering Geology
    • /
    • v.15 no.3
    • /
    • pp.309-323
    • /
    • 2005
  • Dynamic stiffness of subsurface materials is one of the most important geotechnical parameters in predicting deformational behavior of structures as well as practicing seismic design and performance evaluation. In an effort to measure the parameter efficiently and accurately, various borehole seismic testing techniques have been, thus, developed and used during past several decades. Moreover, recent rush of underground-space projects and increasing size of structures put more stress on reliable site investigation techniques in estimating stiffness of rock mass. In this paper, a new technique called 'in-hole seismic test' has been implemented to measure the dynamic stiffness of rock masses at subsurface foundations and tunnel-faces. The reliance of in-hole seismic test was evaluated by comparing the testing results at several rock sites with those of other borehole techniques and the technique tunnls out to be an efficient and accurate in-situ testing technique.

Correlation Analysis between DCPT Value and SPT Value (동적콘관입시험값과 표준관입시험값의 상관성 분석)

  • Lee, Bongjik;Lee, Jongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.8
    • /
    • pp.23-30
    • /
    • 2014
  • In-situ penetration tests have been widely used in geotechnical engineering for site investigation in support of analysis and design. Standard Penetration Test (SPT) and Dynamic Cone Penetration Test (DCPT) are typical dynamic sounding. DCPT was originally developed as an alternative for evaluating the properties of subgrade soils. The main advantages of DCPT are that it is fast, inexpensive, and it is particularly useful in delineating areas of weak soils overlying stronger strata and in quickly assessing the variability of the soil conditions. But lack of standardization is main reason that this test method has not been advanced more in recent years. In this study, it is clarified the correlation with the SPT blow count, N from DCPT data using big DCP eqipment. Regression analysis and correlationship analysis were conducted with the data from relationship between SPT and DCPT. The analysis results showed that the convert fact are in the range of 1.12~1.31 with variation with soil property.

Bearing Capacity of Driven H-Piles in Embankment (성토지반에 타입된 H형강 말뚝의 지지거동)

  • 박영호;정경자;김성환;유성근;이재혁;박종면
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.173-182
    • /
    • 2000
  • To find axial and lateral responses of impact-driven H piles in embankment(SM), the H piles are instrumented with electric strain gages, dynamic load test is performed during driving, and then the damage of strain gages is checked simultaneously. Axially and laterally static load tests are performed on the same piles after one to nine days as well. Then load-settlement behavior is measured. Furthermore, to find the set-up effect in H pile, No. 4, 16, 26, and R6 piles are restriked about 1, 2, and 14 days after driving. As results, ram height and pile capacity obtained from impact driving control method become 80cm and 210.3∼242.3ton, respectively. At 15 days after driving, allowable bearing capacity by CAPWAP analysis, which 2.5 of the factor of safety is applied for ultimate bearing capacity, increases 10.8%. Ultimate bearing capacity obtained from axially static load test is 306∼338ton. This capacity is 68.5∼75.7% at yield force of pile material and is 4∼4.5 times of design load. Allowable bearing capacity using 2 of the factor of safety is 153∼169ton. Initial stiffness response of the pile is 27.5ton/mm. As the lateral load increases, the horizontal load-settlement behaves linearly to which the lateral load reaches up to 17ton. This reason is filled with sand in the cavity formed between flange and web during pile driving. As the result of reading with electric strain gages, flange material of pile is yielded at 19ton in horizontal load. Thus allowable load of this pile material is 9.5ton when the factor of safety is 2.0. Allowable lateral displacement of this pile corresponding to this load is 23∼36mm in embankment.

  • PDF

Characterization of Shear Waves in Busan New Port Clay: Estimation of the Coefficients of Shear Wave Velocity (부산 신항 점토의 전단파 특성 연구: 전단파 속도 계수 추정 사례)

  • Lee, Jong-Sub;Kim, Youngseok;Hong, Seungseo;Yoon, Hyung-Koo
    • The Journal of Engineering Geology
    • /
    • v.23 no.4
    • /
    • pp.503-510
    • /
    • 2013
  • Shear wave velocity is widely used as an parameter for investigating subsurface characteristics and for obtaining the design parameters based on theoretical equations. This study seeks to estimate the coefficient of shear wave velocity in Busan clay via laboratory tests. Eight specimens were extracted at depths of 10, 12, 15, 20, 22, 25, 30, and 31 m. The specimens were subjected to the consolidation test to determine the relationship between effective stress and shear wave velocity. The relationship shows a non-linear trend and is similar to the results of a previous study. The coefficient shows constant coverage and a relationship between ${\alpha}$ and ${\beta}$ is suggested. The results demonstrate that this coefficient could be used as a reference value to determine engineering parameters based on the shear wave velocity.

Installation of Suction Caisson Foundation for Offshore Wind Turbine : Model Test (해상풍력타워 석션기초의 설치시 거동에 대한 모형 시험 연구)

  • Kim, Dong-Joon;Kim, Su-Rin;Choo, Yun-Wook;Kim, Dong-Soo;Lee, Man-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.825-839
    • /
    • 2010
  • The global and domestic market for offshore wind farm is expected to grow fast, and the design and installation of substructure and foundation is getting more important. As for the offshore wind farms located in the shallow(depth < 20m) water, the construction and installation of the substructure and foundation makes up about 1/4 ~1/3 of the offshore wind farm construction cost, and the portion is expected to increase because the turbine capacity is increasing from 2 ~ 3MW to 5MW or larger and the water depth of wind farms is also increasing over 30m. As a foundation for offshore wind turbine, the suction caisson foundation is being considered to be a highly competitive alternative to the conventional monopile or gravity based structure, because it has features suitable for the offshore construction such as quick installation, no heavy equipment for penetration and no hammering noise for driving. In order to study the installation behaviour of the suction caisson, laboratory tests were performed with sand. The pore water pressure and displacement were measured to analyze the suction pressure during penetration, the penetration speed and the amount of heaving.

  • PDF

Analysis of the lateral displacement to the Large Diameter Bored Pile based on the application of the Lateral coefficient of subgrade reaction (수평지반반력계수에 따른 대구경 현장타설말뚝의 수평변위 분석)

  • Chae, Young-Su;Kim, Nam-Ho;Bang, Ei-Souk;Lee, Kyoung-Jea
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.528-535
    • /
    • 2005
  • Using the case of design to the Large diameter Bored Pile, We showed the various method to estimate the Lateral coefficient of subgrade reaction and analyzed the lateral displacement behavior according to the characteristics of sub layer distribution. According to the study, Mutual relation to the N value and the soil modulus of deformation showed 400N to 800N to the fine grained soil and weathered soil. It showed simular tendancy with the proposed expression of Schmertmann. But Weathered rock was over estimated as 4,200N. $k_h$ to the sedimentory soil and weathered rock each showed these orded of Schmertmann-PMT-2,800N and Schmertmann-2,800N-PMT. As the factor($\alpha$) 4 was applied to the estimation in weathered rock, $k_h$ to the PMT was calculate as a big value. If the pile is long and the pile is surpported to the soil, Lateral displacement was in inverse proportion ratio to the value of $k_h$. But the case of shallow soil layer(early bedrock) and the short pile, Lateral displacement was affected by the behavior of socheted pile to the bedrock not by the upper soil layer.

  • PDF

GIS Technology for Environmental Gelolgic Mapping (환경 지질도 작성을 위한 GIS 응용연구)

  • 김윤종;유일현;김원영;신은선
    • The Journal of Engineering Geology
    • /
    • v.4 no.3
    • /
    • pp.321-331
    • /
    • 1994
  • Environmental geologic maps were produced on the cheong-Ju area using GIS technique. They are GIS maps on land management and regional land use planning. In the last year, the model of environmental geologic map was established, and the digital database was constructed by environmental and geotechnical data collected form various sources. The special maps for environmental geologic study were also pnoduced ; landslide hazard and risk map, cut & fill map, actual run-off map and engineering geological map. The maps are secondary models (sub-model) in order to create final environmental geologic map. Finally, Environmental Geologic Unit(EGU) was evaluated for regional land use planning and land management by EGIS(Environmental Geologic Inforafion System). This unit is very important in order to assess environmental geologic impact on large construction works and detailed road design etc.

  • PDF

The Technical Solution for Various Array Methods in Resistivity Survey (전기비저항 탐사의 다양한 배열 방법에 대한 해석 기법)

  • Park, Chung-Hwa
    • The Journal of Engineering Geology
    • /
    • v.17 no.1 s.50
    • /
    • pp.49-55
    • /
    • 2007
  • Various away methods are required in the electrical resistivity survey in order to find anomalous zone reliably. Array methods are classified as several groups. Among these group, a curved survey along the fixed elevation is designed to increase the mobility of men and survey equipments at the rough terrain. Another method is performed at the survey using inclined, curved, and horizontal boreholes. A survey can also be conducted in an arbitrary location by measurements of potentials for a multi sources. The complex data acquired using various away methods are represented by a correct images reconstructed from the 3D inversion. The element division is applied to the region in which the boreholes are curved and inclined because of a spatial discrepancies between the coordinate of each electrode and the nodal point in a model. The resistivity images are obtained from a good agreement for the anomalous zones in open slope and in survey using an inclined borehole.

Determination of priorities for management to reduce collapse accident of open excavation and road sink in urban areas (도심지 개착식 굴착공사 붕괴사고 및 도로함몰 저감을 위한 우선 관리 요소 결정)

  • Seong, Joo-Hyun;Jung, Min-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.489-501
    • /
    • 2017
  • The collapse accidents during a open ground excavation in urban areas not only lead to human injuries and material damages in the construction site, but also lead to road sinks and damages to the adjacent facilities due to settlement of ground around the construction site. Therefore, during a open ground excavation in the urban areas, it is necessary to thoroughly prepare for prevention of collapse accidents, and consider whole construction stage such as planning, design and construction. In this study, the priorities to be managed mainly were obtained in order to prevent collapse accidents during a open ground excavation. After analyzing results from past accidents cases for open ground excavations, priorities were evaluated regarding collapse-inducing elements using the Delphi technique which is a decision-making method by consensus among experts. As a result, insufficient groundwater treatment, bad geotechnical investigation and instability on construction, etc. were obtained as priorities for prevention of collapse accidents.