• Title/Summary/Keyword: function maintenance

Search Result 1,320, Processing Time 0.036 seconds

Burn-in When Repair Costs Vary With Time

  • Na, Myung-Hwan;Lee, Sangyeol
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.1
    • /
    • pp.142-147
    • /
    • 2003
  • Burn-in is a widely used method to eliminate the initial failures. Preventive maintenance policy such as block replacement with minimal repair at failure is often used in field operation. In this, paper burn-in and maintenance policy are taken into consideration at the same time. The cost of a minimal repair is assumed to be a non-decreasing function of its age. The problems of determining optimal burn-in times and optimal maintenance policy are considered.

A Case Study on Improvement of Records Management Reference Table by Reorganizing BRM : The case of Reorganization of Seoul's BRM and Records Management Reference Table (BRM 정비를 통한 기록관리기준표 개선사례 서울시 BRM 및 기록관리기준표 정비사례를 중심으로)

  • Lee, Se-Jin;Kim, Hwa-Kyoung
    • The Korean Journal of Archival Studies
    • /
    • no.50
    • /
    • pp.273-309
    • /
    • 2016
  • Unlike other government agencies, the city of Seoul experienced a three-year gap between the establishment of a function classification system and the introduction of a business management system. As a result, the city has been unable to manage the current status of the function classification system, and this impeded the establishment of standards for records management. In September 2012, the Seoul Metropolitan Government integrated the department in charge of the standard sheet for record management with the department of function classification system into a new department: "Information Disclosure Policy Division." This new department is mainly responsible for record management and information disclosure, and taking this as an opportunity, the city government has pushed ahead with the maintenance project on BRM and Standards for Record Management (hereby "BRM maintenance project") over the past two years, from 2013 to 2014. The study was thus conducted to introduce the case for the improvement of standards for record management through the BRM maintenance project by mainly exploring the case of Seoul. During the BRM maintenance project, Seoul established a unique methodology to minimize the gap between the operation of a business management system and the burden of the person in charge of the BRM maintenance project. Furthermore, after the introduction of the business management system, the city government developed its own processes and applied the maintenance result to the system in close cooperation with the related departments, despite the lack of precedence on the maintenance of the classification system. In addition, training for the BRM managers of the department has taken place twice -before and after the maintenance-for the successful performance of the BRM maintenance project and the stable operation of the project in the future. During the period of maintenance, newsletters were distributed to all employees in an effort to induce their active participation and increase the importance of records management. To keep the performance of the maintenance project and to systematically manage BRM in the future, the city government has mapped out several plans for improvement: to apply the "BRM classification system of each purpose" to the service of the "Seoul Open Data Plaza"; to reinforce the function for task management in the business management system; and to develop the function of a records management system for the unit tasks. As such, the researchers hope that this study would serve as a helpful reference so that the organizations-which had planned to introduce BRM or to perform the maintenance project on classification system-experience fewer trials and errors.

A Study on the Application of RCM(Reliability Centered Maintenance) to KTX(Korea Train express) (고속철도차량(KTX) RCM 적용에 관한 연구)

  • Lim Byeong-Ok;Yoon Deok-Gyun
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.5
    • /
    • pp.470-476
    • /
    • 2005
  • RCM developed by American air industry in early 1960, its process is most realistic for some physical assets and it permits the system to maintain given function status through decision of demand about optimum maintenance. Therefore, many industries have selected RCM technique and have carried out RCM in order to solve many problems concerning maintenance management as improvement of reliability and availability of facilities, removal of hazard element about break down and retrenchment of maintenance cost. Through the execution of RCM, we can solve actual problems. And finally we will be able to develop more and more maintenance activities with RCM notion. In this study, we will consider the application of KTX-RCM which is set up with basic theory of RCM and constructed to improve vehicle safety, availability and regularity of KTX, linking with CMMS(Computerized Maintenance Management System).

Stochastic analysis of a non-identical two-unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair

  • El-Sherbeny, M.S.
    • International Journal of Reliability and Applications
    • /
    • v.11 no.2
    • /
    • pp.123-138
    • /
    • 2010
  • This paper investigates a mathematical model of a system composed of two non-identical unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair, i.e. cheaper and costlier. This system goes for preventive maintenance at random epochs. We assume that the failure, repair and maintenance times are independent random variables. The failure rates, repair rates and preventive maintenance rate are constant for each unit. The system is analyzed by using the graphical evaluation and review technique (GERT) to obtain various related measures and we study the effect of the preventive maintenance preventive maintenance on the system performance. Certain important results have been derived as special cases. The plots for the mean time to system failure and the steady-state availability A(${\infty}$) of the system are drawn for different parametric values.

  • PDF

Improvement Plan of Educational Facilities Maintenance based on Space Level (교육환경개선사업 공간단위 업무프로세스 개선방안)

  • Bae, Chang-Joon;Park, Sang-Hun;Cho, Dong-Hyun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.72-73
    • /
    • 2019
  • As the physical functions of school buildings and the changes in the functions of educational facilities due to social change are increasing, the demand for fundamental and long-term measures for the maintenance of educational facilities is expanding. However, depending on the function of the facility, the maintenance work has been carried out only when it is directly related to the safety problem, or when the request of the school facility manager is requested, rather than supporting preventive maintenance. In this study, we investigate the maintenance process of educational facilities and propose a method to manage the maintenance process of the educational facilities in the unit of space for establishing an efficient maintenance management system.

  • PDF

Optimization of Cost and Downtime for Periodic PM Model Following the Expiration of Warranty

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.19 no.2
    • /
    • pp.587-596
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policies following the expiration of warranty: renewing warranty and non-renewing warranty. After the warranty period is expired, the system undergoes the PM periodically and is minimally repaired at each failure between two successive PMs. Firstly, we determine the expected cost rate per unit time and the expected downtime per unit time for the periodic PM model. Then the overall value function suggested by Jiang and Ji(2002) is applied to obtain the optimal PM period and the optimal PM number. Finally, the numerical examples are presented for illustrative purpose.

  • PDF

An Effective Priority Method Using Generator's Discrete Sensitivity Value for Large-scale Preventive Maintenance Scheduling (발전기 이산 민감도를 이용한 효율적인 우선순위법의 대규모 예방정비계획 문제에의 적용 연구)

  • Park, Jong-Bae;Jeong, Man-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.3
    • /
    • pp.234-240
    • /
    • 1999
  • This paper presents a new approach for large-scale generator maintenance scheduling optimizations. The generator preventive maintenance scheduling problems are typical discrete dynamic n-dimensional vector optimization ones with several inequality constraints. The considered objective function to be minimized a subset of{{{{ { R}^{n } }}}} space is the variance (i.g., second-order momentum) of operating reserve margin to levelize risk or reliability during a year. By its nature of the objective function, the optimal solution can only be obtained by enumerating all combinatorial states of each variable, a task which leads to computational explosion in real-world maintenance scheduling problems. This paper proposes a new priority search mechanism based on each generator's discrete sensitivity value which was analytically developed in this study. Unlike the conventional capacity-based priority search, it can prevent the local optimal trap to some extents since it changes dynamically the search tree in each iteration. The proposed method have been applied to two test systems (i.g., one is a sample system with 10 generators and the other is a real-world lage scale power system with 280 generators), and the results anre compared with those of the conventional capacith-based search method and combinatorial optimization method to show the efficiency and effectiveness of the algorithm.

  • PDF

Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process (추계학적 확률과정을 이용한 경사제 피복재의 예방적 유지관리를 위한 조건기반모형)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.28 no.4
    • /
    • pp.191-201
    • /
    • 2016
  • A stochastic process has been used to develop a condition-based model for preventive maintenance of armor units of rubble-mound breakwaters that can make a decision the optimal interval at which some repair actions should be performed under the perfect maintenance. The proposed cost model in this paper based on renewal reward process can take account of the interest rate, also consider the unplanned maintenance cost which has been treated like a constant in the previous studies to be a time-dependent random variable. A function for the unplanned maintenance cost has been mathematically proposed so that the cumulative damage, serviceability limit and importance of structure can be taken into account, by which a age-based maintenance can be extended to a condition-based maintenance straightforwardly. The coefficients involved in the function can also be properly estimated using a method expressed in this paper. Two stochastic processes, Wiener process and gamma process have been applied to armor stones of rubble-mound breakwaters. By evaluating the expected total cost rate as a function of time for various serviceability limits, interest rates and importances of structure, the optimal period of preventive maintenance can easily determined through the minimization of the expected total cost rate. For a fixed serviceability limit, it shows that the optimal period has been delayed while the interest rate increases, so that the expected total cost rate has become lower. In addition, the gamma process tends to estimate the optimal period more conservatively than the Wiener process. Finally, it is found that the more crucial the level of importance of structure becomes, the more often preventive maintenances should be carried out.

A Study on the Descision of Optimal Maintenance Period of Ship's Machineries using Dynamic Programming (동적계획법을 이용한 선박용기기 및 부품의 최적보전시기 결정에 관한 연구)

  • Hachiro Kido,
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.23 no.6
    • /
    • pp.785-793
    • /
    • 1999
  • There are two kinds of method in ship maintenance. One is the corrective maintenance and the other is the preventive maintenance. For these maintenances recently the stochastic techniques are widely used to keep the maximum availibility and the optimal maintenance period minimizing a given cost function. Thus this paper suggest a method to decide the optimal policy of ship's maintenances by using dynamic programming and the effectiveness of the method is verified through several examples in which failure rates and maintenance data of ship's machineries and parts are given.

  • PDF

The development of web based power plant maintenance management system (Web기반 발전설비 정비관리시스템 개발)

  • Kim, Bum-Shin;Kim, Eui-Hyun;Jang, Don-Sik;Cho, Jae-Min;Chae, Gil-Seok;Jung, Gyu-Chol
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.2059-2063
    • /
    • 2004
  • Most power plants have operated many independent computerize systems for maintenance. Independence of systems have caused complexity of business process and inconvenience of computer system management. Because the equipment and material master data is not standardize and structurize, it is difficult to manage equipment maintenance history and material delivery. Especially equipment classification criterion is important for standardization of every maintenance information. It is necessary to integrate function of independent systems for business process simplification and rapid work flow. this paper provides equipment classification criterion design and system integration method with the case of live system development.

  • PDF