• Title/Summary/Keyword: forest road surface

Search Result 45, Processing Time 0.019 seconds

Basic Study on Development of Forest Road Pavement Using Eco-Friendly Method (친환경 임도포장공법 개발을 위한 기초연구)

  • Oh, Sewook;Lee, Gilho;Kim, Donggeun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.6
    • /
    • pp.31-38
    • /
    • 2013
  • This study carried out fundamental study on the forest road pavement method of cementing the ground using the compaction equipment after laying by mixing with eco-friendly stabilizer, natural soil and water. Target strength of pavement was set to 2.0MPa and the specimen was produced per mixing ratio of cement, kinds of natural soil and curing period to evaluate the durability and unconfined compressive strength. Unconfined compressive strength test was conducted to compare strength by producing the test specimen mixing environment-friendly cement as well as the test specimen mixing cement with the same mixing ratio. To evaluate the durability, surface abrasion test and water flow resistance test were conducted. In addition, SB and GB tests were conducted using iron marble and golf ball to evaluate the walking satisfaction since it can be used by visitors due to the feature of forest road.

Analysis of the Characteristics of the Disaster Occurrence and the Disaster-prone Zones on the Forest Roads in the Jeollabuk-do Area (전라북도 지역의 임도 재해발생 및 위험지 특성분석)

  • Park, Ji-hyuck;Park, Chong-Min
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.4
    • /
    • pp.598-606
    • /
    • 2015
  • This study analyzed the characteristics of the disaster occurrence and disaster-prone zones on the 85 forest roads in the Jeollabuk-do area by referring to their forest environment factors. The on-site survey reveal the types of forest road disasters as follows: erosions of cutting slopes 54.1%, erosions of the filling slope 35.3%, collapses of cutting slopes with filling slope 9.4%, and erosions of road surface 1.1%. Disasters most frequently occurred in the vertical location (the hillside) and the horizontal location (the slope), and the forest factors affecting the road disasters were degree of cutting slopes in $31^{\circ}{\sim}40^{\circ}$, degree of filling slopes in $21^{\circ}{\sim}30^{\circ}$, and the soil texture of SiL. The most significant factors on the most frequent occurrence of forest road disasters were forest type of coniferous, slope aspect northeast, forest age of plantation and felling area, and rainfall in 1601~1700. An analysis of the occurrence of the forest road disasters in the Jeollabuk-do area showed a positive correlative relationship with the following factors of the forest environment within a 1% error: degree of cutting slope in $31^{\circ}{\sim}40^{\circ}$, annual accumulation rainfall in 1601~1700. and showed a positive correlative relationship with the following factors of the forest environment within a 5% error: horizontal location of valley, forest type of coniferous, length of slope more than 20 m, forest age of plantation and felling area, soil texture of SiL.

Evaluation and Prediction of Failure Factors by Quantification Theory(II) on Banking Slopes in Forest Road (수량화(數量化)II류(類)에 의한 임도(林道) 성토사면(盛土斜面)의 붕괴요인(崩壞要人) 평가 (評價) 및 예측(豫測))

  • Cha, Du Song;Ji, Byoung Yun
    • Journal of Korean Society of Forest Science
    • /
    • v.88 no.2
    • /
    • pp.240-248
    • /
    • 1999
  • On the basis of data obtained from five forest roads collapsed due to a heavy rainfall of 1995 in Chunchon, Kangwon-do, this study was carried out to evaluate and predict the fill slope failure of forest roads with four factors of forest road structure and those of location condition by using Quantification theory(II). The results were summarized as follows ; In the structure factors of forest road, the fill slope failure was mainly occurred in longitudinal gradients less than $2^{\circ}$ or more than $4^{\circ}$, distance of surface-flow longer than 80m, fill slope length greater than 6m, and fill slope gradients steeper than $35^{\circ}$. In the factors of location condition, the failure was mainly occurred in ridge portion of road position, weathered rock and soft rock of constituent material, slope gradients in the range from $35^{\circ}$ to $45^{\circ}$, and concave and convex of longitudinal slope forms. The priority order for factors influencing on fill slope failure was ranked by fill slope length, constituent material, road position, and so on. And the rate of correct discrimination by analysis of fill slope failure was estimated at the high prediction of 86.5%.

  • PDF

Status of Damage and Restoration Planning of Forest Trail in Choansan(Mt.) Neighborhood Park, Seoul, South Korea (초안산근린공원 숲길 훼손 실태 및 복원방안 연구)

  • Han, Bong-Ho;Ki, Kyong-Seok;Noh, Tai-Hwan
    • Korean Journal of Environment and Ecology
    • /
    • v.26 no.6
    • /
    • pp.923-933
    • /
    • 2012
  • The purpose of this study targeting Choansan(Mt.) Neighborhood Park in Seoul of South Korea, whose level of visitation and use pressure has been recently increasingly high, was to understand distribution and damage status of forest trail and accordingly, set up direction of how to improve forest trail in urban area. With regards to current damage on forest trail in Choansan(Mt.) Neighborhood Park, the damaged trail with road width of over 2m and with erosion depth of over 30cm amounted to 20.3% and 36.3% respectively. And the trail section with bare land erosion, root exposure or rock exposure and the section whose impact rating class exceeded IV occupied 47.0% and 70.6%, indicating the forest trail was severely damaged. The severely injured trail route mainly included the main forest trail formed along the main ridge, the byroad connected to the main forest trail and the steep forest trail in low-lying area. Based on the study results, five types of restoration of forest trail in Choansan(Mt.) Neighborhood Park were offered, including prevention of forest trail extension, stabilization of forest trail base, maintenance of forest trail surface, vegetation restoration after closing forest trail and maintenance. Ecological restoration was additionally offered. The prevention of forest trail extension was planned to prevent expanded width of forest trail where bare land was exposed. The stabilization of forest trail base was planned to prevent erosion in the forest trail and exposure of roots. The maintenance of forest trail surface was planned in a way to protect the severely damaged forest trail surface by using wood deck and wood stairs and surfacing the road.

Using Gabion Systems with Vegetation Base Materials on Stability Analysis for the Forest Road Cut-slope Rehabilitation Techniques (임도비탈면의 복원을 위한 식생기반재 돌망태의 안정성 분석)

  • Park, Jae-Hyeon;Jeong, Yong-Ho;Choi, Hyung-Tae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.12 no.2
    • /
    • pp.106-113
    • /
    • 2009
  • In this study, stability of the new gabion system with vegetation base materials was analysed. New gabion system with vegetation base materials is a new approach which has been developed to achieve lope stabilization and revegetation of forest road cut-slope by making the best use of advantages of gabion systems with vegetation base materials. Results from stability analysis are as follows. For the soil density, the angle of internal friction and unit weight of the rock fill was assumed to be $1.90g/cm^3$, $30^{\circ}$ and $2.30t/m^3$, respectively, the slope stability analysis showed that the new gabion system couldn't require any poles to fix it up, and could keep stable during both rainy and dry seasons. As the results of checks against overturning and sliding, the retaining wall with. the new gabion system could produce suitable factors of safety for overturning and sliding. Vegetation established on the surface of the new gabion systems indirectly can help to increase slope stability by prevention of surface erosion. Consequently, the new gabion system with vegetation base materials could achieve the desired effect on slope stabilization as much as existing gab ion system could do, and could promote rapid establishment of vegetation on cut-slopes.

Analysis of Bearing Capacity Change of Forest Roadbed by Opening Year (개설시기에 따른 임도 노반의 지지력 변화분석)

  • Chen, Hyeong-Uk;Kim, Dong-Hyeon;Lee, Kwan-Hee;Kim, Dong-Geun
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.3
    • /
    • pp.322-328
    • /
    • 2019
  • The purpose of this study was to provide basic data for maintenance and repair of the forest road surfaces using the light drop weight test (LDWT), density test, and grain size analysis at four sites in Yeongyang-gun Mt. (2011y, 2014y, 2016y, and 2017y). In terms of the density test results, the opening density in 2011 was the highest at $2.0694g/cm^3$, and the opening density in 2017 was the lowest at $1.7443g/cm^3$. The grain size analysis showed that the proportion of large aggregates was highest at the opening in 2017, and the proportion of large aggregates decreased with the delay of opening date. From the LDWT results, $E_{vd}$ (the dynamic deformation coefficient) of the 2011y forest road was $35.7MN/m^2$, 2014y was $30.5MN/m^2$, 2016y was $28.6MN/m^2$, and 2017y was $23.5MN/m^2$. The $E_{vd}$ value for the oldest forests opened with the 2011y forest road was the highest, the average $E_{vd}$ value of the center portion was $21.45MN/m^2$, the average $E_{vd}$ value of the wheel portion of the banking part was $31.31MN/m^2$, and the average $E_{vd}$ value of the wheel portion of the cut part was $36.71MN/m^2$.

Influences of Environmental Factors on Soil Erosion of the Logging Road in Timber Harvested Area (성숙임목벌채지(成熟林木伐採地)에서 운재로(運材路)의 침식(浸蝕)에 미치는 환경요인(環境要因)의 영향(影響))

  • Park, Jae-Hyeon;Woo, Bo-Myeong;Jeong, Do-Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.84 no.2
    • /
    • pp.239-246
    • /
    • 1995
  • This research aimed at the contribution to obtaining the scientifical data which were required for planning she environmentally sound and sustainable management, particularly in the field of the logging road construction. Main natural environmental variables including natural vegetation, rainfall, soil runoff were measured in the logging road on-sites and analysed. This project was carried out at the (mt.)Paekunsan Research sorest of Seoul National University, located in Gwangyang, Chollanam-do in southern part of Korea, from 1993 to 1994. 1. The explanatory variables for erosion and sedimentation on logging road surface were accumulated rainfall, erosion distance, cross-sectional gradient, and soil hardness. The erosion and sedimentation on logging road was increasing positively in proportion to the accumulated rainfall, soil distance from starting point of the logging road, and cross-sectional gradient. 2. On cut-slope of logging road, cut-slope shape, part of the slope, plant coverage, soil hardness, sand content, accumulated rainfall, clay content, and silt content were effective factors. Cut-slope erosion and sedimentation on logging roam increased as with the lower plant coverage, the lower accumulated rainfall, the high sand content in the soil. 3. On fill-slope of logging road, there were three significant variables such as total rainfall and number of rainfall-storm. Fill-slope erosion and sedimentation had a positive correlation with the amount of rainfall, the number of rainfall, the soil hardness. 4. The total erosion and sedimentation on logging road were $5.04{\times}10^{-2}m^2/m^2$ in logging road construction year, $7.37{\times}10^{-2}m^2/m^2$ in next year. The erosion and sedimentation on logging road surface were 32.7% of total erosion and sedimentation on Logging road in construction year, and 57.1% in next year, respectively. The erosion and sedimentation on cut-slopes were 30.4% on logging road in construction year, fill-slopes of total erosion and sedimentation and 21.0% in next year, respectively. The erosion and sedimentation on fill-slopes were 36.9% on logging road in construction year, 21.9 in next year. To decrease the erosion and sedimentation at the logging road from the beginning stage of construction, the effective revegetation works should be implemented on the cut-slope and fill slopes, and erosion control measures such as optima. road design must be constructed on read surface.

  • PDF

Effects on the Early Growth of Revegetation Plants by Microorganisms in Slope of Forest Road (임도사면에 있어서 미생물처리가 녹화식물의 초기생육에 미치는 영향)

  • Ma, Ho-Seop;Park, Jin-Won
    • Journal of Korean Society of Forest Science
    • /
    • v.95 no.4
    • /
    • pp.423-428
    • /
    • 2006
  • This study was carried out to investigate the early growth of revegetation plants by microorganisms in slope of forest road in Jinju area. The results were summarized as follows; The chemical properties of forest soil were changed by microorganisms. Soil pH, organic mater content, concentrations of total nitrogen, available phosphorus, exchangeable cations and CEC in treated plot were increased more than those of controlled plot in the surface soil. It showed that the availability of nutrients including nitrogen and phosphorus was increased by an application of microorganisms in the soil. The coverage rates showed statistically significant differences between plots (p<0.05). The germination rates of woody plants were better in treated plot than in controlled plot. The results indicate that the application of microorganisms would be significantly contributed for the early growth of revegetation plants on slope of forest road.

Sediment Discharge and Invasion of Plants on the Slope of the Forest Roads(II) - Invasion of Trees on the Banking Slope - (임도사면(林道斜面)의 토사유출(土砂流出)과 식생침입(植生侵入)에 관한 연구(硏究)(II) - 성토사면(盛土斜面)의 목본식물침입(木本植物侵入)을 중심(中心)으로 -)

  • Chun, Kun Woo;Oh, Jae Man
    • Journal of Korean Society of Forest Science
    • /
    • v.82 no.4
    • /
    • pp.354-365
    • /
    • 1993
  • The purpose of this investigation is to point out the physical fixation and stability of banking slopes of forest roads by invasion of trees. We investigated the situations of sediment discharge and coverage of invaded trees at banking slopes of forest roads. The coverage of invaded trees were calculated from crown injection based on the stable slope and was compared with length of slope, slope gradient, and passage years after construction of forest road. 1. We investigated on the sediment discharge and the invasion of trees at banking slopes, which were actually observed 8 forest roads of Kyonggi-Do and Kangwon-Do. 2. There was no physical stability of the banking slope due to the surface erosion and slope failure, but the tree invasions were active at the stable plots. 3. The length of slope was constructed to 4.0m to 61.0m and recent forest road was mainly constructed to the slopes longer than 30m. There was strong regional effect between the length of slope and the coverage of invaded trees and the above two factors were inversely proportional to each other. 4. There was no significant relationship between the slope gradient and the coverage of invaded trees and the slope constructed within the angle of repose showed the relatively high coverage of invaded trees. 5. There was no significant relationship between the passage years and the coverage of invaded trees in the same investigative region after the construction of forest road. But there was a gradually increasing relationship of tree invasion between above two factors. However, there was some limitation to expect the invasion of the tree species. 6. In the light of the above results, we suggest that the construction of forest road may need foundation work and vegetation work simultaneously for the physical stability to make the environment of tree plantation and that the reasonable increase of construction cost of forest road may be prior to the other factors.

  • PDF

A Study on the Use of GIS-based Time Series Spatial Data for Streamflow Depletion Assessment (하천 건천화 평가를 위한 GIS 기반의 시계열 공간자료 활용에 관한 연구)

  • YOO, Jae-Hyun;KIM, Kye-Hyun;PARK, Yong-Gil;LEE, Gi-Hun;KIM, Seong-Joon;JUNG, Chung-Gil
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.21 no.4
    • /
    • pp.50-63
    • /
    • 2018
  • The rapid urbanization had led to a distortion of natural hydrological cycle system. The change in hydrological cycle structure is causing streamflow depletion, changing the existing use tendency of water resources. To manage such phenomena, a streamflow depletion impact assessment technology to forecast depletion is required. For performing such technology, it is indispensable to build GIS-based spatial data as fundamental data, but there is a shortage of related research. Therefore, this study was conducted to use the use of GIS-based time series spatial data for streamflow depletion assessment. For this study, GIS data over decades of changes on a national scale were constructed, targeting 6 streamflow depletion impact factors (weather, soil depth, forest density, road network, groundwater usage and landuse) and the data were used as the basic data for the operation of continuous hydrologic model. Focusing on these impact factors, the causes for streamflow depletion were analyzed depending on time series. Then, using distributed continuous hydrologic model based DrySAT, annual runoff of each streamflow depletion impact factor was measured and depletion assessment was conducted. As a result, the default value of annual runoff was measured at 977.9mm under the given weather condition without considering other factors. When considering the decrease in soil depth, the increase in forest density, road development, and groundwater usage, along with the change in land use and development, and annual runoff were measured at 1,003.5mm, 942.1mm, 961.9mm, 915.5mm, and 1003.7mm, respectively. The results showed that the major causes of the streaflow depletion were lowered soil depth to decrease the infiltration volume and surface runoff thereby decreasing streamflow; the increased forest density to decrease surface runoff; the increased road network to decrease the sub-surface flow; the increased groundwater use from undiscriminated development to decrease the baseflow; increased impervious areas to increase surface runoff. Also, each standard watershed depending on the grade of depletion was indicated, based on the definition of streamflow depletion and the range of grade. Considering the weather, the decrease in soil depth, the increase in forest density, road development, and groundwater usage, and the change in land use and development, the grade of depletion were 2.1, 2.2, 2.5, 2.3, 2.8, 2.2, respectively. Among the five streamflow depletion impact factors except rainfall condition, the change in groundwater usage showed the biggest influence on depletion, followed by the change in forest density, road construction, land use, and soil depth. In conclusion, it is anticipated that a national streamflow depletion assessment system to be develop in the future would provide customized depletion management and prevention plans based on the system assessment results regarding future data changes of the six streamflow depletion impact factors and the prospect of depletion progress.