• Title/Summary/Keyword: for Project Quality Plan

Search Result 237, Processing Time 0.03 seconds

Quality-Based Software Project Staffing and Scheduling with Project Deadline (제한된 프로젝트 기간을 고려한 품질 기반 소프트웨어 프로젝트 계획 생성 기법)

  • Seo, Dongwon;Shin, Donghwan;Bae, Doo-Hwan
    • Journal of KIISE
    • /
    • v.42 no.7
    • /
    • pp.878-888
    • /
    • 2015
  • Software project planning includes several processes for estimating the effort required to complete software project tasks, allocating human resources to tasks, and creating a project plan. Because software planning is becoming more complicated as the size of software projects grow, it is difficult for project managers to decide on a reasonable project plan. To help them, many automatic software project planning approaches have been proposed. The approaches all focus on minimizing project duration. But if the plan is simply to minimize the duration, without considering software quality, the plan can harm the eventual software quality. In our research to create a reasonable project plan, we consider software quality as well as duration of the project, by defining a software quality score. The project manager can plan the project to maximize software quality for a specific project duration.

The Outline of Han River Basin Environmental master Plan Project (한강유역 환경보전 종합계획 사업의 개요)

  • 이선환
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.1
    • /
    • pp.46-50
    • /
    • 1982
  • Following rapid industrial development and urbanization in Korea, there is a need for the Government to implement effective control of pollution and to undertake specific schemes in areas where pollution of the environment is severe. In response to this need, Government of Korea prepare Han River Basin Environmental Master Plan Project for water, air, solid waste to cover environmental protection of the Han River Basin. The Project area is approximately 27,000 sq. Km extending over Seoul, Kyunggi, Kwangwon, Chungbuk Province. The total population of Master Plan Project area is approximately 11.6 million, or one-third of the total population of Korea. There are about 8,000 industries, including those located in 16 industrial complexes, in the project area. The scope of work and terms of reference are the following: (1) A Summary of existing land use and forecasts for changes in land use by the year 2,000. (2) Emission inventories for air, waste water, and solid wastes. (3) Forecasts of future population growth patterns and pollution loadings. (4) Identification of specific projects needs to reduce pollution levels and satisfy the environmental quality standards. (5) A Program of enforcement to include (i) self monitoring, and (ii) governmental inspections and surveillance. (6) A program for quality improvement and quality assurance of environmental measurements. (7) Reports summarizing all data collected analyzed during the study. (8) Conceptual design and feasibility studies, including cost estimates, for needed pollution control projects. (9) A financial plan for future detailed design and construction of public facilities, for financial incentives to industry, and for user charges for industrial use of public treatment of disposal works.

  • PDF

Development of a system for Project Quality Plan in Connection with Schedule D/B (공정D/B 연계를 통한 품질계획서 운영시스템 개발)

  • Moon Jin-Young;Kim Kyung-Rai;Kim Yea-sang;Chin Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.444-449
    • /
    • 2001
  • Because of preferential treatment in PQ judgement, many construction company got the certification of ISO 9000. But the main objective of them was just certification itself. The ISO 9000 certification which was composed of 20 requirements was a standard just for the manufacturing industry, so it was difficult that it was applied to a business of construction industry. In these reasons, they have revised ISO 9000:l994 which was composed or 20 requirements to ISO 9000:2000 which requests to focus on business process. In this research, we'll develop a System for Project Quality Plan that is related with information of site process in an apartment housing project. This system is intended to increase use of project quality plan in construction sites based on the construction process.

  • PDF

A PLANNING MODEL FOR APARTMENT DEVELOPMENT PROJECT REFLECTING CLIENT REQRUIREMENTS

  • Yoo-Shin Kim;Ye-Keun Oh;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.774-779
    • /
    • 2005
  • Client requirements is a concept with increasing interest in relation to several outcomes of companies, and in particular, in the event of apartment project that takes large share in the domestic construction industry, diverse angle of survey is performed to discover the client requirements and reflect them to the project to improve the quality. For this purpose, it is required to learn the client requirements and apply it in the apartment project, and the QFD (Quality Function Deployment) linked ROQ (Return On Quality) is a technique used in the manufacturing that surveys the client requirements to improve the customer satisfaction, and apply it to the quality improvement program to improve the profitability in this process. In this study, through the application of the ROQ process, the plan to improve the apartment quality management is presented. For this purpose, the consumer interview survey, FGI (focus group interview) survey and the client requirements are analyzed, and thereafter, through the interview with the specialist, the quality improvement program that enables the application to the product development of new apartment product is established. Through this process, the new apartment quality management improvement plan is presented.

  • PDF

Minimizing Project Quality Costs by Activity-Based Prevention (활동기준예방에 의한 프로젝트 품질코스트 최소화)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.

A Study on the Planning Alternatives for the Residential Environment Improvement of the New Rural Village(the YoungMoon Project Site) (농촌문화마을 주거환경개선을 위한 공간계획 방향 연구 - 경기도 양평군 광탄리 용문지구 문화마을계획을 중심으로 -)

  • 임승빈;조순재
    • Journal of Korean Society of Rural Planning
    • /
    • v.4 no.1
    • /
    • pp.22-31
    • /
    • 1998
  • For the improvement of the cultural rural village(new rural village project), it is very important to find the various planning alternatives. The purpose of this study is to suggest the ideas which are able to be applied to the rural site planning. The YoungMoon project site located in Kyunggi province was selected case study, The followings are suggestions developed in the process of preparing an alternative plan for the case study. 1) The preparing of the rural site plan is the organizing process of the planning ideas responsive to the condition of both a project site and the project directions. 2) In developing the schematic plan, it is very useful to introduce the cluster madang (small public open space) including 25 houses as a basic planning unit. 3) In comparison with the project plan, the alternative plan presented by this study has advantages of amenity and public space of the residential environment of the new rural village. It is properly said that we have to more and more discuss the best solution to take in planning the rural site, and this efforts contribute the improvement of the quality of the new village project.

  • PDF

A Study on Mega-Y Project Innovation Activities (대형 혁신과제 추진방법에 대한 연구)

  • Sung, Su-Gyeong;Kim, Joon-Seok;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.4
    • /
    • pp.531-539
    • /
    • 2010
  • Mega-Y project is very important for a company to gain a competitive advantage in markets or to achieve drastic change in the internal processes. It stems from the company strategy and annual management goals or key performance measures, and is proceeded by the cross-functional team. This paper presents the success factors and implementation process of the Mega-Y projects. The implementation process is presented in 5 steps, including project selection, cross-functional team building, establishment of the master plan, development and execution of sub-projects, and project completion. A case study on the cost reduction project of aircraft development is presented to help for the practitioners to deploy the implementation process introduced in this paper.

A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management (프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례)

  • Jung, Ha-Sung;Lee, Dong-Wha;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

A Development of Cost Estimation Model for Data Quality Analysis and Improvement Project (DB 품질개선사업의 대가 산정 모형연구)

  • Seo, Yong Won;Lee, Duck Hee;Jung, Seung Ho;Park, Kun Soo
    • Journal of Information Technology Services
    • /
    • v.14 no.2
    • /
    • pp.51-68
    • /
    • 2015
  • As interests in the quality of data in database systems are growing recently, analysis and improvement of data quality in databases have been an important issue. However, there has yet to be a clear agreement on how to reasonably calculate the total cost of such project. In this paper, based on real project data and budget statistics, we develop a model to estimate the cost for quality analysis and improvement project of a database. We first conduct statistical analysis to build our basic model. Throughout this analysis, we have identified factors that determine the scale of works required to conduct the project and eventually determine the cost. In addition, we have identified factors that determine the complexity of the project. These factors can adjusts the cost determined by the scale of works. Our model is verified and improved by surveys on experts. We apply our model to newly conducted projects and observe that our model estimates the cost of each project reasonably well.

Restoration and Landscape Ecological Design to Restore Mt. Nam in Seoul, Korea as an Ecological Park (복원 및 경관생태학적 원리에 근거한 남산의 생태공원화 계획)

  • 이창석;문정숙;김재은;조현제;이남주
    • The Korean Journal of Ecology
    • /
    • v.21 no.5_3
    • /
    • pp.723-733
    • /
    • 1998
  • Restoration to improve the ecological quality of Mt. Nam was explored in a viewpoint of restoration in both landscape and ecosystem levels. A restoration plan in landscape level was based on the result on the land-use pattern in Mt. Nam including its surrounding area and that in ecosystem level on the ecological quality of each landscape element. A plant to construct the green network, which extending from Mt. Nam to the Han river through the Yongsan family park and through the Eungbong urban park was prepared as a restoration project in landscape level to improve the ecological quality of Mt. Nam as an ecological park. On the other hand, a plan for restoration and creation of biotop as a restoration project in ecosystem level was also prepared to improve the ecological quality of each green area consisting green network. Green areas composing green network include keystone green area (Mt. Nam), green stations (Yongsan family park, Eungbong urban park, and the han river citizen's park), and green pathway (or ecological corridor) connecting those green areas.

  • PDF