• 제목/요약/키워드: feeder line

검색결과 182건 처리시간 0.026초

급전선로에 설치되어 있는 피뢰기의 누설전류 측정과 관리방안 (Leakage Current Measurement and Management of Arresters Installed in Feeder Lines)

  • 한주섭;서황동;길경석;한문섭;장동욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.819-824
    • /
    • 2005
  • This paper describes the measurement result of leakage current flowing arresters connected in feeder lines to propose an optimal management method. Twenty seven arresters set in seven areas were analyzed on a regular basis for 4 months. The results showed that the RMS and the peak value of the total leakage currents for soundness arresters were a range of $200uA{\sim}00uA$. respectively. During the period of measurement, the magnitude of the leakage current didn't show conspicious changes and there were impossible places to analyze arrester's status due to including high THD rate in a feeder line, From the study, leakage current measurement has to be performed at a condition without running an electric train in the line, and the allowable RMS value of soundness arrester is bellow 600uA.

  • PDF

열차운행 시격 변경에 따른 트램 급전계통 해석 (Analysis of Tram Feeding System according to Train Diagram Change)

  • 김동만;장진영;김재문;김양수
    • 전기학회논문지
    • /
    • 제64권4호
    • /
    • pp.634-639
    • /
    • 2015
  • In order to understand phenomenon of the electric railway power feeding system in the construction planning step, analysis of the overall system including electric characteristic of electric railway power feeding system, train running characteristic and power consumption pattern and train operation plan and gradients of railroad and curve radius is required. This paper study the feeder system by analysis of comprehensive system according to train operation plans, line impedance, running characteristic of train, electrical properties of the feeder system. In order to understand phenomenon to the feeder system of tram exactly regarding export of the field railroad preceeding actively recently.

마이크로스트립 라인-프로브 급전구조를 갖는 광대역 패치 안테나의 설계 (The Design of Broadband Patch Antenna with Microstrip Line-Probe Feeder)

  • 박종열;이윤경;윤현보
    • 한국전자파학회논문지
    • /
    • 제13권7호
    • /
    • pp.687-692
    • /
    • 2002
  • 본 논문에서는 중심주파수가 5.8 GHz에서 동작하는 새로운 급전구조를 갖는 광대역 마이크로스트립 패치 안테나를 설계 및 제작하였다. 제안된 새로운 급전구조인 마이크로스트립 라인-프로브 급전구조는 광대역 특성을 가지며, 안테나의 패치 크기를 줄일 수 있다. 광대역 특성을 확인하기 위해 기존의 프로브 급전 마이크로스트립 패치 안테나와 비교하였으며, 그 결과 대역폭은 34.5 % 증가하였으며, 패치의 크기는 45 % 축소되었다.

적정 배전계통 구성을 위한 선로분할 효과 분석 (Analysis of Distribution Line Sectionalizing Effects for The Probable Distribution System Configuration)

  • 김재환;하복남;남기영;이주광
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.86-89
    • /
    • 1993
  • This paper contains the various effect of distribution feeder sectionalizing by distribution automation. The effect by automatic sectionalizing switch and the effect by manual switch are analyzed and shown according to the radial feeder and the loop feeder respectively. Based on the reliability analysis, the reference for the feeder division and sectionalization is recommended. Also, the necessary number of manual switch where the automatic switch is installed is recommended through the reliability analysis.

  • PDF

배전계통의 다양한 이벤트들을 고려한 선로자동화 소프트웨어 개발 (Development of Feeder Automation Software Considering the Diversity Events of Distribution System)

  • 고윤석;김윤집;백영구;이기서
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.307-309
    • /
    • 2002
  • This paper proposes an expert system, which is able to determine the problem-solving strategy for diversity events occurred on the distribution system. The events include events related to the fault, scheduled outage and optimal operating task such as feeder line fault, line scheduled outage, line overload, system load balancing, system loss minimization, main transformer fault, main transformer scheduled outage, main transformer overload, main transformer protection control. The expert system enhances the reliability of software designed by the integrated concept for the diversity events.

  • PDF

영상처리를 이용한 현미의 온라인 품위판정 알고리즘 (On-line Inspection Algorithm of Brown Rice Using Image Processing)

  • 김태민;노상하
    • Journal of Biosystems Engineering
    • /
    • 제35권2호
    • /
    • pp.138-145
    • /
    • 2010
  • An on-line algorithm that discriminates brown rice kernels on their echelon feeder using color image processing is presented for quality inspection. A rapid color image segmentation algorithm based on Bayesian clustering method was developed by means of the look-up table which was made from the significant clusters selected by experts. A robust estimation method was presented to improve the stability of color clusters. Discriminant analysis of color distributions was employed to distinguish nine types of brown rice kernels. Discrimination accuracies of the on-line discrimination algorithm were ranged from 72% to 85% for the sound, cracked, green-transparent and green-opaque, greater than 93% for colored, red, and unhulled, about 92% for white-opaque and 67% for chalky, respectively.

철도차량기지용 단권변압기의 전압강하에 대한 이론적 고찰 (A Theoretical Study on Voltage Drop of Auto-Transformer for Railway Vehicle Base)

  • 유기성;김재문
    • 전기학회논문지
    • /
    • 제67권12호
    • /
    • pp.1723-1728
    • /
    • 2018
  • In order to investigate the voltage drop compensation effect of AT for domestic railway vehicle base, the parameters of AT voltage drop of railroad car base are Z3 (Impedance of feeder line), Xn ( Distance from railroad vehicle to AT to SS), and Dn (distance between both ATs of railway vehicle).In addition, when installed in a SSP for a railway vehicle base, there is no AT and feeder line in the railway vehicle base except for the SSP for the main line and the SSP for the railway vehicle base, so that if zero or ignored, the AC single-phase two- It can be confirmed that it becomes a form.

A FEEDER CONTROL FOR THE SMT MOUNTER USING LON CHIP

  • Lim Eung-Kyu;Rho Sung-Chan;Kim Yoon-Ho
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 Proceedings ICPE 01 2001 International Conference on Power Electronics
    • /
    • pp.121-125
    • /
    • 2001
  • SMD mounter is necessary in PCB assembling line. To feed SMD components to the mounter, high performance feeders are needed. Until now, mechanical air feeders have been mainly used. However, in these days, electrical feeders with network are developed. There are many kinds of feeders with various control techniques. In this paper, a feeder with BLDC motor and LON chip is designed and implemented. And, the experimental results are presented.

  • PDF

터널 구간 66kV 급전선 차폐층 접지 시공 방법에 관한 검토 (Review of the earthing method of the copper wire shield of 66kV feeder cable in tunnel area)

  • 권삼영;김도원;안영훈;박현준
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1474-1479
    • /
    • 2004
  • In electrification of the Honam line, the grounding method of the copper wire shield of 66kV feeder cable was disputed. This paper describes that the review of the proper earthing method(one-side earthing or both-side earthing) under consideration of the site condition and the acceptability of the induction voltage of the shield on the end of the cable.

  • PDF

배전선로 운전용량 상향에 따른 개폐기 설치 기준 분석 (Analysis of the Switch Installation Criteria by Increasing Operating Capacity in Distribution Line)

  • 조남훈;하복남;이흥호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권6호
    • /
    • pp.290-295
    • /
    • 2002
  • The present assignment in installing the number of switches for distribution line was made on the basis of a normal feeder capacity 7,000kVA in KEPCO(Korea Electric Power Corporation), Korea. But the normal capacity is revised to 10000kVA in 1998. Even increasing limit of the operating capacity of the distribution lines enables us to give some benefit for the operation flexibility and investment cost of the distribution system. It is disadvantageous in the viewpoint of supply reliability. In distribution systems, switches are equipped to improve the reliability of distribution systems by minimizing the outage section due to fault and maintenance. Utility generally improves the reliability by minimizing the length of outage section, which is caused by fault and maintenance, through switch equipment on distribution system. In order to cope with the changes such as operation capacity, it is necessary to study whether the present criteria is reasonable or not, also to confirm whether the present criteria of installing switches in line is improved or not. In this study, we proposes the number of switch per feeder on the basis of present operation capacity in distribution system.