• Title/Summary/Keyword: failure site

Search Result 765, Processing Time 0.027 seconds

A Geotechnical Parameter Estimation of Underground Structures in Elasto -plastic Condition (지하공간 건설시 탄.소성 모델에 의한 지반계수 추정)

  • Lee, In-Mo;Kim, Dong-Hyeon;Lee, U-Jin
    • Geotechnical Engineering
    • /
    • v.13 no.4
    • /
    • pp.85-94
    • /
    • 1997
  • The design and construction of underground structures contain many substantial mincer dainties. A reasonable estimation of geotechnical parameters is of paramount importance and must be one of the most difficult tasks in designing and constructing underground structures. If the plastic zone exists by tunnel excavation, the ground response may also be dependent on the yield criterion mainly composed of strength parameters. In order to estimate unknown model parameters from the in-situ measurements as well as prior estimates for designing tunnels which have plastic zones, the Extended Bayesian Method(EBM) is adopted : an elasto-plastic finite element program is linked to the EBM as a mathematical model to predict the ground response. Mohr-Coulomb failure criterion is used to represent the plastic behavior. A hypothetical underground site, where the ground behaves elasto-plastically, is adopted to demonstrate the validity of the proposed feedback system.

  • PDF

Tensile strength of bilayered ceramics and corresponding glass veneers

  • Anunmana, Chuchai;Champirat, Tharee;Jirajariyavej, Bundhit
    • The Journal of Advanced Prosthodontics
    • /
    • v.6 no.3
    • /
    • pp.151-156
    • /
    • 2014
  • PURPOSE. To investigate the microtensile bond strength between two all-ceramic systems; lithium disilicate glass ceramic and zirconia core ceramics bonded with their corresponding glass veneers. MATERIALS AND METHODS. Blocks of core ceramics (IPS e.max$^{(R)}$ Press and Lava$^{TM}$ Frame) were fabricated and veneered with their corresponding glass veneers. The bilayered blocks were cut into microbars; 8 mm in length and $1mm^2$ in cross-sectional area (n = 30/group). Additionally, monolithic microbars of these two veneers (IPS e.max$^{(R)}$ Ceram and LavaTM Ceram; n = 30/group) were also prepared. The obtained microbars were tested in tension until fracture, and the fracture surfaces of the microbars were examined with fluorescent black light and scanning electron microscope (SEM) to identify the mode of failure. One-way ANOVA and the Dunnett's T3 test were performed to determine significant differences of the mean microtensile bond strength at a significance level of 0.05. RESULTS. The mean microtensile bond strength of IPS e.max$^{(R)}$ Press/IPS e.max$^{(R)}$ Ceram ($43.40{\pm}5.51$ MPa) was significantly greater than that of Lava$^{TM}$ Frame/Lava$^{TM}$ Ceram ($31.71{\pm}7.03$ MPa)(P<.001). Fluorescent black light and SEM analysis showed that most of the tested microbars failed cohesively in the veneer layer. Furthermore, the bond strength of Lava$^{TM}$ Frame/Lava$^{TM}$ Ceram was comparable to the tensile strength of monolithic glass veneer of Lava$^{TM}$ Ceram, while the bond strength of bilayered IPS e.max$^{(R)}$ Press/IPS e.max$^{(R)}$ Ceram was significantly greater than tensile strength of monolithic IPS e.max$^{(R)}$ Ceram. CONCLUSION. Because fracture site occurred mostly in the glass veneer and most failures were away from the interfacial zone, microtensile bond test may not be a suitable test for bonding integrity. Fracture mechanics approach such as fracture toughness of the interface may be more appropriate to represent the bonding quality between two materials.

Dynamic Bearing Pressure of Inverted T-type Retaining Walls Subjected to Seismic Motion (지진시 동토압을 받는 역 T형 옹벽의 접지압 산정에 관한 연구)

  • Lee, Jin-Sun
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.16 no.2
    • /
    • pp.35-45
    • /
    • 2012
  • Pseudo static analysis using the Mononobe-Okabe method and numerical analysis considering a small strain nonlinearity from the soil were performed to determine the bearing pressure changes of the inverted T-type retaining wall subjected to earthquake motions. In many cases, an inverted 'T' type retaining wall of more than 10 m shows bearing capacity failure under earthquake conditions, despite showing sufficient bearing capacity during normal conditions. The most important reason for this is the change of the effective base area during an earthquake. In this paper, the change of the effective base area of an inverted 'T' type wall is analyzed by using finite difference element code (FLAC). In addition, the effect of dynamic bearing capacity coefficients (which has been suggested by several researchers but not adopted in current design codes and procedures) was verified.

Additional axial K-wire Fixation for Proximal Crescentic Metatarsal Osteotomy : A Biomechanical Study (반월형 근위 중족골 절골술에 대한 보강적 축성 K-강선 고정술 : 생체역학적 연구)

  • Jung, Hong-Geun;Kim, You-Jin;Guyton, Gregory
    • Journal of Korean Foot and Ankle Society
    • /
    • v.7 no.2
    • /
    • pp.151-156
    • /
    • 2003
  • Purpose: Proximal crescentic metatarsal osteotomy(PMO) is one of the most common procedures for correcting moderate to severe degree hallux valgus deformity. Although screw fixation is used for osteotomy site stability, loss of reduction can occur. The purpose of this study is to compare the sagittal plane stability of the conventional crescentic PMO fixed with a single screw with that of the crescentic PMO fixed with 1 screw and 2 supplemental K -wires. Material and Methods: Ten matched pairs of cadaveric foot specimens were used for the proximal crescentic metatarsal osteotomy. For one foot specimen of each pair, crescentic osteotomy was fixed with 4mm long threaded cannulated screw, while the matched pair was prepared by adding two axial 1.6mm K-wires to the conventionally fixed 4mm screw. The extensometer was used to measure the osteotomy gap as the metatarsal head was loaded continuously until failure using a servohydraulic MTS Mini Bionix test frame. The strength of fixation was normalized with the bone mineral density (BMD) of the paired specimen $(N{\times}cm^{2}/gm)$, Result: The average strength of the crescentic PMO with axial K-wire fixation ($458.8cm^{2}/gm$, S.D. 434.3) was significantly higher than the standard crescentic PMO ($367.5cm^{2}/gm$, S.D. 397,9) (p=0.05). Conclusion: Supplemental fixation with two axial K-wires can be added to the crescentic PMO to enhance the initial fixation stability to prevent the loss of reduction or dorsal malunion.

  • PDF

Study on prediction for a film success using text mining (텍스트 마이닝을 활용한 영화흥행 예측 연구)

  • Lee, Sanghun;Cho, Jangsik;Kang, Changwan;Choi, Seungbae
    • Journal of the Korean Data and Information Science Society
    • /
    • v.26 no.6
    • /
    • pp.1259-1269
    • /
    • 2015
  • Recently, big data is positioning as a keyword in the academic circles. And usefulness of big data is carried into government, a local public body and enterprise as well as academic circles. Also they are endeavoring to obtain useful information in big data. This research mainly deals with analyses of box office success or failure of films using text mining. For data, it used a portal site 'D' and film review data, grade point average and the number of screens gained from the Korean Film Commission. The purpose of this paper is to propose a model to predict whether a film is success or not using these data. As a result of analysis, the correct classification rate by the prediction model method proposed in this paper is obtained 95.74%.

EXPERIENCE WITH 6 LATISSIMUS DORSI MYOCUTANEOUS FLAPS ON HEAD AND NECK AREA RECONSTRUCTION (두경부 영역의 종양 절세후 광배근피판을 이용한 재건술)

  • Lee, Jong-Ho;Park, Kwang;Seo, Ku-Jong;Park, Ki-Deog
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.14 no.1_2
    • /
    • pp.105-116
    • /
    • 1992
  • Latissimus dorsi myocutaneous flap is useful for the breast reconstruction, chest wall coverage, free flap transfer, and head and neck area reconstruction, especially in large defect. We have had some experience of 5-pedicled and 1-free latissimus dorsi myocutaneous flap in head and neck area and found many advantages and some problems. The conclusions were as follows : 1. Potentially large flap size enabled us agressive tumor resection and reconstruction. 2. Speedy and easy flap elevation and long vascular pedicles reduced operation time and flap failure. 3. Due to fewer complication and functional loss of doner site, pedicled latissimus dorsi flap was a good choice for large head and neck reconstruction. 4. Because of flap bulkness, thin and small defect was not appropriate for reconstruction.

  • PDF

An Evaluation of Shear Strength Parameters$(c,\varphi)$ for Weathering Decomposed Granite Soil (화강풍화토의 전단정수$(c,\varphi)$ 평가)

  • 이문수;이광찬
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.2
    • /
    • pp.181-194
    • /
    • 1999
  • Both the chemical components and the physical and mechanical properties of the compacted and undisturbed weathered granite soils were estimated to investigate the influences of the degree of weathering and saturation on the shear strength. The weathered granite soils used in this study were taken from six different sites in Korea. The results showed that the shear strength of weathered granite soil decreased with increasing the degree of weathering and saturation. Under the normal stresses less that 40kPa, the shape of Mohr-Coulomb failure envelope followed curved or hyperbolic relationship and a half of cohesion value obtained by the common shear test was observed. Using the Sueoka's method, the values of CWI were ranged from 21.5 to 31.26 which can be characterized as a completely weathered granite soil. Large decrease in shear strength and remarkable variation in dilatancy were observed in saturated granite soil compared to unsaturated soil. It was also found that the shear strength of undisturbed weathered granite soil of Pungam site can be expressed approximately by the equation of ${(\tau)_{sat}= 1.0(\tau)_{unsat}-12.48}$ and this equation can be extended to the other sites considered in this study.

  • PDF

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

Optimum design of lead-rubber bearing system with uncertainty parameters

  • Fan, Jian;Long, Xiaohong;Zhang, Yanping
    • Structural Engineering and Mechanics
    • /
    • v.56 no.6
    • /
    • pp.959-982
    • /
    • 2015
  • In this study, a non-stationary random earthquake Clough-Penzien model is used to describe earthquake ground motion. Using stochastic direct integration in combination with an equivalent linear method, a solution is established to describe the non-stationary response of lead-rubber bearing (LRB) system to a stochastic earthquake. Two parameters are used to develop an optimization method for bearing design: the post-yielding stiffness and the normalized yield strength of the isolation bearing. Using the minimization of the maximum energy response level of the upper structure subjected to an earthquake as an objective function, and with the constraints that the bearing failure probability is no more than 5% and the second shape factor of the bearing is less than 5, a calculation method for the two optimal design parameters is presented. In this optimization process, the radial basis function (RBF) response surface was applied, instead of the implicit objective function and constraints, and a sequential quadratic programming (SQP) algorithm was used to solve the optimization problems. By considering the uncertainties of the structural parameters and seismic ground motion input parameters for the optimization of the bearing design, convex set models (such as the interval model and ellipsoidal model) are used to describe the uncertainty parameters. Subsequently, the optimal bearing design parameters were expanded at their median values into first-order Taylor series expansions, and then, the Lagrange multipliers method was used to determine the upper and lower boundaries of the parameters. Moreover, using a calculation example, the impacts of site soil parameters, such as input peak ground acceleration, bearing diameter and rubber shore hardness on the optimization parameters, are investigated.

Claim Management during Construction based on Key Claim Management Factors (클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리)

  • Lee, Jun-Hyung;Lee, Hyun-Soo;Park, Moon-Seo;Kim, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.463-468
    • /
    • 2007
  • The disputes in construction projects are very important issue for stakeholders. However, many of presented claims have not received the compensation money required, and frequently turned down. The most cause is that the claims are not managed systemically on construction. Therefore, it is important to identify which management works are conducted on construction and how significantly do they relevant to construction claim. This research derives key claim management factors through analyzing causes for claim success and failure, and then presents management works relevant to them. This research also proposes the method for effective claim management and its expected effect through expert interview.

  • PDF