• Title/Summary/Keyword: facility plan and model

Search Result 175, Processing Time 0.032 seconds

A Study of the Safety Facilities Operation Strategies for Performing Arts Workers Evacuation (공연종사자 피난을 위한 안전시설의 운영전략 연구)

  • Sung-Hak Chung;Yong-Gyu Park
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.1
    • /
    • pp.63-74
    • /
    • 2024
  • The objectives of this study is to classify evacuation types, derive the characteristics of 4 types, develop and discover evacuation routes within the performance hall space, and present the statistical classification results of the evacuation classification model by classification type. To achieve this purpose, the characteristics of each evacuation type's four types are applied through a network reliability analysis method and utilized for institutional improvement and policy. This study applies for the building law, evacuation and relief safety standards when establishing a performance hall safety management plan, and reflects it in safety-related laws, safety standards, and policy systems. Statistical data by evacuation type were analyzed, and measurement characteristics were compared and analyzed by evacuation types. Evaluate the morphological similarity and reliability of evacuation types according to door width and passage length and propose the install position of evacuation guidance sign boards. The results of this study are expected to be used as basic data to provide operation strategies for safety facility evacuation information sign boards according to evacuation route classification types when taking a safety management plan. The operation strategy for the evacuation sign boards installation that integrates employee guidance and safety training is applied to the performance hall safety management plan. It will contribute to establishing an operational strategy for performance space safety when constructing performance facilities in the future.

The Allocation Methods for Economical Efficiency Using an Optimized Model (최적화 모델을 이용한 경제적인 총량관리 할당기법 연구)

  • Choi, In Uk;Shin, Dong Seok;Kim, Hong Tae;Park, Jae Hong;Ahn, Ki Hong;Kim, Yong Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.3
    • /
    • pp.295-303
    • /
    • 2015
  • In Korea, Total Maximum Daily Loads(TMDLs) has been enforced to restore and manage water quality in the watersheds. However, some assesment of implementation plan of TMDLs showed that the achievement of the target water quality is not related to the proper allocation loads because difference of flow duration interval. In the United States, the discharge loads are determined by water quality modeling considering standard flow conditions according to purpose. Therefore, this study tried to develop the allocation method considering economical efficiency using water quality model. For this purpose, several allocation methods being used in the management of TMDLs is investigated and develope an allocation criteria considering regional equality and uniformity. Since WARMF(Watershed Analysis Risk Management Framework) model can simulate the time varying behavior of a system and the various water quality variables, it was selected for a decision support system in this study. This model showed fairly good performance by adequately simulating observed discharge and water quality in Miho watershed. Furthermore, the scenario simulation results showed that the effect of annual average water quality improvement to remove 1kg BOD is more than 25 times, even if point pollutants treatment facility is six times more expensive to operate than non-point pollutants treatment facility.

Energy Use Prediction Model in Digital Twin

  • Wang, Jihwan;Jin, Chengquan;Lee, Yeongchan;Lee, Sanghoon;Hyun, Changtaek
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1256-1263
    • /
    • 2022
  • With the advent of the Fourth Industrial Revolution, the amount of energy used in buildings has been increasing due to changes in the energy use structure caused by the massive spread of information-oriented equipment, climate change and greenhouse gas emissions. For the efficient use of energy, it is necessary to have a plan that can predict and reduce the amount of energy use according to the type of energy source and the use of buildings. To address such issues, this study presents a model embedded in a digital twin that predicts energy use in buildings. The digital twin is a system that can support a solution of urban problems through the process of simulations and analyses based on the data collected via sensors in real-time. To develop the energy use prediction model, energy-related data such as actual room use, power use and gas use were collected. Factors that significantly affect energy use were identified through a correlation analysis and multiple regression analysis based on the collected data. The proof-of-concept prototype was developed with an exhibition facility for performance evaluation and validation. The test results confirm that the error rate of the energy consumption prediction model decreases, and the prediction performance improves as the data is accumulated by comparing the error rates of the model. The energy use prediction model thus predicts future energy use and supports formulating a systematic energy management plan in consideration of characteristics of building spaces such as the purpose and the occupancy time of each room. It is suggested to collect and analyze data from other facilities in the future to develop a general-purpose energy use prediction model.

  • PDF

3D Track Models Generation and Applications Based on LiDAR Data for Railway Route Management (철도노선관리에서의 LIDAR 데이터 기반의 3차원 궤적 모델 생성 및 적용)

  • Yeon, Sang-Ho;Lee, Young-Dae
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1099-1104
    • /
    • 2007
  • The visual implementation of 3-dimensional national environment is focused by the requirement and importance in the fields such as, national development plan, telecommunication facility deployment plan, railway construction, construction engineering, spatial city development, safety and disaster prevention engineering. The currently used DEM system using contour lines, which embodies national geographic information based on the 2-D digital maps and facility information has limitation in implementation in reproducing the 3-D spatial city. Moreover, this method often neglects the altitude of the rail way infrastructure which has narrow width and long length. There it is needed to apply laser measurement technique in the spatial target object to obtain accuracy. Currently, the LiDAR data which combines the laser measurement skill and GPS has been introduced to obtain high resolution accuracy in the altitude measurement. In this paper, we first investigate the LiDAR based researches in advanced foreign countries, then we propose data a generation scheme and an algorithm for the optimal manage and synthesis of railway facility system in our 3-D spatial terrain information. For this object, LiDAR based height data transformed to DEM, and the realtime unification of the vector via digital image mapping and raster via exactness evaluation is transformed to make it possible to trace the model of generated 3-dimensional railway model with long distance for 3D tract model generation.

  • PDF

A Study on Establishment of Social Force Model for Maintaining Social Distance on Multi Use Facility (다중밀집시설의 사회적 거리 유지를 위한 Social Force Model 구축방안)

  • Cho, Woncheol;Ko, ChilJin;Kim, DoGyun;Kim, Chunsu;Yu, ByungYoung;Lee, Seonha
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.4
    • /
    • pp.1-12
    • /
    • 2020
  • In this study, the effect of the social distance maintenance and pedestrian route system was analyzed for Seoul Station, one of the multi use facilities according to the COVID-19 pandemic. For analysis, the Seoul Station pedestrian network was established through the survey of the number of passengers and CAD floor plan. A pedestrian that maintaining Social Distance was implemented using the Social Force Model. Based on this, scenario analysis was proceed. As a result, when the walking line system was installed the average walking speed decreased compared to the current situation. but the average density was analyzed that maintain the walking level of service (LOS)'C', this mean walking line system is effective, and the effect of the walking line system was proved. It can be used as a pedestrian simulation model.

Development of Models for Regional Cardiac Surgery Centers

  • Park, Choon Seon;Park, Nam Hee;Sim, Sung Bo;Yun, Sang Cheol;Ahn, Hye Mi;Kim, Myunghwa;Choi, Ji Suk;Kim, Myo Jeong;Kim, Hyunsu;Chee, Hyun Keun;Oh, Sanggi;Kang, Shinkwang;Lee, Sok-Goo;Shin, Jun Ho;Kim, Keonyeop;Lee, Kun Sei
    • Journal of Chest Surgery
    • /
    • v.49 no.sup1
    • /
    • pp.28-36
    • /
    • 2016
  • Background: This study aimed to develop the models for regional cardiac surgery centers, which take regional characteristics into consideration, as a policy measure that could alleviate the concentration of cardiac surgery in the metropolitan area and enhance the accessibility for patients who reside in the regions. Methods: To develop the models and set standards for the necessary personnel and facilities for the initial management plan, we held workshops, debates, and conference meetings with various experts. Results: After partitioning the plan into two parts (the operational autonomy and the functional comprehensiveness), three models were developed: the 'independent regional cardiac surgery center' model, the 'satellite cardiac surgery center within hospitals' model, and the 'extended cardiac surgery department within hospitals' model. Proposals on personnel and facility management for each of the models were also presented. A regional cardiac surgery center model that could be applied to each treatment area was proposed, which was developed based on the anticipated demand for cardiac surgery. The independent model or the satellite model was proposed for Chungcheong, Jeolla, North Gyeongsang, and South Gyeongsang area, where more than 500 cardiac surgeries are performed annually. The extended model was proposed as most effective for the Gangwon and Jeju area, where more than 200 cardiac surgeries are performed annually. Conclusion: The operation of regional cardiac surgery centers with high caliber professionals and quality resources such as optimal equipment and facility size, should enhance regional healthcare accessibility and the quality of cardiac surgery in South Korea.

A Basic Study for Establishing Standards for Special School Facilities -Focusing on Case Studies and Advice- (특수학교 시설기준 수립을 위한 기초연구 -사례조사 및 자문을 중심으로-)

  • Meang, Joon-Ho;Kim, Sung-Joong;Song, Byung-Joon;Kim, Jae-Young
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.20 no.2
    • /
    • pp.11-21
    • /
    • 2021
  • In order to create future-oriented special school facilities with a high-quality educational environment in response to various changes and demands of the times, it is necessary to break away from the existing uniform and formal framework to find appropriate special school space. This study was a basic research to construct an active detailed model of new and creative educational space that reflects the changes of future society and educational direction. In this study, we proposed a criteria based on case studies and expert advice, deviating away from the limitations and problems that existing special schools' educational space had. The direction of plan was presented based on the compilation of expert consultation and analysis of best practice facility survey across the nation. Based on the results of this study, it is intended to maximize the effectiveness of educational policies in the long term by preparing a specific facility model for the establishment of special school planning standards.

A Study on Utilizing BIM Level of Architectural Design Information for School Facilities (BIM을 활용한 학교시설 설계정보단계 설정에 관한 연구)

  • Kim, Myoung-Keun;Koh, In-Lyong;Kim, Hyung-Un
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.13-20
    • /
    • 2012
  • The recent advances in digital technology allow the use of BIM for integratively managing various information pertaining to an architectural structure. This can be the suitable tool for effectively utilizing the various requests of both the users and the administrators from the planning phase. In particular, planning and constructing a school facility can be challenging because it is an important learning facility where the students are required follow a set schedule. Accommodating to the various needs and requests of the users and the other related parties in the progress can be very difficult. Therefore, in order to use the BIM with the basis of data to manage the lifetime of the school facility, it is necessary to develop the specialized BIM process customized to the school facilities. Using this as the base, the BIM process specifically for school facilities should be phased in, applied, and expanded. The objective of this study is to define the scope of application and to plan for the efficient utilization of the BIM process specialized for school facilities, when conducting the project from planning phase to design development phase through the series of processes. Unlike the presently used enhancement of the visible minute details of the models, the methods to enhance the quality of information contained inside the model will be proposed. Also, the user will participate in the school facility construction. The realistic BIM application is aimed through the research for the processes for building models that will be utilized for construction and management.

Study on Establishing Investment Mathematical Models for Each Application ESS Optimal Capacity in Nationwide Perspective (국가적 관점에서 각 용도별 ESS 적정용량 산정을 위한 투자수리모델 수립에 관한 연구)

  • Kim, Jung-Hoon;Youn, Seok-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.979-986
    • /
    • 2016
  • At present, electric power industry around the world are being gradually changed to a new paradigm, such as electrical energy storage system, the wireless power transmission. Demand for ESS, the core technology of the new paradigm, has been growing worldwide. However, it is essential to estimate the optimal capacity of ESS facilities for frequency regulation because the benefit would be saturated in accordance with the investment moment and the increase of total invested capacity of ESS facilities. Hence, in this paper, the annual optimal mathematical investment model is proposed to estimate the optimal capacity and to establish investment plan of ESS facility for frequency regulation. The optimal mathematical investment model is newly established for each season, because the construction period is short and the operation effect for the load by seasons is different unlike previous the mathematical investment model. Additionally, the marginal operating cost is found by new mathematical operation model considering no-load cost and start-up cost as step functions improving the previous mathematical operation model. ESS optimal capacity is established by use value in use iterative methods. In this case, ESS facilities cost is used in terms of the value of the beginning of the year.

Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.