• 제목/요약/키워드: express highway

Search Result 62, Processing Time 0.023 seconds

Ground Water Resources of Kum-Ho River Basin (금호강유역 지하수자원)

  • 한정상
    • Journal of the Korean Professional Engineers Association
    • /
    • v.10 no.2
    • /
    • pp.13-26
    • /
    • 1977
  • The Kum-Ho river basin is one of the densely populated area having more than 35% of the total population and it was also well irrigated since ealier days in the Nackdong River Basin Most of the easily developed source of surface water are fully utilized, and at this moment the basin is at the stage that no more surface water can be made available under the present rapid development of economic condition. Since surface water supplies from the basin have become more difficult to obtain, the ground water resources must be thoroughly investigated and utilized greatly hereafter. In economic ground of the basin what part could ground water play\ulcorner In what quantities and, for what uses could it be put\ulcorner The answer to these questions can be relatively simple; the ground water resources in the basin can be put at almost any desired use and almost anywhere in the basin. The area of the basin is at about 2088km$^2$ in the middle part of Nackdong River Basin and it is located along the Seoul-Pusan Express Highway. The mean annual rainfall is about 974.7m/m, most of which falls from June to September during the monsoon. Accumulated wet period is appeared approximately after every 8 year's accumulated dry-period with the duration of 5 years. The water bearing formations in the basin include unconsolidated alluvial deposits in Age of Quatenary, saprolite derived from weathered crystalline rocks, Kyongsang sedimentary formations of the period from late Jurassic to Cretaceouse, and igneouse rocks ranging of the Age from Mesozoic to Cenozoic. The most productive ground water reservoir in the basin is calcareouse shale and sandstones of Kyongsan system, which occupies about 66% of the total area.

  • PDF

A study on the road Kill about the wild animals protective system for a prevent (로드킬 예방을 위한 야생동물보호 시스템에 관한 연구)

  • Jeong, Yang-Kwon;Choi, Jae-Ho;Choi, Seok-Won
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.5 no.6
    • /
    • pp.575-580
    • /
    • 2010
  • The research which sees the wild animals back with the system for the penetration prevention, when the wild animals approaches with the infrared ray sensor which composes a proposed system to use radiation department and the solar heat which occur and to make lead in the spiral which informs a guard to application of power department and back the edge where uses the battery of the application of power department which supplies all the member and the outside minute electric current to do in order to maximize a warning utterance or a luminous effect, an utterance department and the light for a prevention and about the system which restrains the wild animals is a thing. The proposed system which sees the express highway and the national road, with region degree establishes back the same wild animals appears and disappears frequently a day and night and between in circumference and goes without question appears and disappears the penetration of the wild animals which prevents and the animal the vehicle and prevents the damage which collides, joins in and driver and is the ecosystem of natural environment protects preserves.

A Study on the Making of the Noise Map for Traffic Noise Level (도로교통 소음지도 작성에 관한 연구)

  • Park, Sang-Ill;Choi, Hyung-Il;Cheong, Kyung-Hoon;Yeom, Dong-Ick;Jin, Chang-Beom
    • Journal of Environmental Science International
    • /
    • v.16 no.12
    • /
    • pp.1393-1399
    • /
    • 2007
  • This research helps you understand the road traffic noise levels by using a noise map. We have observed the change of the road traffic noise levels around $07:00{\sim}08:30\;and\;22:00{\sim}23:00$ using the noise map in the city. The road traffic noise level is very high both at noon and at night around a beltway and an interchange that is linked with a highway. It seems that the main route of so many vehicles, which are at neighboring cities such as N city and D and H districts and which avoid traffic jams in the city, is the beltway and interchange. The road traffic noise level of a nearby express bus terminal, railroad station, and airport is more than 75 dB at noon and 65 dB at night. The road traffic noise level of G city at night is observed to be more than 55 dB. The noise levels of a residence area and a university are higher than a road with high noise levels when the commuters drive to work. The end of the day exceeds 11 o'clock because of a culture level of development that arouses spare time, eating out, adults' drinking culture, nightlife of the youth, etc. Therefore, the road traffic noise level is high during late night hours, and it exceeds regulatory guidelines(55 dB(A)). It also damages the residence area that is located near the road.

Analysis of Slope Stability with Consideration of the Wetting Front and Groundwater Level During Rainfall (강우시 습윤전선 및 지하수위를 고려한 사면의 안정성 해석)

  • Song, Young-Suk;Hong, Won-Pyo
    • The Journal of Engineering Geology
    • /
    • v.21 no.1
    • /
    • pp.25-34
    • /
    • 2011
  • We applied a slope-stability analysis method, considering infiltration by rainfall, to the construction site where an express highway is being extended. Slope stability analysis that considers infiltration by rainfall can be classified into three methods: a method that considers the downward velocity of the wetting front, a method that considers the upward velocity of the groundwater level, and a method that considers both of these factors. The results of slope stability analysis using $Bishop^{\circ}{\Phi}s$ simplified method indicate that the safety factor due to the downward velocity of the wetting front decreases more rapidly than that due to the upward velocity of the groundwater level. For the third of the above methods, the safety factor decreases more rapidly than for the other two methods. Therefore, slope stability during rainfall should be analyzed with consideration of both the downward velocity of the wetting front and the upward velocity of the groundwater level.

Groundwater Resources of Gum-Ho River Basin (금호강유역(琴湖江流域) 지하수대(地下水帶)에 관한 연구(硏究))

  • Han, Jeong Sang
    • Economic and Environmental Geology
    • /
    • v.11 no.3
    • /
    • pp.99-108
    • /
    • 1978
  • The Gum-Ho river basin is one of the densely populated area having more than 35% of the total population and it was also well irrigated since earlier days in the Nackdong river basin. Most of the easily developed source of surface water are fully utilized, and at this moment the basin is at the stage that no more :surface water can be made available under the present rapid development of economic condition. Since surface water supplies from the basin have become more difficult to obtain, the ground water resources must be thoroughly investigated and utilized greatly hereafter. In economic ground of the basin what part could ground water play? In what quantities and, for what uses could it be put? The answer to these questions can be relatively simple;the ground water resources in the basin can be put at almost any desired use and almost anywhere in the basin The area of the basin is at about $2088km^2$ in the middle part of Nackdong river basin and it is located along the Seoul-Pusan express highway. The mean annual rainfall is about 974.7mm, most of which falls from June to September during the monsoon. Accumulated is appeared approximately after every 8 year's accumlated dry period with the duration of 5 years. The water bearing formation in the basin include unconsolidated alluvial deposits in Age of Quaternary, saprolite derived from weathered crystalline rocks, Gyongsang sedimentary formations of the period from late Jurassic to Cretaceouse, and igneouse rocks ranging of the Age from Mesozoic to Cenozoic. The most productive ground water reservoir in the basin is calcareous shale and sandstones of Gyongsang system, which occupies about 66% of the total area. The results of aquifer test on Gyongsang sedimentary formation show that average pumping capacity of a well drilled into the formation with drilling diameter and average depth of $8{\frac{1}{2}}$ inch and 136m is $738m^3/day$ and also average specific capacity of those well is estimated $77.8m^3/D/M$. Total amount of the ground water reserved in the basin is approximately estimated at 37 billion metric tons, being equivalent 18 years total precipitations, among which 7 billion metric tons of portable ground water can be easily utilized in depth of 200 meters.

  • PDF

A Study on the Improvement Methods on Cabin Safety Actions in Aircraft Accidents -Focused on Cabin Crew Safety Performances & Passenger Perceptions of Cabin Safety Information - (항공기 비상사태에 대한 객실안전조치에 관한 연구 -객실승무원의 안전업무와 승객의 객실안전정보 인식을 중심으로-)

  • Yoo, Kyung-In;Yoo, Kwang-Eui;Lee, Chun-Ki
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.21 no.4
    • /
    • pp.126-136
    • /
    • 2013
  • Aircraft accidents these days, following the mega sizing trend of the aircraft, result in enormous losses of human lives apart from those of property, which cannot be replaced by any means. As most recently, in April 20, 2012, a Boeing 737 passenger plane departed Karachi on an augural flight to Islamabad, Pakistan, crashed close to an express highway on final approach, all 121 passengers and 6 crew members were killed. As such a large number of fatalities have been recorded in aircraft accidents while accident investigation results show that more than 95% of aircraft accidents are now survivable. There are three basic stages in surviving the aircraft accident: surviving the crash impact, the evacuation process and the hostile post evacuation environmental elements. These stages require the cabin crew's expeditious and appropriate actions on the basis of systematic and thorough cabin safety training in order to increase occupants' survivability, along with the passengers' preparedness. In this aspect, this paper examines the issues acting as the impediments to the passenger survival in inflight emergency situations, that are the deficiencies with cabin crew safety training, related performances and the shortcomings in passengers' knowledge on inflight safety information, leading to their inappropriate responses to emergency situations. These issues are analyzed and the root causes are identified, suggesting the resolving countermeasures.

An Analysis on the Users' behavior of the Parking Area for the handicapped (장애인전용주차구역제도의 이용행위 분석)

  • Yang, Sook-Mee;Kim, Man-Ki
    • Journal of Digital Convergence
    • /
    • v.9 no.5
    • /
    • pp.55-63
    • /
    • 2011
  • The purpose of this study is analyzes the violate behavior the Parking Area for the handicapped and monitor the management problem, therefore presents the improvement alternatives of it. We use the field interview survey method by visiting the government office of cities of 16, commercial facility, housings, medical centers, cultural and sports facilities, express highway rest area. We visited the 50 places and interviewed the 227 violating persons. As a result, violate behavior is divided into the not attachment of sticker on parking possibility and not accompaniment with walking disabled person. We presented the improvement alternatives for the lawful usage of the parking area for the handicapped. First, We have to magnify a recognition and a advertisement about the parking area for the handicapped. Second, We have to improve a management of expense, manpower and civil complains, etc. We have to prepare the legal revision which strengthens the concrete punishment for a violate behavior improvement.

A Study on the standardization of ETCS (Focused on RF) (자동요금징수시스템(ETCS) 표준화 연구(주파수방식을 중심으로))

  • Kwon, Han-Joon;Lee, Ki-Hyun;Kim, Yong-Deak
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.3
    • /
    • pp.62-73
    • /
    • 2008
  • In this paper, domestic standard revision plan of dynamic frequency method which is used both in unmanned automatic toll collection system and manned collection system of the express highway is presented. For such ETCS, the infrared rays (870 nm) of active frequency method and the frequency integrated method (5.8 GHz) are adopted and extended to be operated to the all around the Toll Gate. This standardization plan is based on inter connection reference model between OSI (Open System Interconnection) in process of ITS short range radio communication standardization of 5.8 GHz bandwidth to support traffic information and control system service, and the derived revision plan by starting from physical layer which support interoperability for multiple access between RSE (Road Side Equipment) and OBE (On Board Equipment), in which is categorized into physical layer, data link layer, and application layer. In case of radiation power, existing standard is divided by class1 (within 10 m) and Class2 (within 100 m) according to transmission lengthwhile it is operated with just single standard 'Class1' because of notification of Ministry of Information and Communication in 2004. In the case of the limitation value of incident power in communication area, considering operation plan of ETCS that is on actuality operation the measurements are reflected to the standard. In other wort this paper proposed the improvement standard of incident power, pseudo response in the communication area and radiated power in order to secure stability and compatibility among operator systems about the needed part on ETCS operation.

  • PDF

A Case Study on the Analysis of Cause and Characteristics of a Landslide at the Sedimentary Rock Area (퇴적암 지역에서의 산사태 원인 및 특성 분석에 대한 사례연구)

  • Song, Young-Suk;Hong, Won-Pyo
    • The Journal of Engineering Geology
    • /
    • v.17 no.1 s.50
    • /
    • pp.101-113
    • /
    • 2007
  • A landslide was occurred due to soil cutting for construction to expand the Donghae express highway in Dong-hae-City, Korea. The total area of the landslide was about $9,550m^2$ with 100 m of width and 87m of height. The landslide was occurred due to the internal factor of the unstable geological structure including the clay layer and the external factor of continuous heavy rainfalls. As the result of field instrumentation during the landslide, the horizontal displacement of the slope ground increases with increasing the accumulated rainfall by continuous rainfall during the rainy season. Also, the depth of sliding failure was decided by the horizontal displacement distribution during landslide occurrence. It makes sure that the horizontal displacement starts from the depth of sliding failure and the depth of sliding failure matches well with the location of the clay layer. As the slope stability analysis using Bishop's Simplified Method at the landslide area, the safety factor of slope during the rainy season was 0.53. This safety factor of slope was enough to trigger the landslide at this area. The depth of sliding failure obtained by analytical method matches well with the depth of the clay layer.

Hydrothermal Alteration and Engineering Characteristics in the Bokan Tunnel Area passing through the Yangsan Fault (양산단층을 통과하는 복안터널구간의 열수변질작용과 공학적 특성)

  • Lee, Chang-Sup;Lee, Hyo-Min
    • Journal of the Mineralogical Society of Korea
    • /
    • v.22 no.1
    • /
    • pp.13-22
    • /
    • 2009
  • The study area is a tunnelling section passing through the Yangsan Fault zone. Kyungbu express highway and national road 35 are located above the tunnel. Previous study showed that fault gouge and fault breccia were widely distributed in the tunnelling section with a maximum width of 100 m. From the present study, it is found that sedimentary rocks consisting mainly of shale are distributed at the eastern block of the Yangsan Fault and these rocks are not subject to mechanical fracturing and hydrothermal alteration. On the other hand, dacitic tuff distributed at the western block of the Yangsan Fault is largely affected by mechanical fracturing and hydrothermal alteration. The large fault zone of $50{\sim}130m$ width was formed by complex processes of mechanical fracturing and hydrothermal alterations such as chloritization, sericitization, and kaolinization. Based on the characteristics of mechanical fracturing and hydrothermal alterations, the Yangsan fault zone in the study area is geotechnically classified as four zones: unaltered zone, altered zone, altered fractured zone, and fault gouge zone. These zones show different degrees and aspects in mechanical fracturing and hydrothermal alterations, resulting in different engineering properties.