• 제목/요약/키워드: expected cost rate per unit time

검색결과 51건 처리시간 0.021초

교체-수리보증이 종료된 이후의 예방보전정책 (Preventive maintenance policy following the expiration of replacement-repair warranty)

  • 정기문
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제12권2호
    • /
    • pp.57-66
    • /
    • 2012
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of replacement-repair warranty. Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Replacement Model Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil;Lim, Jae-Hak
    • Journal of the Korean Data and Information Science Society
    • /
    • 제14권4호
    • /
    • pp.889-901
    • /
    • 2003
  • In this paper, we consider the optimal replacement policies following the expiration of the combination warranty. The combination warranty can be divided into the renewing combination warranty and the non-renewing combination warranty. The criterion used to determine the optimal replacement period is the overall value function based on the expected cost and the expected downtime. Thus, we obtain the expected cost rate per unit time and the expected downtime per unit time for our model. And then the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF

개선지수를 고려한 주기적 예방보전의 최적화에 관한 연구 (Optimal Periodic Preventive Maintenance with Improvement Factor)

  • Jae-Hak Lim
    • 품질경영학회지
    • /
    • 제31권3호
    • /
    • pp.193-204
    • /
    • 2003
  • In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate but remains the pattern of hazard rate unchanged. And the system undergoes only minimal repairs at failures between PM's. The expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

Optimal replacement strategy under repair warranty with age-dependent minimal repair cost

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • 제12권2호
    • /
    • pp.117-122
    • /
    • 2011
  • In this paper, we suggest the optimal replacement policy following the expiration of repair warranty when the cost of minimal repair depends on the age of system. To do so, we first explain the replacement model under repair warranty. And then the optimal replacement policy following the expiration of repair warranty is discussed from the user's point of view. The criterion used to determine the optimality of the replacement model is the expected cost rate per unit time, which is obtained from the expected cycle length and the expected total cost for our replacement model. The numerical examples are given for illustrative purpose.

  • PDF

주기적 예방보전의 최적정책에 관한 연구

  • 나명환;손영숙;김문주
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2005년도 학술발표대회 논문집
    • /
    • pp.115-120
    • /
    • 2005
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal period time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost rate per unit time. Finally, it suppose that the failure time of a system has a Weibull distribution as an example and we obtain an expected cost rate per unit time the optimal period time and the number when cost of replacement and cost of minimal repair change.

  • PDF

유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책 (Optimal replacement policy following the expiration of payable RRNMW)

  • 정기문
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제11권4호
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.

연장된 이단계 보증 이후의 교체모형 (Replacement Model after Extended Two-phase Warranty)

  • 정기문
    • 통합자연과학논문집
    • /
    • 제14권4호
    • /
    • pp.197-204
    • /
    • 2021
  • Under the two-phase warranty, the warranty period is divided into two intervals, one of which is for renewing replacement warranty, and the other is for minimal repair warranty. Jung[13] discusses the two types of extended two-phase warranty models. In this paper, we suggest the replacement model after the extended two-phase warranty that has been proposed by Jung[13]. To determine the optimal replacement policy, we adopt the expected cost rate per unit time. So, the expressions for the total expected cost, the expected length of the cycle and the expected cost rate per unit time from the user's point of view are derived. Also, we discuss the optimal replacement policy and the uniqueness of the solution for the optimization. Furthermore, the numerical examples are provided to illustrate the proposed the replacement model.

교체-수리보증 하에서 연장된 보증이 종료된 이후의 예방보전정책 (Preventive Maintenance Policy Following the Expiration of Extended Warranty Under Replacement-Repair Warranty)

  • 정기문
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제14권2호
    • /
    • pp.122-128
    • /
    • 2014
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of extended warranty under replacement-repair warranty. Under the replacement-repair warranty, the failed system is replaced or minimally repaired by the manufacturer at no cost to the user. Also, under extended warranty, the failed system is minimally repaired by the manufacturer at no cost to the user during the original extended warranty period. As a criterion of the optimality, we utilize the expected cost rate per unit time during the life cycle from the user's perspective. And then we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

예방보전이 불완전할 때 최적 주기적 예방보전 계획 (Optimal Periodic Preventive Maintenance Schedule When Preventive Maintenance is Imperfect)

  • 김대경;신상욱;임재학
    • 품질경영학회지
    • /
    • 제35권4호
    • /
    • pp.140-146
    • /
    • 2007
  • In this paper, we consider a periodic imperfect preventive maintenance(PM) policy in which the system's failure rate after each PM remains unchanged. The system undergoes only minimal repairs at failures between PMs. Exact mathematical formula of the expected cost rate per unit time is derived. Optimal number of PMs and optimal maintenance period are derived by minimizing the expected cost rate per unit time. A numerical example is provided to illustrate the proposed approach under Weibull lifetime distribution.

연장된 보증을 갖는 예방보전모형 (Preventive maintenance model with extended warranty)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제24권4호
    • /
    • pp.773-781
    • /
    • 2013
  • 최근에 기본 보증이 종료된 이후에 주어지는 시스템의 연장된 보증에 대한 관심이 증가되고 있다. 따라서 본 논문에서는 사용자 측면에서 최소수리보증이 있는 연장된 보증이 종료된 이후의 예방보전모형을 제안하였다. 이 때, 기본 보증과 연장된 보증 하에서 고장이 발생된 시스템에는 판매자에 의해서 무료로 최소수리가 이루어진다. 이러한 제안된 예방보전모형에 대하여 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 유도하였다. 또한, 유도된 단위시간당 기대비용을 최소화 하는 최적의 예방보전 주기와 예방보전 횟수를 결정하였다. 끝으로 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 이를 설명하였다.