• Title/Summary/Keyword: estimate cost

Search Result 1,644, Processing Time 0.026 seconds

Probability-based Cost Analysis for Recycling Secondary Products from Construction Waste (건설폐기물 재활용 2차 제품에 대한 확률모델 기반 비용분석)

  • Kwon, Kihyon;Kim, Do-Gyeum;Lee, Ho-Jae;Seo, Eun-Ah
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.2
    • /
    • pp.227-234
    • /
    • 2020
  • Under consideration of construction waste recycling, candidate secondary products applicable for the civil and construction areas can be reliably employed based on the recycling cost analysis. For the validation purpose, probability-based cost analyses were performed to estimate recycling cost profit considering uncertainties. When recycling construction wastes, the costs at each stage are fully dependent on target products to be adopted. To achieve commercialization of each product, its quality has to be improved with economic efficiency through accurate evaluation of input costs. Based on the probabilistic recycling cost analysis, the cost benefit for target products was estimated with waste classification cost, transportation cost to recycling treatment facilities and production cost. All necessary information on the cost analysis were collected from literature, disclosure, and existing recycling companies. In addition, a cost difference between recycled and non-recycled events was made. As a result, a probability-based recycling cost estimate for candidate secondary products was herein presented.

Applying System Dynamics Model to Estimate the Effects of Healthy City Policies on Reducing Social Cost (시스템다이내믹스 기법을 이용한 건강도시화 정책의 사회적비용 절감효과 분석)

  • Kim, Eun Jung;Kim, Young-Pyo
    • Korean System Dynamics Review
    • /
    • v.13 no.3
    • /
    • pp.23-46
    • /
    • 2012
  • The purpose of this paper is to estimate effects of healthy city policies on reducing social costs. The analyses were dune at the cities, counties, and communities levels in 2009, and covered Seoul Metropolitan Area(SMA). For estimation of reducing social costs, it developed a system dynamics(SD) model that analyzed causal relationships between physical inactivity rates, the number of deaths, medical expenses, and total social costs. Simulation period of SD was from 2009 to 2030. Three alternatives were proposed with combinations of length of bike lanes, number of bus routes, crime rates, self-reported good health status rates, and obesity rates. The total estimated cost of physical inactivities from 2009 to 2030 was 31.9 trillion won from the future forecast without policies. As a result of simulations with three alternatives, there were economic benefit approximately from 119.7 billion won to 1.16 trillion won. This study contributed to better understanding the economic benefits of healthy cities that were associated with design of built environment and physical activity. It also emphasized the importance of healthy cities planning as one of national welfare polices.

  • PDF

Autopilot Design for a Target Drone using Rate Gyros and GPS

  • Rhee, Ihnseok;Cho, Sangook;Park, Sanghyuk;Choi, Keeyoung
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.13 no.4
    • /
    • pp.468-473
    • /
    • 2012
  • Cost is an important aspect in designing a target drone, however the poor performance of low cost IMU, GPS, and microcontrollers prevents the use of complex algorithms, such as ARS, or INS/GPS to estimate attitude angles. We propose an autopilot which uses rate gyro and GPS only for a target drone to follow a prescribed path for anti-aircraft training. The autopilot consists of an altitude hold, roll hold, and path following controller. The altitude hold controller uses vertical speed output from a GPS to improve phugoid damping. The roll hold controller feeds back yaw rate after filtering the dutch roll oscillation to estimate the roll angle. The path following controller operates as an outer loop of the altitude and roll hold controllers. A 6-DOF simulation showed that the proposed autopilot guides the target drone to follow a prescribed path well from the view point of anti-aircraft gun training.

Performance of Signal Detection for T-DMB System in Multipath Environments (다중 경로 T-DMB 환경에서의 신호검출 성능 분석 연구)

  • Kim, Seung Jong;Park, Young Sik;Kim, Jin Young
    • Journal of Satellite, Information and Communications
    • /
    • v.9 no.1
    • /
    • pp.28-32
    • /
    • 2014
  • In this paper, we analyzed performance of signal detection for terrestrial digital multimedia broadcasting (T-DMB) system in various channel environments that applied gaussian, Rayleigh and COST 207 environments that estimate response of real channel state. In order to detect the signal, a signal detection scheme based on energy detection is employed. We generated T-DMB signals so that estimate properly simulation result. For evaluating the signal detection performance, detection probability is derived. We consider two kinds of detection segment, which are three segments and five segments. And we compare the system performances in accordance with the detection segment. From simulation results, it is confirmed that the performance of signal detection is raised as increase the number of segments. The result of this paper can be applied to implement signal detection of broadcasting system.

Evaluation Method of Technical Review in Software Development Process (소프트웨어 개발과정의 기술 리뷰 평가 방법)

  • Jeon, Heui-bae;Yang, Hae-Sool
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.5
    • /
    • pp.1234-1241
    • /
    • 2008
  • Cost effectiveness is greatly related with the degree of reducing the testing cost by the technical reviews. In this paper, we present a new metric My for evaluating the cost effectiveness of technical reviews during software development. First, we estimate and compare My with conventional measure using data collected during practical software development procedure, then we show the validity and usefulness of the proposed measure My. Also by formulating the relationship between the data collected during the reviews and the test, we present a method to estimate the value of the metric My using only the data collected during review phase.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Bearing/Range Estimation Method using NLS Cost Function in IDRS System (IDRS 시스템에서 Curve Fitting이 적용된 NLS 비용함수를 이용한 방위/거리 추정 기법)

  • Jung, Tae-Jin;Kim, Dae-Kyung;Kwon, Bum-Soo;Yoon, Kyung-Sik;Lee, Kyun-Kyung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.4
    • /
    • pp.590-597
    • /
    • 2011
  • The IDRS provides detection, classification and bearing/range estimation by performing wavefront curvature analysis on an intercepted active transmission from target. Especially, a estimate of the target bearing/range that significantly affects the optimal operation of own submarine is required. Target bearing/range can be estimated by wavefront curvature ranging which use the difference of time arrival at sensors. But estimation ambiguity occur in bearing/range estimation due to a number of peaks caused by high center frequency and limited bandwidth of the intercepted active transmission and distortion caused by noise. As a result the bearing/range estimation performance is degraded. To estimate target bearing/range correctly, bearing/range estimation method that eliminate estimation ambiguity is required. In this paper, therefore, for wavefront curvature ranging, NLS cost function with curve fitting method is proposed, which provide robust bearing/range estimation performance by eliminating estimation ambiguity. Through simulation the performance of the proposed bearing/range estimation methods are verified.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

A Computerized Construction Cost Estimating Method based on the Actual Cost Data (실적 공사비에 의한 예정공사비 산정 전산화 방안)

  • Chun Jae-Youl;Cho Jae-ho;Park Sang-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.90-97
    • /
    • 2001
  • The paper considers non-deterministic methods of analysing the risk exposure in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The Monte Carlo method is popular method for incorporating uncertainty relative to parameter values in risk assessment modelling. Non-deterministic methods, they are here presented as possibly effective foundation on which to risk management in cost estimating. The objectives of this research is to develop a computerized algorithms to forecast the probabilistic total construction cost and the elemental work cost at the planning stage.

  • PDF