• Title/Summary/Keyword: estimate cost

Search Result 1,644, Processing Time 0.452 seconds

Product Cost Estimation using Integrated BOM in PDM (PDM 환경에서 통합BOM을 사용한 제품원가추정)

  • 백종건;임석철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.50
    • /
    • pp.231-241
    • /
    • 1999
  • Recent market competition forces the price to be determined in the design stage so that the design would meet the target price of the product. However, most commercial PDM(Product Data Management) systems currently in use lack such a cost estimation function. In this paper, we propose detailed structure and functions of a new approach to estimate the cost of new products using integrated BOM in PDM. Such system will reduce the total life cycle cost of the products to be designed.

  • PDF

A Cost Evaluation Model for Workflow Instances based on Standard Cost Accounting (표준원가회계방식을 적용한 워크플로우 인스턴스의 비용 평가 모형)

  • Lee, Jae-Hun;Jang, Jung-Sun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.460-463
    • /
    • 2008
  • This study tries to apply standard cost accounting model to evaluate the cost of workflow instances. Previous studies mainly focus on matching workflow activities into the elements of Activity based costing in order to assign cost drivers, but rarely examine how to evaluate their instance cost. In this study, we estimate unrealized standard cost from workflow model, and realized cost from accomplished instances. On running, workflow engine cumulates cost of finished activities and it enables to monitor the difference between the target cost and the actual cost dynamically at each step of workflow processes. We implemented a prototype which shows that the proposed work can evaluate effectively the cost of various workflow patterns.

  • PDF

Cost Estimation System for Design Evalution (설계평가를 위한 제조비용산정 시스템)

  • 박홍석;이규봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.281-284
    • /
    • 2000
  • For estimation manufacturing cost during the early design stage, desingers have to know compositon of manufacturmg cost. Manufacturing cost is summalion of material cost and processmg cost. To be able to control the manufacturmg cost, it is necessary to estimate the costs adequately and to store the cost data in a generic way. a generic system, which is the basis for the control of the production costs, takes into account geometric information, material information, process information and production planning information Manufacturing cost is summation of material cost and processing cost.

  • PDF

Suggestion of Allocation Methodology of Environmental Pollution Cost on Multi - Product (복합생산품에 대한 환경오염비용 배분 방법론)

  • Kim, Deok-Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.5
    • /
    • pp.311-318
    • /
    • 2009
  • In previous study, a new allocation methodology of common cost on multi-product have been suggested. The aim of this study is to suggest the methodology that allocates an environment pollution cost including carbon emission cost to each cost of multi-product. For this study, a supposed multi-energy system composed of twenty kinds of systems was made. The multi-energy system produces eighteen kinds of outputs that are electricity, steam, hot water, chilled water, ice, warm air, and cooling air from seven kinds of energy source that are LNG, coil, geothermal energy, sun heat, hydrogen, bio-mass, and waste. The new methodology was applied to the multi-energy system in order to allocate the environment pollution cost to each production cost, and twenty seven equations were induced. From this result, it is concluded that this methodology can estimate each unit cost and allocate each cost flow in any product of any energy system.

A Study on the Non-Insurance Cost due to the Industrial Accident - On the focus of the Ulsan area cooperation - (산업재해로 인한 비보험비용에 관한 연구 - 울산지역의 중소기업을 대상으로 -)

  • 고성석;이태영
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.2
    • /
    • pp.103-109
    • /
    • 2001
  • When workers get accidents in doing their works, industrial accident insurance covers the compensation for the accidents. Generally, this kind of costs is applied in terms of Direct Cost. In our society circumstance to terminate the accident, many kinds of cost (Non-Insurance Cost) are also discharged. Non-Insurance Cost resulted from additional compensation for insurance allowance, is the important basic data source to estimate Loss Cost. Several studies have been done for the output of accident cost, but companies have difficult to apply these studies into practice and generalize the amount of accident loss cost. This study means to suggest improving solutions for the output of Accident Loss Cost and to reduce Opportunity Cost caused by Industrial Accident.

  • PDF

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.

A Study on Proper Acquisition Cost Estimation Using the PRICE Model (PRICE모델을 이용한 적정 획득비용 추정 방안)

  • 한현진;강성진
    • Journal of the military operations research society of Korea
    • /
    • v.27 no.1
    • /
    • pp.10-27
    • /
    • 2001
  • This paper deals with the application of PRICE model in estimating the proper acquisition cost for weapon budgeting phase. The PRICE(Parametric Review of Information for Costing and Evaluation) Hardware model is a computerized method for deriving cost estimates of electronic and mechanical hardware assemblies and systems. The model can be used in obtaining not only initial cost estimates in conceptual phase, but also detailed cost estimates in budgeting phase depending on available historical and empirical data. We analyzed first step cost estimate parameters and derived cost equations using PRICe output dta. Using weight and complexity, We can find cost variation. Sensitivity analysis shows that cost increases exponentially as complexity increases exponentially as complexity increases. We estimated KAAV\`s (Korea Amphibious Assault Vehicle) production cost using the PRICE model and compare with engineering cost estimates which is based on actual production data submitted by the production company. The result shows that tow estimates are close within $\pm2%$ differences.

  • PDF

Estimation of Psychiatric Nursing Costs by Using the Resource-Based Relative Value Scale(RBRVS) (자원기준 상대가치를 이용한 정신과의 간호활동비용 산정)

  • Kim, Eun-Kyung;Kwon, Young-Dae;Kim, Yoon
    • Journal of Korean Academy of Nursing
    • /
    • v.30 no.6
    • /
    • pp.1580-1591
    • /
    • 2000
  • This study was conducted to assess the amount of nursing services for psychiatric inpatients and to estimate psychiatric nursing costs by using the RBRVS. Full details of medical services, including physician and nursing services, for psychiatric inpatients were surveyed and data of general characteristics of hospitals and patients were also collected. The cost of nursing activities was estimated by the multiple conversion factor which was drawn from the Korean RBRVS Development Project to the RBRVS score of each nursing activities, which was drawn from the results of Korean Nurses Association (KNA)'s projects about nursing RBRVS development and cost of nursing activities. The data about 89 inpatients from 3 general hospitals with psychiatric departments were analyzed. The total cost of nursing activities for each patient per admission day was from KRW 22,185 to KRW 27,954 by hospital, and KRW 25,220 in average. The percent of nursing cost to the total cost of medical services was from 36% to 48% by characteristics of patients and 41.4% in average. The cost of nursing activities estimated in this study was between the existing NHI fee schedule and the one suggested by KNA. It is considered as appropriate and acceptable level compared to the total amount of medical services. In the process of KNA's activities to get nursing fee in NHI fee schedule, results of additional studies to estimate the cost of nursing activities balanced with total cost of medical services in every departments should be found and utilized.

  • PDF

Estimation of Production and Operation Cost of KSLV-II using TRANSCOST (TRANSCOST를 이용한 한국형발사체의 생산 및 운용 비용 추정)

  • Yoo, Dong-Seo;Kim, Hong-Rae;Choi, Jong-Kwon;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.39 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • The development of space launch vehicle is an important step to advance to developed countries in the space area. It is also so risky due to necessity of huge costs and longer development period. The accuracy of cost estimation is important to develop a space launch vehicle successfully and efficiently. It is also necessary to estimate production and operation cost in order to develop commercial space launch vehicle possessing competitiveness. In this paper, Korean factors to be able to reflect the current state of workforce, average working hours and technology readiness level in Korea were analyzed to estimate production and operation cost of space launch vehicles that are developed in Korea. Korean factors have been applied to production and operation cost estimation of KSLV-II based on TRANSCOST. We evaluated the competitiveness level of KSLV-II as the commercial launch vehicle in the commercial launch services market by comparing with cost per flight of foreign launch vehicles.