Browse > Article
http://dx.doi.org/10.5139/JKSAS.2011.39.6.567

Estimation of Production and Operation Cost of KSLV-II using TRANSCOST  

Yoo, Dong-Seo (한국항공대학교 항공우주 및 기계공학과)
Kim, Hong-Rae (한국항공대학교 항공우주 및 기계공학과)
Choi, Jong-Kwon (한국항공대학교 항공우주 및 기계공학과)
Chang, Young-Keun (한국항공대학교 항공우주 및 기계공학부)
Publication Information
Journal of the Korean Society for Aeronautical & Space Sciences / v.39, no.6, 2011 , pp. 567-575 More about this Journal
Abstract
The development of space launch vehicle is an important step to advance to developed countries in the space area. It is also so risky due to necessity of huge costs and longer development period. The accuracy of cost estimation is important to develop a space launch vehicle successfully and efficiently. It is also necessary to estimate production and operation cost in order to develop commercial space launch vehicle possessing competitiveness. In this paper, Korean factors to be able to reflect the current state of workforce, average working hours and technology readiness level in Korea were analyzed to estimate production and operation cost of space launch vehicles that are developed in Korea. Korean factors have been applied to production and operation cost estimation of KSLV-II based on TRANSCOST. We evaluated the competitiveness level of KSLV-II as the commercial launch vehicle in the commercial launch services market by comparing with cost per flight of foreign launch vehicles.
Keywords
Launch Vehicle; Cost Model; Production Cost; Operation Cost; KSLV-II; TRANSCOST;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 D. Koelle, “Handbook of Cost Engineering For Space Transportation Systems”, TransCostSystems, 2010.
2 유일상, 서윤경, 이준호, 오범석, “우주발사체 개발사업의 비용 추정 현황 및 사례”, 한국산업경영시스템학회지, Vol. 30, Sep. 2007, pp.165-173.   과학기술학회마을
3 강석진, 장영근, “한국에서의 발사체 개발비용 산정을 위한 한국화요소 적용방안”, 한국항공우주학회 2009년도 춘계학술발표회 논문집, 2009, pp. 697-700.
4 Organisation for Economic Co-operation and Development, http://www.oecd.org.
5 장상희, 조정문, “문화와 일에 대한 태도-한국과 일본 노동자의 일에 대한 헌신도 비교연구”, 한국사회학회지, Vol. 38(3), 2004, pp. 39-80.
6 과학기술통계서비스, http://sts.ntis.go.kr.
7 장영근, “발사체 개발비용 산정 및 평가모델 개발(2009-0094086)”, 교육과학기술부, 2009.
8 Ascend $SpaceTrak^{\circledR}$ [online database], http://http://ascendspacetrak.com/Home/Login.aspx.
9 S. Isakowitz, J. Hopkins, J. Hopkins Jr., "International Reference Guide to Space Launch Systems, AIAA, 2003.