• 제목/요약/키워드: erection time

검색결과 71건 처리시간 0.032초

자원 제약을 고려한 조선산업에서의 탑재 일정계획에 관한 연구 (A Study on the Erection Scheduling for Shipbuilding Considering Resource Constraints)

  • 김기동;우상복;한형상
    • 산업공학
    • /
    • 제14권3호
    • /
    • pp.218-226
    • /
    • 2001
  • Scheduling for shipbuilding processes has many alternative solutions since it has long time horizon and handles many jobs. This requests the scheduling system to generate and search feasible alternative solutions in short period of time. Among shipbuilding schedules, the ship erection schedule in a dock is the most important since the dock is the most critical resource in shipyard. In this research, we model the erection scheduling problem for shipbuilding and develop a new problem solving method using CST(Constraint Satisfaction Technique) and ILOG Scheduler. Experimental results show that the proposed scheduling method outperforms the existing manual scheduling methods in terms of schedule performance and required time.

  • PDF

선행 탑재장에서의 공간일정계획에 관안 연구 (A Study on Spatial Scheduling in the P.E. Stage)

  • 구충곤;윤덕영;배태규;조민철
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2004년도 학술대회지
    • /
    • pp.61-66
    • /
    • 2004
  • In this paper an effort is made to develop an innovative spatial arrangement concept pertaining to ship building industry. The spatial scheduling is the problem that concentrates on effective planning of available space and arrangements of blocks and in a priority manner. In order to create an effective spatial scheduling. a database providing the priority has to be available to make the erection sequence. Such a system works hand in hand with erection sequence generator program The erection sequence program works on the conventional network analysis method which uses a typical parent-children idea for the calculation of the ENT(possible earliest network start time) and LNT(possible latest network start time). This program works in a cyclic manner taking turns by calculating the ENT in upward trace and LNT on the return trace thereby generating the entire erection sequence diagram for the requisite problem The generated database serves as an input data for spatial scheduling problem. When the system works it takes into consideration the entire system based on heuristic concepts as mentioned. There system uses the spatial aspects such as the available area of the P. E area and plan area of the corresponding blocks and its priority of erection from the erection sequence generator program develops the spatial scheduling arrangement. In this paper using all these concepts an innovative spatial schedule development system developed.

  • PDF

Application of Sensor Technology for the Efficient Positioningand Assembling of Ship Blocks

  • Lee, Sang-Don;Eun, Seong-Bae;Jung, Jai-Jin;Song, Ha-Cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제2권3호
    • /
    • pp.171-176
    • /
    • 2010
  • This paper proposes the application of sensor technology to assemble ship blocks efficiently. A sensor-based monitoring system is designed and implemented to improve shipbuilding productivity by reducing the labor cost for the adjustment of adequate positioning between ship blocks during pre-erection or erection stage. For the real-time remote monitoring of relative distances between two ship blocks, sensor nodes are applied to measure the distances between corresponding target points on the blocks. Highly precise positioning data can be transferred to a monitoring server via wireless network, and analyzed to support the decision making which needs to determine the next construction process; further adjustment or seam welding between the ship blocks. The developed system is expected to put to practical use, and increase the productivity during ship blocks assembly.

보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘 (Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building )

  • 김기호;이범식;김진원;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

조선 공정 계획의 수립 완성도 향상을 위한 이산 사건 및 이산 시간 혼합형 시뮬레이션 프레임워크 (Combined discrete event and discrete time simulation framework for the improvement of shipbuilding process planning)

  • 차주환;노명일;방경운;이규열
    • 한국시뮬레이션학회논문지
    • /
    • 제17권4호
    • /
    • pp.71-80
    • /
    • 2008
  • 본 연구에서는 조선 공정 계획의 수립 완성도 향상을 위한 다양한 시뮬레이션 시스템의 개발을 지원하는 시뮬레이션 프레임 워크(simulation framework)를 제안하였다. 그리고 제안된 시뮬레이션 프레임워크의 핵심 부분인 시뮬레이션 커널을 구현하였다. 구현된 시뮬레이션 커널은 이산 사건(discrete event)과 이산 시간(discrete time) 시뮬레이션뿐만 아니라 이들이 혼합된 형태의 시뮬레이션도 처리 가능하도록 하였다. 제안된 시뮬레이션 프레임워크의 효율성과 효용성을 평가하기 위해, 이를 조선 분야의 블록 탑재 공정(block erection process)에 적용하였다. 그 결과, 제안된 시뮬레이션 프레임워크가 조선 공정 계획을 위한 다양한 시뮬레이션 시스템을 개발하는데 효과적으로 사용될 수 있음을 확인하였다.

  • PDF

이산 사건 및 이산 시간 혼합형 시뮬레이션 커널의 통합 시스템을 이용한 블록 탑재 시뮬레이션 (Block Erection Simulation Using the Integrated System of Combined Discrete Event and Discrete Time Simulation Kernel)

  • 차주환;노명일;조두연;이규열
    • 대한조선학회논문집
    • /
    • 제46권3호
    • /
    • pp.303-312
    • /
    • 2009
  • Recently, requests for the accurate process planning using modeling and simulation technique are increasing in many engineering fields including shipbuilding industry. In this study, Combined DEVS(Discrete EVent System specification) and DTSS(Discrete Time System Specification) simulation kernel is developed, and an integration strategy of dynamics simulation module and graphics module is also implemented. To evaluate the efficiency and applicability of the simulation kernel and integration strategy, these are applied to the block erection simulation of offshore structures.

PCCAP을 이용한 장대 사장교의 버페팅 해석 (Beffeting Analysis of Long Span Cable-stayed Bridge using PCCAP)

  • 유원진;이석용;남효승;이완수
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.202-208
    • /
    • 2003
  • In this study, a time domain analysis is presented for investigation on the buffeting response of cable-stayed bridge during both erection and completion stages. The main span length and width of deck are 520 m and 15.1m, each. Since the ratio of span over width is 34.44, aerodynamic stability of the bridge during erection is expected to dominate the safety of the bridge in construction stage. Several conclusions regarding different construction stages and temporary wind cables are obtained.

  • PDF

Stacking Ensemble Learning을 활용한 블록 탑재 시수 예측 (A Study on the Work-time Estimation for Block Erections Using Stacking Ensemble Learning)

  • 권혁천;유원선
    • 대한조선학회논문집
    • /
    • 제56권6호
    • /
    • pp.488-496
    • /
    • 2019
  • The estimation of block erection work time at a dock is one of the important factors when establishing or managing the total shipbuilding schedule. In order to predict the work time, it is a natural approach that the existing block erection data would be used to solve the problem. Generally the work time per unit is the product of coefficient value, quantity, and product value. Previously, the work time per unit is determined statistically by unit load data. However, we estimate the work time per unit through work time coefficient value from series ships using machine learning. In machine learning, the outcome depends mainly on how the training data is organized. Therefore, in this study, we use 'Feature Engineering' to determine which one should be used as features, and to check their influence on the result. In order to get the coefficient value of each block, we try to solve this problem through the Ensemble learning methods which is actively used nowadays. Among the many techniques of Ensemble learning, the final model is constructed by Stacking Ensemble techniques, consisting of the existing Ensemble models (Decision Tree, Random Forest, Gradient Boost, Square Loss Gradient Boost, XG Boost), and the accuracy is maximized by selecting three candidates among all models. Finally, the results of this study are verified by the predicted total work time for one ship among the same series.

공간일정계획에서의 부하조정을 위한 방법론 연구 (A Study on method of load attribute for Spatial Scheduling)

  • 백동식;윤덕영;곽현호
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2004년도 학술대회지
    • /
    • pp.96-100
    • /
    • 2004
  • In the ship building industry various problems of erection is counterfeited due to formation of bottle necks in the block erection flow pattern This kind of problems cause accumulated problems in real-time erection right on the floor, When such a problem is approached, a support data of the entire erection sequence should be available, Here planning is done by reasoning about the future events in order to verify the existence of a reasonable series of actions to accomplish a goal. This technique helps in achieving benefits like handling search complications, in resolving goal conflicts and anticipation of bottleneck formation well in advance to take necessary countermeasures and boosts the decision support system, The data is being evaluated and an anticipatory function is to be developed This function is quite relevant in day to day planning operation. The system updates database with rearrangement of off-critical blocks in the erection sequence diagram, As a result of such a system, planners can foresee months ahead and can effectively make decisions regarding the control of loads on the man, machine and work flow pattern, culminating to an efficient load management. Such a foreseeing concept helps us in eliminating backtracking related adjustment which is less efficient compared to the look-ahead concept. An attempt is made to develop a computer program to update the database of block arrangement pattern based on heuristic formulation.

  • PDF

톨러런스기반 플레이트 접합 장치를 사용한 고중량 RC보의 설치 성능 (Erection Capability of Heavy Precast Frames with Metal Plates using Wet Concrete for Tolerance)

  • 홍원기;응엔 반 티엔;응엔 만 컹;쿤디마나 에릭
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.12-13
    • /
    • 2021
  • Methods for the manufacture, erection, and assembly of heavy frame modules were proposed. Interferences among precast members were prevented by using bolted metal plates for dry precast beam-to-column joints during assembly with a clearance for tolerance implementing grouted concrete filler plates instead of metal filler plates. Clearances for tolerances were provided to avoid conflictions among components during erection phases. These gaps were, then, grouted by high-strength mortar. The constructability of new connections of a beam-to-column joint using bolted metal plates for precast structures was examined using a full-scale assembly test in which practical observations indicated that members could be aligned and placed accurately in both horizontal and vertical directions, leading to a fast and convenient assembling. Bolt holes of the endplate were properly aligned using couplers with 30 mm fastened length embedded in the columns. The assembly test demonstrated the erection safety and structural stability of the proposed joints that were without filler plates when they were subjected to heavy loads at the time of their erection. The facile and rapid assembly of precast beam-to-column connections with a 30 mm tolerance was observed. The proposed assembly method is rapid, sustainable, and resilient, replacing the conventional methods of concrete frame construction, offering a connection that can be used in constructing infrastructure, such as buildings and pipe-rack frames.

  • PDF