1 |
Bang, K.W., 2006, Combined Discrete Event and Discrete Time Simulation Framework for Shipbuilding Process Planning, M.Sc. Thesis, Seoul National University
|
2 |
Cha, J.H., Bang, K.W. and Roh, M.I., 2006, Calculation of the Wire Tension and Angle of a Crane Using an Open Dynamics and Collision Calculation Library ODE(Open Dynamic Engine), Technical Report, Advanced Ship Design Automation Laboratory, Seoul National University
|
3 |
Cha, J.H., Lee, K.Y., Roh, M.I., Ham, S.H., Suh, H.W., and Park, K.P., 2007, 'A Strategy for Integration of Dynamics Module and Visualization Module for Shipbuilding Process Simulation,' Proceedings of the Annual Meeting, The Society of CAD/CAM Engineers of Korea, pp. 385-391
|
4 |
Bang, K.W., Lee, K.Y., Cha, J.H., Roh, M.I., and Kim, H.J., 2007, 'Proposal of a Combined Discrete Event and Discrete Time Simulation Framework and Its Application to the Block Erection Process in Shipbuilding,' Proceedings of the Annual Meeting, The Society of CAD/CAM Engineers of Korea, pp. 297-305
|