• 제목/요약/키워드: engineering & procurement & construction(EPC)

검색결과 46건 처리시간 0.025초

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

석유화학 플랜트 프로젝트 상세설계 실패사례활용방안에 대한 연구 (Utilization of Failure Examples in Detail Design for Oil and Petrochemical Plant Project)

  • 강태영;문승재;유호선
    • 플랜트 저널
    • /
    • 제5권2호
    • /
    • pp.62-67
    • /
    • 2009
  • The capability of design and engineering of global EPC companies has long been equalized through past similar construction experiences. Among various key factors in the success of EPC project, the capability of engineering is considered to be the most important factor since the engineering is preceding activities of EPC contract. The failure of engineering may adversely affect the subsequent procurement & construction activities and in turn may cause cost overrun or schedule delay. Therefore, an EPC company needs to continue to improve the engineering capabilities for the success of project. The engineering capabilities can be further improved if the EPC company should prevent recurrence of similar design faults that were previously committed. This study is intended to present how to make the most of the failure examples from previous projects towards a success of project. Failure is but a stepping stone to success. The EPC company can obtain useful lessons from the analysis of past failure examples.

  • PDF

극한지 자원이송망 EPC단계에서 발생되는 데이터 항목에 관한 기초연구 (A Fundamental Study on Data Item occurred in EPC Stage of Pipeline in Extreme Cold Weather)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.18-19
    • /
    • 2014
  • As issued the development of energy resources, EPC work process through the IT technology is essential for efficient business management, and systematic management of data generated in this process is needed. In domestic, the research related to system development for the collection and management of construction data detected in the field has been done continuously, but pipeline business target the long-distance in extreme cold weather, almost no cases have been studied up to now. Therefore, this research is aimed to derive the data item for efficient management in EPC Stage of pipeline business in extreme cold weather. WBS system of EPC work are classified easily at two levels, data items can be divided based on the type of document. In the future I will be expected to be the foundation of the systematic management of data generated in the EPC step-by-step of pipeline business.

  • PDF

구매엔지니어링을 위한 지식기반 서비스 적용 방안에 관한 연구 (A Study on the Application of Knowledge-based Service in Procurement Engineering)

  • 김진일;차재민;신중욱;염충섭
    • 시스템엔지니어링학술지
    • /
    • 제14권2호
    • /
    • pp.67-72
    • /
    • 2018
  • In the EPC(Engineering Procurement and Construction) project of the plant, procurement engineering has a profound effect on the profitability of the project. It is important that the procurement specifications are well written to ensure that procurement engineering works properly. In the meantime, the procurement specifications have been created by the experience of the person in charge because there was no system for helping procurement engineering. To cope with this situation, we are developing a procurement engineering management support system (PeMSS). This paper describes how to implement a knowledge-based service in the procurement engineering management support system. First, we briefly introduce the PeMSS, the knowledge base application field, and how to apply it. The parts that requires knowledge-based service are parsing the requirements in the PDF (Portable Document Format) file and management of the document provided by the supplier of the equipment.

전환 정액일괄도급 계약방식 프로젝트의 리스크 분석 (Risk Assessment for the Converted Lump-sum Turnkey Project)

  • 황덕진;문승재;유호선
    • 플랜트 저널
    • /
    • 제7권2호
    • /
    • pp.39-43
    • /
    • 2011
  • Due to the recent uncertainty of market situations such as the escalation of petroleum prices, increased production capacities of plants, limitations of the available EPC (Engineering, Procurement, Construction) contractors, and the increase of raw material prices, EPC contractors have had a tendency to include a higher reserve contingency in the lump-sum turnkey contract price. In order to overcome the changes in the market, the plant project construction industry has started to apply the converted lump-sum turnkey contract in plant construction market. This study was focused to find the associated risks and to analyse the identified risks on recent trend of application of the new contract type, which is the converted lump-sum turnkey contract. It was recognized from the analysis that quality and cost have more high priority risks than other project objectives. This paper also suggests the mitigation plan for identified risks to achieve project objectives appropriate to the converted lump-sum turnkey project from the viewpoint of an EPC contractor keeping transparency with owner.

  • PDF

풍력에너지 개발을 위한 자원평가 및 엔지니어링 설계 (Resource Assessment and Engineering Design for Wind Energy Development)

  • 김성국
    • 기술사
    • /
    • 제42권1호
    • /
    • pp.49-53
    • /
    • 2009
  • Wind energy development and wind farm construction request multi-disciplinary study and coordination to pursuit economically and technically feasible project that may deliver a viable business model. This paper is to provide the study and coordination procedure with key management factors about the wind energy resource assessment and engineering design for EPC(Engineering, Procurement and Construction) contract for the successful business development.

  • PDF

LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 - (Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage -)

  • 박환표;한재구;진경호
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.47-57
    • /
    • 2014
  • LNG 플랜트사업은 그 특성상 해외에서 사업을 추진하기 때문에 사업관리도 일반적인 사업관리방식과는 차이점이 있다. LNG 플랜트 사업 프로세스는 가스탐사 및 생산, 물리적인 액화 및 화학적인 전환공정, 수송, 저장 등의 가치사슬로 구성되며, 주로 천연가스를 액체원료나 연료로 전환하는 장치를 중심으로 액화공정(초저온 액화) 및 FEED 패키지, 제어 운영, 건설수행 등 EPC 기술을 대상으로 하고 있다. 이러한 해외에서 수행되고 복잡한 LNG 플랜트공사의 성공은 사업관리 의사결정에 따른 사업의 성패가 달라질 수 있다. 따라서 본 연구는 LNG 플랜트공사의 시공단계 사업관리 의사결정지원 모델을 구축하기 위하여 EPC 단계별로 9개의 사업관리요소 항목을 도출하고, 각 항목별 중요도를 평가하였다. 중요도 평가결과, EPC 단계별로 사업관리와 리스크관리 항목이 공통적으로 중요한 것으로 도출되었다. 특히 본 연구는 사업관리 요소항목과 중요도 평가결과를 기반으로 LNG 플랜트공사의 시공단계의 의사결정지원모델을 개발하였다. 개발된 의사결정지원모델은 향후 시공단계의 사업관리 의사결정지원 시스템 구축의 기반이 될 것이다.

플랜트 구매조달 및 자재관리 시스템 개발 요구사항 분석을 통한 개발 방향 제시 (Proposal for Developed Procurement and Material management System On Using Previous System Analysis in Plant Engineering)

  • 이승현;김선국;이준복;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.204-209
    • /
    • 2006
  • 최근 건설업의 불황에도 불구하고 고유가에 힘입어 해외 플랜트 시장 특히, 중동의 플랜트 시장은 크게 호황을 이루고 있다. 이는 고유가를 바탕으로 한 중동의 여러 국가에서 대규모프로젝트를 계속적으로 발주를 하고 있어 국내 건설사들은 이러한 플랜트 수주를 통하여 건설 불황을 타개하려 하고 있다. 현재에는 플랜트 시장이 전반적으로 호황을 이루기에 국내 건설사들이 해외 수주를 하는데 있어 큰 어려움을 겪지는 않고 있으나, 고부가가치이며 수익성이 높고 고도의 기술력이 요구되는 원천기술은 선진 엔지니어링 회사에서 과점 형태로 시장을 점유하고 있어 우리와 같은 후발 주자들은 단시간 내에 그 대열에 합류하기란 큰 어려움이 예상된다. 따라서 본 연구에서는 국내 기업의 경쟁력을 강화시키기 위한 방안으로써 플랜트 공사 구매조달 시 담당자의 지식 및 업무능력 범위 내에서 업무가 수행되는 것을 시스템화하여 모든 구매조달 관련자가 선진 수준에서 업무를 수행할 수 있도록 하는 구매조달 시스템과 이에 연계해서 자원 운영을 최적화 효과를 얻을 수 있도록 현장 내 자재 관리 시스템을 구축을 제시하려 한다.

  • PDF

해양플랜트 소형 유틸리티장비의 FEED 검증 프로세스에 대한 연구 (A Study of FEED Verification process of Small Utility Equipment in Offshore plant)

  • 한성종;박범
    • 플랜트 저널
    • /
    • 제13권2호
    • /
    • pp.39-45
    • /
    • 2017
  • 본 논문은 시스템엔지니어링기법을 이용하여 해양플랜트 산업의 소형 유틸리티 장비의 입찰단계에서 사용가능한 FEED 검증 수행모델에 대한 연구이다. 현재 국내 해양플랜트 기자재산업계는 해양플랜트에 진출하면서 프로젝트 수행에 따른 재정적 위험에 직면한 상태이며, 그 주요한 원인으로 기자재업체의 발주처(COMPANY 또는 EPC: Engineering, Procurement and Construction) 로부터 제공받은 FEED 결과물에 대한 검증능력부족으로 조사되었다. 이에 요구사항 분석, 기능, 성능분석 및 물리적아키텍처 구축프로세스를 순차적으로 적용하는 시스템 엔지니어링 기법을 간략화 한 FEED 설계 검증방법을 제안하고 이를 소형 유틸리티 장비(Air Compressor)를 대상으로 기존의 경험에 의존한 검증방법과 개발한 FEED 검증 모델을 적용한 결과를 비교함으로써 개발된 모델의 사용적정성을 검증하였다.

  • PDF

플랜트 프로젝트 일정위험 예외상황 예측 및 평가 (Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants)

  • 성홍석;정종윤;박철순
    • 산업경영시스템학회지
    • /
    • 제39권4호
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.