• Title/Summary/Keyword: embankment on soft ground

Search Result 148, Processing Time 0.036 seconds

An Analytical Study on the Determination of Reinforcement Length of Pile Slab Method (Pile Slab 공법의 보강길이 산정에 관한 해석적 연구)

  • Lee, Young-Keun;Park, Choon-Sik;Lee, Chae-Gun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1232-1238
    • /
    • 2008
  • From the result of analysis using finite element method for the Pile Slab reinforcement length through embankment of height, soft ground and the change of cohesion following results were acquired. 1. The higher embankment of height is, the deeper depth of soft ground is, the smaller cohesion is, Pile Slab reinforcement length increased almost straight. 2. The reinforcement length is controlled by the depth of soft ground, cohesion, embankment of height and the like. Among these, cohesion of soft ground is affected the most. 3. The reinforcement length of Pile Slab is determined using by calculated formula.

  • PDF

Lateral Displacement and Ground Rising Movement with Soil Embankment (성토에 따른 지반의 측방변위와 지표면 융기량)

  • Jeong, Ji-Cheol;Shin, Bang-Woong;Oh, Se-Wook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.5 no.2
    • /
    • pp.63-69
    • /
    • 2004
  • During and after the construction of embankment on soft ground, consolidation settlements and lateral displacements develop. But generally it's very difficult to predict the magnitude of lateral deformations and the correct distribution of lateral displacements with depth under the toe of embankment because the consolidation and the shear deformations of soft ground occur simultaneously. This study shows that later displacements of ground surface arise by embankment loading act on soft clay hight water contents in laboratory model testing. The results of model test are observed settlement of embankment, amount of maximum rising and displacement of ground surface with loading velocity. The formula were proposed to predict lateral movement by test series.

  • PDF

Applications of the EPS Embankment Metod to Earth Fils at the Seaside (해안 매립지역의 EPS 성토공법 적용)

  • 장용채;조성민;이유옥
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.219-224
    • /
    • 1999
  • The expansion of old road is needed in construction the entrance at the $\bigcirc$$\bigcirc$I/C road in $\bigcirc$$\bigcirc$city. To strength the national competition, many agents who concerned do their best for finishing that construction early as soon as possible. In generally, soil embankment on soft foundation is caused to reduce the stability by making the settlement of ground surface due to the over load. Thus, we try to make it stable by building EPS embankment construction which in our working place is one kind of the method of light embankment construction after excavating the original ground.

Wave Propagation Analysis for Pile-Slab Section on High Speed Railway (고속철도 파일슬래브공법 적용구간에서의 파전파해석)

  • Lee, Kang-Myung;Lee, Il-Wha
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3201-3207
    • /
    • 2011
  • This paper reviewed wave propagation of train vibration based on the study of high speed railway soft ground section with pile slab construction. In a filed of railway, concrete track has been adapted in a railway construction. And in order to maintain its track, soil improving method was required to control residual settlement. Within many soft ground settlement prevention techniques, pile slab method has an effect of minimizing residual settlement of soft ground. This is possible using support embankment load method by construct pile slab or cap the upper soft ground. This paper reviewed vibration wave characteristic of soft ground section with pile slab using numerical analysis application through finite element analysis. Pile slab method is established between high stiffened soft ground and embankment this creates a possibility of vibration block or slab amplification. Thus analyzed of wave propagation was done with roadbed and structure property to confirm application performance of pile slab method of high speed railway structure.

  • PDF

Applications of the Light Weight Method of EPS to Sub-road Fills at the Seaside (해안 도로상의 EPS 하중경감공법의 해석)

  • 장용채
    • Journal of Korean Port Research
    • /
    • v.14 no.2
    • /
    • pp.233-239
    • /
    • 2000
  • The expansion of old road is needed in constructing the entrance at the $\bigcirc$$\bigcirc$I/C road in $\bigcirc$$\bigcirc$city. To strength the national competition, many agents who concerned do their best for finishing that construction early as soon as possible. In generally, soil embankment on soft foundation is caused to reduce the stability by making the settlement of ground surface due to the over load. Thus, we try to make it stable by building EPS embankment construction which in our working place is one kind of the method of light embankment construction after excavating the original ground.

  • PDF

A Study on the Prevention Effect of Lateral Movement by Finite Element Analysis (유한요소해석에 의한 측방이동 방지효과에 대한 연구)

  • Park, Choon-Sik;Rho, Tae-Kyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.12
    • /
    • pp.71-82
    • /
    • 2018
  • This study presents a reasonable and economical DCM reinforcement length for the various factors (the embankment height, the distance from the embankment to the underground structure, the depth of the soft ground, and the compression index and the swelling index of the soft ground) that affect the stability of the structure due to lateral movement. Based on these results, we analyzed each factor's degree of influence and figured out which factor influenced the lateral movement most. The cross section of the embankment on the soft ground was modeled by using the Finite Element Program and reinforced with DCM. The results show that the increase rate of the reinforcement length with the increase of the embankment height is about 9~50%, the increase rate of the reinforcement length with the depth of soft ground is about 13~30%, and the increase rate of the reinforcement length with increasing compression index is about 3~25%. In addition, the influence of each factor on each other was analyzed. As a result, among the separation distance, the compressive index and the maximum to minimum slope ratio of the reinforcement length of the embankment height, the separation distance was the largest for the depth of soft ground. As the depth of the soft ground increases, the ratio of the maximum to minimum slope of the reinforcement length according to the embankment height is 3.75, the ratio of the maximum to minimum slope of the reinforcement length according to the spacing distance is 4.3, and the ratio of maximum to minimum slope according to compression index is 2.5. From these results, it is confirmed that the three factors are greatly affected by the depth of soft ground.

A Development of Automated Monitoring Technique and Feedback Design System for Embankment on Soft Ground (연약지반 계측 정보관리 및 자동분석.재설계 시스템 개발)

  • 한영철;윤동덕;김주용
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.103-108
    • /
    • 1999
  • This paper describes development of a new automated real-time system which preforms measurement data reduction and management, geotechnical backanalysis, and feedback design for embankment construction on soft ground. Such a system can be an effective, useful and economical tool for managing a large site development on soft ground. The system consists of data base system to characterize soil properties and identify instrumentation, analysis system for ground behavior and stability coupled with automatic monitoring system, and feedback design system which is a new technique to reflect the analysis of measured ground behavior against original design.

  • PDF

Calculation of Immediate Settlement Caused by Shear Deformation for Embankment on Soft Ground (연약지반 성토시 전단변형에 의하여 유발된 즉시침하량의 산정)

  • 정하익;진현식;진규남;김달용
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.02a
    • /
    • pp.78-83
    • /
    • 1999
  • The ultimate settlement of soft clay consists of three parts: $\circled1$ immediate settlement, S$\sub$d/; $\circled2$ Primary consolidation settlement, S$\sub$c/; $\circled3$ Secondary consolidation settlement, S$\sub$s/. In general, S$\sub$c/ can be accurately calculated by one-dimensional consolidation and S$\sub$s/ or S$\sub$d/ may be ignored. This paper focuses on a calculation method to estimate the immediate settlement induced by lateral deformation of subgrade, to which shear stress is applied by embankment on soft ground. Immediate settlement and consolidation settlement are discussed by comparing the field measurement of the Yangsan test embankment on treated soft foundation by vertical paper drains.

  • PDF

Effect of the Settlement Reduction to each Geosynthetic Reinforced Pile Supported Embankments Design Condition (토목섬유보강 성토지지말뚝의 설계조건별 침하억제 효과)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Moon, In-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1519-1524
    • /
    • 2009
  • Construction of high-speed concrete track embankments over soft ground needs many of the ground improvement techniques. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. However, when time constraints are critical to the success of the project, another measures should be considered. Especially, since the design criteria of residual settlement is limited as 30mm for concrete track embankment, it is very difficult to satisfy this allowable settlement by using the former construction method. Pile net method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. In this paper, three cases with different embankment height and number of geosynthetic reinforcement, were studied through FEM analysis for efficient use of pile net method.

  • PDF

Displacement Characteristics of Soft Ground by Embankment Construction (제방축조에 의한 연약지반의 변위특성)

  • Ahn, Kwangkuk;Bae, Wooseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.2
    • /
    • pp.29-39
    • /
    • 2007
  • In this study, the centrifugal tests were fulfilled to analyze the displacement characteristics caused by the embankment construction on soft ground. Embankment of height, undrained shear strength and with or without geotextile were selected to evaluate the displacement characteristics of soft ground by embankment. As a result, the replacement section without geotextile showed the parabola shape. The replacement section with geotextile showed the trapezoidal shape which represents the uniform settlements. The replacement angle is increasing nearly lineally with increasing the height of embankment and G-level. The position, where the maximum horizontal displacement occurred, was between $0.24H_0$ and $0.35H_0$ and was at $0.3H_0$ on the average. In the case of with and without geotextile, the relationship between the maximum settlement of ground(S) and maximum horizontal displacement(${\delta}_m$) was ${\delta}_m$ = 0.60S, ${\delta}_m$ = 0.54S, respectively.

  • PDF