• Title/Summary/Keyword: electric train

Search Result 604, Processing Time 0.028 seconds

A Study on the Shift Motor Driving System Optimization of 4-WD Power Transformation Device (4-WD 동력전환장치의 변속 모터 구동부 최적화에 관한 연구)

  • Youm, Kwang Wook;Ham, Seong Hun;Oh, Se Hoon
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.30 no.11
    • /
    • pp.1187-1192
    • /
    • 2013
  • In the case of 4 wheel drive (4-WD) type car, power switching occurs to 4-WD by operating lever or switch that operates power switching device attached in transfer case which can operate motor by electric signal. So if the RPM of motor is high, power switching will not exactly occur and can cause damage to gear in transfer case according to circumstances. So in this study, we applied 2 level of planet gear type motor spindle of motor drive part of a power train. And conducted decelerating to increase torque to switch power safe and accurately. Also, we researched efficiency of gear by designing reduction gear ratio and gear type and by calculating contact stress and bending strength. Based on researched content, we made drive head of power switching device and a reduction module which uses type that uses motor spindle as sun gear and ring gear as cover.

Sizing of Powertrain in Fuel Cell Hybrid Vehicles (연료전지 하이브리드 자동차의 동력전달계의 용량 선정)

  • Zheng, Chun-Hua;Shin, Chang-Woo;Park, Yeong-Il;Cha, Suk-Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.19 no.6
    • /
    • pp.113-118
    • /
    • 2011
  • Fuel Cell Hybrid Vehicle (FCHV) is one of the most promising candidates for the next generation of transportation. It has many outstanding advantages such as higher energy efficiency and much lower emissions than internal combustion engine vehicles. It also has the ability of recovering braking energy. In order to design an FCHV drive train, we need to determine the size of the electric motor, the Fuel Cell System (FCS), and the battery. In this paper, the methodology for the sizing of these components is introduced based on the driveability constraints of the FCHV. A power management strategy is also presented because the battery energy capacity depends on it. The warm-up time of the FCS is also considered in the power management strategy and the simulation result is compared to that without considering the warm-up time.

Mechanical Design of a 750 kW Direct-drive Wind Turbine Generator System (750kW급 풍력터빈발전기의 기계설계)

  • Sohn, Y. U.;Son, J. B.;Park, I. S.;Kim, Y. C.;Kim, K. R.;Chung, C. W.;Chun, Ch. H.;Ryu, J. Y.;Park, J, I.;Byun, C. J,;Kim, D. H.
    • 유체기계공업학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.379-384
    • /
    • 2004
  • A prototype of 750 kW direct-drive wind turbine generator system, KBP-750D is under development in Korea. For the gearless, direct-drive prototype a synchronous generator with permanent magnets has been developed. The upwind 3-blade type machine employs variable speed and pitch control. The operating ranges of wind and rotor speed are 3 to 25 m/s and 9 to 25 rpm, respectively. The tip speed ratio of rotor blade is 7.5, designed for power coefficient 0.47, The blade pitch and torque are controlled with the predefined torque-speed curve according to the conditions of wind and public electric grid. This paper describes the outlines of primary components of KBP-750D.

  • PDF

A Study on Pressure Control Method of Train Brake System (철도차량 제동기의 압력제어에 관한 연구)

  • Lee, Han-Min;Kim, Gil-Dong;Park, Sung-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1909-1915
    • /
    • 2008
  • The brake systems of the rolling stocks are generally consisted of electrical and mechanical brake systems. Because of its inherent structure of the each brake system, the electrical brake system is mainly used at the high speed range while the mechanical brake system is used at the relatively lower speed range. It is desirable for the rolling stocks to apply the entire electrical brake system. However, since the brake force from electric brake system is not enough to stop the rolling stock within the legal stop distance. Therefore, the mechanical brake system is indispensable to rolling stocks. In general, the vast majority of the world trains are equipped with mechanical braking systems which use compressed air as the force to push block on to wheels or pads on to discs. These mechanical systems are known as air brake or pneumatic brakes. For the air brake system, basically huge scale air compressor is equipped and the long pipe line is complexively connected. Since mass of these air brake components, it is difficult to be a light weight equipment and the long pipe line raise the maintenance problem. In order to overcome these problems of air brake system, the hydraulic brake system is proposed in this research. The hydraulic brake system makes the whole weight of brake equipment be light and large braking force can be applied. Therefore, in this research, the validity and advantages of applying the hydraulic brake system are reviewed.

  • PDF

A Study for Developing of Rail Bridge Inspection Robot (철도교량 자동화 로봇 개발을 위한 기초 연구)

  • Koo, Ja-Kyung;Hwang, In-Ho;Lee, Jong-Seh;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.188-193
    • /
    • 2008
  • According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.

  • PDF

Static Analysis of AT Feeding Systems considering the Limited Rise of Regenerative Voltage (회생 차량의 전압 상승 한도를 고려한 AT 급전시스템 정태해석)

  • Kim, B;Moon, Y.-H
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1322-1327
    • /
    • 2004
  • There are some previous studies that utilize constant impedance models or constant current models for electric trains to perform the static analysis of AT feeding systems. These mentioned models have some merits of linear systems but yield erroneous results because of the innate restraints of the models since linear models cannot represent the features of constant power in inverter-driven trains. From these reasons, it is suitable that the train be considered as a constant load model when it drives or as a constant source model when it applies regenerative brake. However, excessive rise of regenerative voltage during the braking may damage the vehicle itself and the feeding systems so the voltage must be restricted below a certain value. Keeping these facts in minds, we suggest new methods of analyzing AT feeding systems using the constant power models with the conditions of voltage constraints. The simulation results from a sample system using the proposed method illustrate both the states of system variables and the supply-demand relation of power among the trains and the systems very clearly, so it is believed that the proposed method yields more accurate results than conventional methods do.

  • PDF

Development of Rehabilitation Training System Using Unstable Flatform with Magneto-Rheological Damper (MR 댐퍼 적용 불안정판을 이용한 재활 훈련시스템 개발)

  • Choi, Youn-Jung;Piao, Yong-Jun;Heo, Min;Kwon, Tae-Kyu;Hwang, Ji-Hye;Kim, Dong-Wook;Kim, Nam-Gyun
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.14 no.2
    • /
    • pp.197-204
    • /
    • 2008
  • The purpose of this paper was to develop a rehabilitation training system which is controlled by electric currents to the Magneto-Rheological dampers system. This system provided the function for the training of the unbalance of the lower extremities. 10 subjects executed the tracing and moving exercises which are presented through the display monitor and confirmed own the capability of performance on the task. The electromyographies of the four muscles in lower extremities were recorded and analyzed in the time and frequency domain the muscles of interest were rectus femoris, biceps femoris, gastrocnemius, tibialis anterior. The experimental results showed that subjects had a task under feedback mode then subjects improve the capability of performance, increasing the in time, decreasing the out time and the distance of body shift. The moving average EMG, spectral energy of four muscle is lower the feedback mode than the constant mode. This could aid the hemiplegic patients to train more easily.

Development of Integrated Monitoring Middleware System for 400km/h High Speed Railway Measurement Data (400km/h급 고속철도 계측데이터 통합 모니터링 미들웨어 시스템 개발)

  • Hwang, KyungHun;Na, JunSu;Song, ByungKeun;Yang, OKYul
    • Convergence Security Journal
    • /
    • v.13 no.6
    • /
    • pp.61-68
    • /
    • 2013
  • Needs for a new technologies of infrastructure systems arose, following the development of next generation EMU(Electric Multiple Unit) train with maximum speed over 400km/h. For high-speed operation tests of the new EMU, a high-speed railway infrastructure test-bed was constructed in a 28km long section of the Honam High-speed Railway. Diverse sensors and monitoring system was installed for continuous monitoring of the railway. Due to such effort, further demands and needs of the integrated monitoring system was derived in a more comprehensive and long-term perspective.

A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS) (수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구)

  • Son, Yeong-Jin;Park, Keun-Soo;Min, Kyung-Yun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.755-770
    • /
    • 2006
  • 1974. 8.15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basic design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

  • PDF

A Study on Variation of the Dynamic Characteristic of Supply Voltage According to the Track Environment and Spatial Distribution as Driving of Urban Transits (도시철도차량의 운행 선로환경 및 공간적 분포에 따른 공급전압 동특성 변화)

  • Kim, Yang-Su;Chang, Chin-Young;Lee, Ki-Sik;Koo, Kyung-Wan;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1380-1386
    • /
    • 2012
  • It is important to consider supply voltage stability in case of design and construction of a substation at electric railway because a urban transit is operated by electricity and it is driven simultaneous in the same section. This paper study on variation of the dynamic characteristic of supply voltage according to the track environment and spatial distribution as driving of urban transits. Simulation tool, TOM(Train Operations Model) software is used to ensure stability of feeder system being used around the world. As results of simulation, voltage of the contact wire is in limits on driving operation diagram of urban transits. Also, it has confirmed that there is a correlation the phase current, depending on the speed of urban transit and track environment like vertical gradients and curve radius.