• Title/Summary/Keyword: earthworks

Search Result 56, Processing Time 0.028 seconds

A Study on the Probabilistic Risk Analysis for Safety Management in Construction Projects

  • Lee, Dong-Yeol;Kim, Dong-Eun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.8
    • /
    • pp.139-147
    • /
    • 2021
  • In this study, we proposed the possibility of reliability analysis of risk index by using Monte Carlo simulation as basic data of safety accident occurrence data and expert opinion by construction industry type. Through this, it is expected that risk index for safety accidents according to detailed types of works will be presented stochastically and it will be possible to predict the risk factors and the expected range of damage based on the reliability analysis in the construction safety management plan. It will also reduce many of the planning risks that are common to decision makers in the field of construction management. In identifying risks, road bridge construction was classified into earthworks, drainage works, and bridge construction, and possible safety accidents were classified based on expert data. The risk index was calculated for each detailed construction of road and bridge construction, drainage construction, and bridge construction.

A Study on the Safety and Health Management Plan of Subway Construction Workers using Macpa Stress Index (맥파 스트레스 지수를 활용한 도시철도 건설공사자의 안전보건관리 방안에 관한 연구)

  • Joung Sik, Chae;Yu Jeong, Lee;Jong bin, Lee;Seong Rok, Chang
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.102-107
    • /
    • 2022
  • South Korea will soon be a super-aged society, as more than 20.6% of its population will be 65 years and older by 2025. As of 2022, 17.5% of the total population in South Korea is 65 years and older, which exceeds the set threshold for an aged society, where more than 14% of the population is 65 years and older. The proportion of older subway construction workers has increased. Aging workers and their work stress negatively impact their workability. A previous study demonstrated that the stress index measured using the uBioMacpa measurement device (Macpa stress index) had a significant correlation with work stress in South Korea. The device tests vascular health and measures stress levels via Macpa signal analysis. In this study, the pulse waves of subway construction workers were measured using uBioMacpa to identify their stress levels. The stress levels were analyzed by age, years of service, job position, employment type, and work type. Herein, these statistics could not be easily represented by a normal distribution; therefore, the Kruskal-Wallis test, a nonparametric statistical method, was used for the analysis of data. The results showed that age, job position, employment type, and working type affected the Macpa stress index and the stress levels of workers increased with age. In terms of job position, technical engineers were more stressed than other workers because of their poor working environment. In terms of employment type, daily-wage workers were more stressed than other workers. In terms of working type, tunneling, waterproofing, and construction scored the highest Macpa stress indexes without any significant difference, whereas earthworks scored the lowest. Based on the analysis of Macpa stress index, safety and health management plans were proposed to reduce the stress levels of workers. Moreover, a manual for efficient stress management must be developed for subway construction workers.

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

Object-oriented Road Field BIM Standard Object Classification System Suggest Development Plan (객체지향의 도로분야 BIM 표준객체분류체계 개발방안)

  • Nam, Jeong-Yong;Kim, Min-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.119-129
    • /
    • 2018
  • The Ministry of Land, Transport and Maritime Affairs has promulgated the mandatory design of BIM for road projects of more than 50 billion won by 2020 under the Basic Plan for the Sixth Construction Technology Promotion. As a result, major public clients are attempting to implement BIMs that are appropriate to the situation of each institution. On the other hand, it is difficult to design and construct a proper BIM and accumulate BIM information of the ordering organization because the technical guidelines and standard classification system that can perform BIM effectively have not been presented sufficiently. The characteristics of the road should be managed systematically, e.g., atypical objects, such as earthworks, which are constantly changing along a line; large objects, such as bridges and tunnels; and facilities, such as signs and soundproof walls. To achieve this, a multitude of standard systems should be developed and disseminated, but there have been insufficient studies on practical methods. To solve this problem, this study developed a BIM standard object classification system in the road sector to meet the international standard, accommodate a multi-dimensional information system, and provide a more effective BIM standard information environment that can be utilized easily by practitioners.

Evaluation of Flexural Strength of Wide Sleepers with Reinforcing Bars for Quick-Hardened Concrete Track (보강철근이 적용된 급속경화궤도용 광폭침목의 보유 휨 내력 평가)

  • Bae, Young-Hoon;Lee, Il-Wha
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.2
    • /
    • pp.702-709
    • /
    • 2018
  • A quick-hardened concrete track was developed to improve the aged ballasted track to a concrete track, and applied to earthworks and tunnels of main and urban railways. Rebars for reinforcement are not generally applied to prestressed concrete sleepers. On the other hand, many cracked sleepers have been observed in railroad sites. A wide sleeper, which is one of the main components of quick-hardened concrete track, should be structurally safe and crack-resistant in a ballasted and concrete track to avoid this problem. In particular, a wide sleeper manufactured by a post-tension method must have reinforcing bars applied to the rail-seat section. In this paper, static tests, dynamic tests, and fatigue tests were carried out to compare the flexural strength and crack resistance performance of a wide sleeper with and without reinforcing bars for a quick-hardened concrete track. As a result of the test, if some reinforcing bars are applied appropriately to the rail-seat section of a wide sleeper, it will be possible to prevent the occurrence of cracks, delay the expansion of the crack width, and the flexural fracture.

Performance Effectiveness Case Study of the Machine Guidance System for Dozer Eartwrok Grading Work (도저 정지작업 시 머신 가이던스 시스템 적용에 따른 토공성과 향상 사례분석)

  • Moon, Sungwoo;Kim, Sangtae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.78-86
    • /
    • 2020
  • Dozer is an expensive construction equipment and has a significant performance impact on earthwork performance. A machine guidance system has been applied to dozer equipment as a solution that can improve the performance. The system can provide earthwork-related information to equipment operators so that earthworks can be carried out with minimum support from surveyors. Construction Equipment Machine guidance has the function of supporting earthwork according to an earthwork plan by providing excavation-related information to machine operators. The objective of this study is to evaluate the performance improvement of a machine guidance system for an dozer earthwork operation, and to compare the machine guidance method with the traditional method. The performance has been evaluated in two folds: 1) productivity and 2) accuracy. The productivity shows the quantity of earthwork for a given unit time. The accuracy shows the deviation of grading level from the designed level on the construction drawing for earthwork. The machine guidance system has been applied to a testing bed in a construction site. Data comparison analysis showed that the earth earthwork had 46.59% improvement in productivity as well as 46.96% improvement in accuracy, and is expected to provide a tool for applying smart constrction to the earthwork operation.

Evaluations on the Compaction Energy Effects on the Soil Compaction at Sub-Zero Temperature (영하에서의 다짐에너지에 따른 다짐 효과 평가)

  • Lee, Jeonghyeop;Hwang, Bumsik;Chae, Deokho;Cho, Wanjei
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.8
    • /
    • pp.13-20
    • /
    • 2015
  • Due to the population growth and exhaustion of resource, the development on the harsh environment such as cold weather is emerging as an alternative for new resource development. The permafrost area covers about 14 percent of the world's land area and the global construction market for such area is rapidly expanded. Whereas the developed countries have already recognition of the need for research of coldest place and invested heavily in technology development, the domestic technology for the coldest place development is less developed and related research has rarely been performed. There is not a detailed national specification standard for the strength and deformation properties of the earthworks at sub-zero temperature but simple field directions. Therefore, the D compaction tests were conducted on the sand with fine contents of 0%, 5%, 10% and 15% at room temperature ($18^{\circ}C$), $-3^{\circ}C$ and $-8^{\circ}C$ to investigate the effect of the compaction energy on the compacted soils at sub-zero temperatures. Based on the test results, the larger compaction energy, the larger maximum dry unit weight under sub-zero temperature and D type compaction at $-3^{\circ}C$ show similar max. dry unit weights as those obtained from the compaction at the room temperature. However, compaction at $-8^{\circ}C$ showed significant performance degradation regardless of the compaction energy.

A Study for Safety Management on the Basis of Lateral Displacement Rates of Anchored In-situ Walls by Collapse Case Histories (붕괴 사례를 통한 앵커지지 가설흙막이벽체의 수평변위속도에 의한 안전관리 연구)

  • Chung, Dae-Seouk;Lee, Yong-Beom
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.367-378
    • /
    • 2018
  • Purpose: The objective of this study is to present a reasonable safety management of the anchored in-situ wall systems constructed in the ground conditions consisting of multi-layered soils underlain by bedrocks in the urban area of Korea. Method: Field measurements collected from collapse case histories with deep excavations were analyzed for the safety management of the wall systems supported by the earth anchors in terms of lateral displacement rates. Results: The average maximum lateral displacement rate in a collapsed zone of the in-situ wall significantly increased upon the completion of the excavation. Particularly, the collapse of the in-situ wall system due to the sliding occurring along the discontinuities of the rock produced a considerably large lateral displacement rate over a relatively short period. Conclusion: For predicting and preventing the collapse of the wall system during or after the excavation work, the utilization of the safety management criteria of the in-situ wall system by the lateral displacement rate was found to be much more reasonable in judging the safety of earthworks than the application of the quantitative management criteria which have been commonly used in the excavation sites.

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.

Evaluation of Compaction Impact According to Compaction Roller Operating Conditions through CMV Analysis (CMV 분석을 통한 다짐롤러 운용 조건에 따른 다짐 영향 평가)

  • Kim, Jinyoung;Baek, Sungha;Kim, Namgyu;Choi, Changho;Kim, Jisun;Cho, Jinwoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.11-16
    • /
    • 2022
  • The compaction process using vibrating rollers in road construction is essential to increase soil stiffness in earthworks. Currently, there is no clear standard for the operation method of the compaction roller during compaction. Although simple quality inspection techniques have been developed, plate load test (PLT) and field density test (FDT) are the most frequently used test methods to evaluate the degree of compaction during road construction as the most frequently used quality inspection methods. However, both inspection methods are inefficient because they cannot perform quality inspection in all sections due to time and cost reasons. In this study, we analyzed how the operating conditions of vibrating rollers affect the compaction quality. An intelligent quality management system, which is a currently developed and commercialized technology, was used to obtain quality inspection results in all sections. As a result of the test, it was analyzed that the speed and vibration direction of the compaction roller had an effect on the compaction degree, and it was found that the compaction direction had no effect on the compaction degree.