1 |
Kim Min, "A Method of Calculating Optimal Duration and Costing Using Monte Carlo Simulaton Simulation and Linear Programming," Pukyong National University the degree of Master thesis, 2003.
|
2 |
Korea Occupational Safety and Health Agency, "Risk Analysis Guide manual," 2020, Available online: https://kras.kosha.or.kr/board/index/5#isReadOnlyMode=4270 (accessed on 28 June 2021)
|
3 |
Jang Se-Eun, "A Comparative Study of Risk Assessment System on Construction Sites," Kyonggi University the degree of Master thesis, 2011.
|
4 |
Park Hwan-Pyo and Han Jae-Goo, "Development of Risk Assesment Index for Construction Safety Using Statistical Data," Journal of the Korea Institute of Building Construction Vol.19, No.4 pp.361-371, 2019. DOI:10.5345/JKIBC.2019.19.4.361.
DOI
|
5 |
Jang Yun-Ra and Go Seong-Seok, "A Risk Assessment Counterplan for Reducing the Accident Rates in Medium and Small sized Construction Sites," Korean Journal of Construction Engineering and Management, Vol.19, No.5, 2018. DOI:10.6106/KJCEM.2018.19.5.090.
DOI
|
6 |
Minister of Land, Infrastructure and Transport, "Road Construction Standard Specification," 2016, Available online: https://www.kcsc.re.kr/File/3/CIGCSSF90042/CIGCSSF90042.pdf (accessed on 28 June 2021)
|
7 |
Minister of Land, Infrastructure and Transport, "Bridge Standard Specification," 2016, Available online: https://www.kcsc.re.kr/File/3/CIGCSSF90048/CIGCSSF90048.pdf (accessed on 28 June 2021)
|
8 |
Korea Expressway Corporation, "Highway Construction Specialized Specification," 2018, Available online: https://www.codil.or.kr/viewDtlConWrkDtlSch.do?gubun=constd&pMetaCode=CIGCOS200031 (accessed on 28 June 2021)
|
9 |
Victorian Healthcare Association(VHA), "Managing Clinical Risk in Primary Health Care," 2009, Available online: http://healthcaregovernance.org.au/docs/vha-clinical-risk-manual-print.pdf (accessed on 28 June 2021)
|
10 |
Kim Do-Su and Shin Yoon-Seok, "A Study on the Risk Factors according to the Frequency of Falling Accidents in Construction Sites," Journal of the Korea Institute of Building Construction, Vol.19, No.2, pp.185-192, 2019. DOI:10.5345/JKIBC.2019.19.2.185.
DOI
|
11 |
Park Jong-Bae, Cho Yong, Kwon Ki-Bum, Paek Joon-Hong, "Feasibility analysis model study of real estate development: focused on construction project development of apartment and stores," Journal of the Architectural Institute of Korea (Structure & Construction), No.3, pp. 179-186, 2008.
|
12 |
Ministry of Employment and Labor, "2019 Industrial accident status," 2020, Available online: https://www.moel.go.kr/policy/policydata/view.do?bbs_seq=20210101255 (accessed on 28 Jun 2021)
|
13 |
Shim Gyubeom and Moon Ji-Sun, "Major issues and countermeasures in Construction industrial safety," Construction & Economy Research Institute of Korea, Nov. 2011. http://www.cerik.re.kr/report/research/detail/1360
|