A Study on Estimation Model of Construction Duration for Public Construction (공공건설공사 공사기간 산정모델에 관한 연구)

  • Kim, Byeong-Soo;Chun, Jin-Ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.142-151
    • /
    • 2005
  • On public constructions, that the first planed projects delay than the scheduled completion day occurrence frequently because gap between the scheduled construction durations and the actual construction durations. These facts connect with not only problems of the construction during as the construction delay but also brought about the distribution costs increase as the failure of facility use plan and the people discomfort weight, failure of the production and the supply using facility then tremendous loss of each part etc. For reduce these loss, it must improve accuracy of the scheduled construction duration estimating when it order. This study try contribute to a successful manage of public project and reduce the construction duration extension frequent of the construction during, and then ensure the suitable construction duration by present the estimation model of the scheduled construction duration that include the construction duration correct element using as an index on the scheduled construction duration estimation.

A Simulation Study on Cardiac Activation Process Using the Three Dimensional Ventricular Model (3차원 심실모델을 이용한 심장의 활성화 과정에 대한 시뮬레이션 연구)

  • Lee, Kyoung-Joung;Park, Gum-Soo;Yun, Hyung-Ro
    • Journal of Biomedical Engineering Research
    • /
    • v.13 no.2
    • /
    • pp.97-106
    • /
    • 1992
  • The cardiac activation process uslng three dimensional ventricular model is simulated. To study this theme, we constructed a cardiac ventricular model and simulated the cardiac activation process using the action potential duration and the activation time. The cardiac ventricular model is generated by the loglcal combination of the elliptic equations. The action potential duration could be obtained from the fact that It Is linearly distributed between model cells. The cardiac activation process was simulated by the law of "all-or-none". Based on the activation time and the action potential duration the cardiac potential at the arbitrary time after the activation of the model cell was computed. To test the validity of model, the comparison of the results of model simulation with the physiological data was performed. In conclusion, this model shows the simular results which is comparable to the 1 Pal conduction of the cardlac excitation.xcitation.

  • PDF

Simulation of the cardiac depolarization based on three dimensional ventricular model. (3차원 심실모델을 이용한 심장의 탈분극 시뮬레이션)

  • Lee, K.J.;Yoon, H.R.
    • Proceedings of the KOSOMBE Conference
    • /
    • v.1992 no.11
    • /
    • pp.146-149
    • /
    • 1992
  • The cardiac depolarization model using three dimensional ventricular model is simulated. To study this theme, we constructed a cardiac ventricular model and simulated the cardiac activation process using the action potential duration and the activation time. The cardiac potential model is generated by the logical combination of the elliptic equations. The action potential duration could be obtained from the fact that it is linearly distributed between model cells. The cardiac activation process was simulated by the law of "all-or-none". Based on the activation time and the action potential duration the cardiac potential at the arbitrary time after the activation of the model cell was computed. To test the validity of model, the comparison the results of model simulation with the physiological data was performed.

  • PDF

Control of Duration Model Parameters in HMM-based Korean Speech Synthesis (HMM 기반의 한국어 음성합성에서 지속시간 모델 파라미터 제어)

  • Kim, Il-Hwan;Bae, Keun-Sung
    • Speech Sciences
    • /
    • v.15 no.4
    • /
    • pp.97-105
    • /
    • 2008
  • Nowadays an HMM-based text-to-speech system (HTS) has been very widely studied because it needs less memory and low computation complexity and is suitable for embedded systems in comparison with a corpus-based unit concatenation text-to-speech one. It also has the advantage that voice characteristics and the speaking rate of the synthetic speech can be converted easily by modifying HMM parameters appropriately. We implemented an HMM-based Korean text-to-speech system using a small size Korean speech DB and proposes a method to increase the naturalness of the synthetic speech by controlling duration model parameters in the HMM-based Korean text-to speech system. We performed a paired comparison test to verify that theses techniques are effective. The test result with the preference scores of 73.8% has shown the improvement of the naturalness of the synthetic speech through controlling the duration model parameters.

  • PDF

Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

A Software Estimating Model for Development Period (소프트웨어 개발기간 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.1
    • /
    • pp.20-28
    • /
    • 2004
  • Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.

A Study on the Variation of the Critical Duration According to Hydrologic Characteristics in Urban Area (도시유역에서 수문학적 특성에 따른 임계지속기간의 변화 연구)

  • Lee, Jung-Sik;Shin, Chang-Dong
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.3 s.18
    • /
    • pp.29-39
    • /
    • 2005
  • The objective of this study is to analyze the relation of critical duration according to hydrologic characteristics in urban areas. RRL, ILLUDAS, SWMM, and SMADA urban runoff models were applied to the Seongnae and Banpo watershed and experiment area of the Dong-Eui University. Also, hydrologic characteristics such as temporal pattern of rainfall, rainfall intensity formula, antecedent moisture condition, return period, and urban runoff model were used to simulate the critical duration of the test areas. The results of this study are as follows; (1) The type of temporal pattern of rainfall which causes maximum peak discharge in urban area has resulted in Huff's 4th quartile distribution. (2) The critical duration in urban areas were not influenced by hydrological factors except urban runoff model. (3) Peak discharge and critical duration in urban areas were influenced by the urban runoff model, and the SWMM model using Huff's 4th quartile distribution shows maximum critical duration.

A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River (낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구)

  • Shon, Tae-Seok;Park, Jae-Bum;Shin, Hyun-Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

A phoneme duration modeling in a speech recognition system based on decision tree state tying (결정트리기반 음성인식 시스템에서의 음소지속시간 사용방법)

  • Koo Myoun-Wan;Kim Ho-Kyoung
    • Proceedings of the KSPS conference
    • /
    • 2002.11a
    • /
    • pp.197-200
    • /
    • 2002
  • In this paper, we propose a phoneme duration modeling in a speech recognition system based on disicion tree state tying. We assume that phone duration has a Gamma distribution. In a training mode, we model mean and variance of each state duration in context-independent phone model based on decision tree state tying. In a recognition mode, we get mean and variance of each context-dependent phone duration form state duration information obtaind during training mode. We make a comparative study of the proposed meth with conventinal methods. Our method results in good performance compared with conventional methods.

  • PDF

OVERALL BENEFIT-DURATION OPTIMIZATION (OBDO) FOR OWNERS IN LARGE-SCALE CONSTRUCTION PROJECTS

  • Seng-Kiong Ting;Heng Pan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.780-785
    • /
    • 2005
  • This paper aims to consider an overall benefit-duration optimization (OBDO) problem for the sake of maximizing owner's economic benefits, whilst considering influences of schedule compression incurred opportunity income on the profitability of a large-scale construction project. Unlike previous schedule optimization models and techniques that have focused on project duration or cost minimization, with greater weight on contractors' interests, OBDO facilitates owner's economic benefits through overall benefit-duration optimization. In this paper, the objective function of OBDO model is formulated. An example is illustrated to prove the feasibility and practicability of the overall benefit-duration optimization problem. The significance of employing OBDO model and future research work are also described.