• Title/Summary/Keyword: due dates

Search Result 227, Processing Time 0.03 seconds

A Real-Time Loading Strategy of Batch Processing Machines for Average Tardiness Minimization (평균납기지연 최소화를 위한 배치생산공정의 실시간 로딩전략)

  • Koo, Pyung-Hoi
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.2
    • /
    • pp.215-222
    • /
    • 2014
  • This paper provides a real-time loading strategy for batch processing machines in which a number of jobs are simultaneously processed as a batch. The batch processing machines can be seen in both manufacturing industries (e.g., semiconductor, automobile and metal working) and service industries (transportation vehicles, mail shipment and theme park). This paper focuses on batch processing machines in semiconductor manufacturing. We present a look-ahead loading strategy for tardiness minimization where future arrivals and due dates are taken into consideration. Simulation tests are performed on the presented strategy and some existing loading heuristics under various production settings with different traffic intensities and forecasting errors. Experimental results show that our strategy provides the performance of good quality.

Algorithms for Production Planning and Scheduling in an Assembly System Operating on a Make-to-Order Basis (주문생산방식을 따르는 조립시스템에서의 생산계획 및 일정계획을 위한 알고리듬)

  • Park, Moon-Won;Kim, Yeong-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.3
    • /
    • pp.345-357
    • /
    • 1998
  • This paper focuses on production planning and scheduling problems in an assembly system operating on a make-to-order basis. Due dates are considered as constraints in the problems, that is, tardiness is not allowed. Since the planning problem is a higher-level decision making than the scheduling problem, the scheduling problem is solved using a production plan obtained by solving the planning problem. We suggest heuristic procedures in which aggregated information is used when the production planning problem is solved while more detailed information is used when the scheduling problem is solved. Since a feasible schedule may not be obtained from a production plan, an iterative approach is employed in the two procedures to obtain a solution that is feasible for both the production planning and scheduling problems. Computational tests on randomly generated test problems are done to show the performance of these algorithms, and results are reported.

  • PDF

A JIT Production Scheduling in Multi-Level Parallel Machine Flow Shops (다단계 병렬기계(多段階 竝列機械) 흐름생산에서 JIT 일정계획)

  • Yoo, Chul-Soo;Lee, Young-Woo;Chung, Nam-Kee
    • IE interfaces
    • /
    • v.7 no.3
    • /
    • pp.171-180
    • /
    • 1994
  • Defined is a Multi-level Parallel Machine Flow-Shop (MPMFS) which reflects some real world manufacturing situations. Just-In-Time (JIT) philosophy is applied to the MPMFS scheduling in order to achieve lowering work-in-process inventory level as well as meeting due dates. A schedule generating simulator is developed. The latest start time of each operation is determined by a backward simulation followed by another forward simulation to analyze the schedule feasibility and actual inventory level. Reasonable schedules are available through adjusting some parameters for allowance factors such as set-up times of machines and other environmental changes. The SLAMSYSTEM under Window is employed for this processing with some input/output data handling processes devised under DOS.

  • PDF

Response evaluation of historical crooked minaret under wind and earthquake loadings

  • Ural, Ali;Dogangun, Adem;Meraki, Sakir
    • Wind and Structures
    • /
    • v.17 no.3
    • /
    • pp.345-359
    • /
    • 2013
  • Turkey has been hosted various civilizations throughout centuries and it has become one of the oldest settlements all over the world due to the geographical location. Therefore, it has accommodated innumerable historical structures remain from the past civilizations. Protection and conservation of these historical constructions should be the major points for continuity of history. Crooked minaret is one of between these historical invaluable structures. It is located at the city of Aksaray and it dates back approximately 800 years. The minaret has lost its vertical position in time and bends on the North-West direction. In this study, general information is given about minarets and some restoration recommendations are given for crooked minaret based on performed some finite element structural analyses. These analyses are considered into three cases; 1-Dead loading, 2-Wind loading, and 3-Earthquake loadings. Results from the analyses are discussed detailed and some useful recommendations are given in the end of the study.

A Design of Integrated Manufacturing System for Compound Semiconductor Fabrication (화합물 반도체 공장의 통합생산시스템 설계에 관한 연구)

  • 이승우;박지훈;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.3
    • /
    • pp.67-73
    • /
    • 2003
  • Manufacturing technologies of compound semiconductor are similar to the process of memory device, but management technology of manufacturing process for compound semiconductor is not enough developed. Semiconductor manufacturing environment also has been emerged as mass customization and open foundry service so integrated manufacturing system is needed. In this study we design the integrated manufacturing system for compound semiconductor fabrication t hat has monitoring of process, reduction of lead-time, obedience of due-dates and so on. This study presents integrated manufacturing system having database system that based on web and data acquisition system. And we will implement them in the actual compound semiconductor fabrication.

Optimal Distribution Strategies by Considering Inbound and Outbound Transportation Costs (입고 출고 수송비용을 고려한 최적 배송전략)

  • Gitae Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.116-123
    • /
    • 2023
  • In supply chain, most partners except the top level suppliers have inbound and outbound logistics. For example, toll manufacturing companies get unprocessed materials from a requesting company and send the processed materials back to the company after toll processing. Accordingly, those companies have inbound and outbound transportation costs in their total logistics costs. For many cases, the company may make the schedule of distributions by considering only the due delivery dates. However, the inbound and outbound transportation costs could significantly affect the total logistics costs. Thus, this paper considers the inbound and outbound transportation costs to find the optimal distribution plans. In addition, we have considered the inventory holding costs as well with transportation costs. From the experimental results, we have provided the optimal strategies for the distributions of replenishment as well as deliveries.

Development of Sunlight Basking Scheduling Service (햇빛쐬기 일정관리 서비스 개발)

  • Ko, Jang Hyok
    • Journal of the Semiconductor & Display Technology
    • /
    • v.22 no.4
    • /
    • pp.76-80
    • /
    • 2023
  • This study is about a service that allows people to naturally learn to bask in the sun, which is a habit to relieve depression. Modern people do not have enough time to bask in the sun due to their busy lives, and as a result, depression and fatigue are increasing day by day. Therefore, in order to relieve depression, there is a need for the development of technology to manage the schedule of sunlight basking so that users can experience sunlight more naturally. The sunlight service developed through this study can help you easily plan your sunlight schedule by recommending good dates, times, and locations for sunbathing. In addition, users can receive coins as much as they bask in the sun, and they can be motivated by the act of basking in the sun by raising their character with those coins.

  • PDF

Induced Voltages on Telecommunication Lines Due to AC High-Speed Electrified Railway System (고속전철에 의한 통신 선로에서의 유도전압 분석)

  • Oh, Ho-Seok;Kang, Seong-Yong;Yun, Ju-Young;Kim, Hak-Chul
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.20 no.9
    • /
    • pp.983-988
    • /
    • 2009
  • This paper analyzed the induced voltages on a telecommunication line due to high-speed a.c. electrified railway system. The induced voltages were measured by domestic regulation, 2 test lines with 2 km length were installed near railway in parallel to compare the influence for distance from disturbing line. The analysis was made on the induced voltages with the distance from railway, line length, and the different earthing point, and also on the waveform and spectrum distributions. The statistical induced voltages for the time for a day and dates was analyzed.

Temperature and Sweet Corn Production at Different Planting Dates under Polyethylene Tunnel and Mulch (파종기와 Polyethylene 필름 피복방법이 단옥수수 생산에 미치는 영향)

  • 이석순;김태주
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.31 no.1
    • /
    • pp.84-90
    • /
    • 1986
  • An experiment was conducted to know the effects of planting dates (March 5, 15, and 25 and April 4) and transparent polyethylene (P.E.) film treatments(tunnel, tunnel slit, and mulch) on air and soil temperatures and growth and yield of a sweet corn variety, Great Bell. Maximum air and soil temperatures and minimum air and soil temperatures were greater at tunnel>tunnel slit>mulch in that order. Differences in maximum air and soil temperatures among the P.E. film treatments were much greater than those in minimum air and soil temperatures. However, when film was opened due to high air temperature over 40$^{\circ}C$ in the tunnel, air temperature was similar but soil temperature was lower com-pared to mulch. High temperature stress could be avoided in tunnel slit without opening film by increase in the number of slits. Cold damage of corn seedlings was avoided by tunnel and reduced by tunnel slit, and frost-damaged seedlings under the mulch were recovered in few days. The number of days from planting to silking was reduced as planting date delayed. At early plantings, tunnel enhanced early growth and silking, but it delayed at late plantings because tunnel was opened during the most of day time due to high temperature. Black streaked dwarf virus(BSDV) disease was more severe at early plantings and it was reduced in tunnel slit at late plantings because plants were grown under the film at the time of infection. The number of marketable ears was similar among all treatments except mulch at March 5 planting where BSDV was severely infected. Gross income was high in tunnel and tunnel slit at March 25 planting which had more larger marketbale ears and tunnel and tunnel slit at March 5 planting which had higher market price.

  • PDF

Methodology for Automate Negotiation for Order Transaction of Injection Mold Manufacturer (사출금형제조업체의 주문처리를 위한 자동협상방법론)

  • 박영재;최형림
    • Journal of Intelligence and Information Systems
    • /
    • v.10 no.1
    • /
    • pp.47-63
    • /
    • 2004
  • Today, there are several markets in cyber space where companies trade electronically due to the development of Information Technology. On the other hand, the most important thing in trades is negotiation. So, in order to support current business practices as well as new ones on the Internet, electronic commerce systems need an ability to negotiate. In this paper, proposed is a method by which a seller can be supported by an agent which plays a role in negotiation process among small and medium companies especially injection mold manufacturer. If the manufacturing capacity cannot afford to produce all orders, the manufacturer may want to extend due dates and the buyers may want to discount prices. The negotiation agent discussed in this paper cooperates with the schedule agent to get due-date information, and performs a role in one (seller)-to-many (buyer) negotiation processes.

  • PDF