• 제목/요약/키워드: drawing management

검색결과 695건 처리시간 0.026초

건설사업관리 분야에서 BIM적용을 통한 도서의 적합성 검토 사례 (A Case Study On The Suitability Of Drawings Through Application Of BIM In Construction Management)

  • 박영진;송경철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.33-34
    • /
    • 2017
  • The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.

  • PDF

린 6시그마 분석을 통한 도면 주기 품질 향상 방안 연구 (A Study on the Quality Improvement of Mechanical Drawing Notes Using Lean 6 Sigma Analysis)

  • 전용구;허형조;이성배;박훈혁;안병국
    • 품질경영학회지
    • /
    • 제48권3호
    • /
    • pp.381-393
    • /
    • 2020
  • Purpose: The purpose of this study was to find useful solutions by analyzing causes and results about defects on mechanical drawing notes and provide an automated tool with solutions to mechanical engineers. Methods: The collected data for defects on mechanical drawing notes were from ongoing development and mass production projects. Various measurement methods were used based on the Lean 6 Sigma analysis such as Process analysis, C&E diagram and some statistical analysis. Results: The results of this study are as follows; The results of the Lean 6 Sigma analysis, the validity of the selected indicators for improving drawing notes quality was verified through the verification of cause variables. The strategy established to improve the mechanical drawing notes was reflected as an automated program, and the defects were within a manageable range and achieved target Sigma level. Conclusion: Through the application of the "Mechanical drawing notes automation tool", it is expected to resolve the "Voice of Customer, VOC" and "Voice of Business, VOB".

Group Technology를 이용한 설계정보관리 시스템의 개발 (The Development of the Drawing Information Management System Based on Group Technology)

  • H.S. Moon;Kim, S.H.
    • 한국정밀공학회지
    • /
    • 제14권1호
    • /
    • pp.58-68
    • /
    • 1997
  • In order to provide economic high-quality products to customers in a timely manner, companies have tried much effort to decrease the time period of engineering design and information management. As a part of this effort, we have developed the Drawing Information Management System(DIMS) based ofn GT(Group Technology) that could decrease design processing time by speedy and rational management of design processes. The characteristics of DIMS are as follows: First, the concept of Concurrent Engineering was applied to DIMS. Through LAN, reviewers are able to attach comments to dlectronic documents by anno- tation functions called Mark-up. The reviewer annotations are collected and combind with the original document to revise the documents. Second, we have developed a Classification and Coding(C&C) system suitable for electronic component parts bassed on GT(Group Technology). The C&C system makes both parts and drawing with similar characteriscs into families and helps users search existing documents or create new drawings promptly. Finally, DIMS provides the Engineering BOM(Bill of Material) using the concept of Family BOM based on model options.

  • PDF

임도 준공도면의 수평위치 정확도 평가에 관한 연구 (Evaluation of Horizontal Position Accuracy in Forest Road Completion Drawing)

  • 김명준;권형근;최윤호;염인환;이준우
    • 농업과학연구
    • /
    • 제37권3호
    • /
    • pp.471-479
    • /
    • 2010
  • Forest roads of 16,424km have been constructed as infrastructure for efficient management of forest. The demand of forest road have been also increased steadily with SOC conception for forest management and wood production. But, accuracy verification by completion drawing of forest road needed aspects extration of geographic information to sound like forest road construction and completion drawing. However, verification for completion drawing has not ascertained. This study carried out the evaluation for position accuracy about constructed forest road in Chungcheongnam-do for evaluating horizontal position accuracy of completion drawing of forest road. In result, first of distance of completion drawing and real route designed completion drawing longer than the real route as Gongju 83m, Seosan 66m, Nonsan 27m and Dangjin 19m, respectively. Second, RMSE by point-correspondence was 11m~14.7m, buffering analysis appeared difference of 18~24m. Finally, index of shape was the similar completion and real route through 6.5~7.4 and data information of forest road corresponds to be perfect. For such reasons, the existing completion drawings have a problem that it cannot use graphic information for drawing digital map according to the regulation, and there is an urgent need for improvement to solve this problem in the process of design and construction.

Application of BIM on Drawing Verification of Firefighting

  • Chang, Ya-Chun;Shr, Jin-Fang;Huang, Xuan-Chao
    • International Journal of Aerospace System Engineering
    • /
    • 제2권2호
    • /
    • pp.15-18
    • /
    • 2015
  • In general, most of the function and using of building is for single purpose. However, current buildings combine several functions that causes a lot of problems not on firefighting only but also on environment engineering. Because of hard integration on different fields that causes a lot of conflict. That wastes cost and time. That also threaten the safety of firefighting. This search focuses on the drawing verification and field inspection on firefighting. These two items both remain paper work. To complete the current work, it needs to bring a great amount of drawing papers in the field. By BIM, integrated data can be extracted. It makes the drawing verification and field inspection easier and increases the efficiency. That is the main point of this research.

노인의 죽음불안과 별-파도 그림 반응특성에 관한 탐색적 연구 (An Exploratory Study on the Elderly's Anxiety Towards Death and their Reactions to the Star-Wave Drawing)

  • 최외선;박인전
    • 가정과삶의질연구
    • /
    • 제25권5호
    • /
    • pp.15-29
    • /
    • 2007
  • The purposes of this study were to examine if there is a relationship between elderly people's anxiety towards death and their reactions to the Star-Wave drawing, and to verify if the Star-Wave drawing was a good enough tool to measure elderly people's degree of death anxiety. The subject for this study were 307 elderly people (male 127, female 180) over 60 years of age with no physical and cognitive damage, who were residing in Geongsan city and attending colleges or welfare centers for the aged. The collected data were analyzed with SPSS WIN(ver. 12.0) program, and factor analysis, correlation analysis, Chi-square test, t-test, one-way ANOVA, and $Scheff\acute{e}$ test were utilized. The results showed that factors showing different levels of anxiety towards death in the Star-Wave drawing were the total harmony of the drawing, drawing style, repetition of wave, size of the star, and location of the star. In particular, the group that drew the Star-Wave drawing with total harmony felt less anxiety towards death than the other group. Therefore, the results of this study suggested a possibility of the Star-Wave drawing to be used as a good tool that could diagnose the elderly's degree of anxiety towards death.

객체지향형 설계정보관리시스템 모델링 (The Object-Oriented Modeling for Drawing Information Management Systems)

  • 오태훈;김선호
    • 한국전자거래학회지
    • /
    • 제1권2호
    • /
    • pp.77-92
    • /
    • 1996
  • In recent years, the manufacturing industry begins to demand the PDM which integarates design and manufacturing information concurrently to reduce the time-to-market of new products. However, current commercialized PDM tools have drawbacks in representing by relational data modeling a variety of data types such as CAD files, images, audio, long text, etc. For this reason, object-oriented approaches are suggested as an alternative. In this paper, using one of object-oriented approaches, Rumbaugh's OMT(Object-Modeling Technique), we propose a data model of drawing information management systems essential for PDM. The scope of the model is limited to the information management for drawings, parts, and product structures. Static, dynamic and functional models are suggested in detail. In the models, the drawing status is classified into on-progress, approved, disposed, and released. Also, parts are classified into products, assemblies, and components.

  • PDF

공동주택에서의 건설정보통합을 위한 실무형 부위별 분류체계 구축에 관한 연구 (The Modeling of the Element Breakdown Structure(EBS) Applicable to Construction Fields for the Integration of the Construction Information in Apartment)

  • 송혁;류성룡;이한민;정환욱;임종성;고성석
    • 한국건설관리학회논문집
    • /
    • 제1권4호
    • /
    • pp.98-105
    • /
    • 2000
  • The drawing information takes the most essential part of construction information. The management of construction information through drawing information facilitates input, output and search process, thus helping maximize the usage of construction information by effectively sharing construction experience and drawing information. This paper shows how construction information can effectively used to increase the productivity of the construction process as a whole. Construction information was extracted and classified by the elements of building which are the basic and very end components of building, to accumulate information of each construction phase. Based on the result, the Element Breakdown Structure(EBS) was developed for the practical usage of construction information integration.

  • PDF

설계변경에 의한 공사비의 증감에 관한 연구 (The Research about Increase and Decrease of the Construction Cost by the Alteration of Design)

  • 임칠순;이규철
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.106-113
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36$\%$) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose tool cost amounts to 2,009,000,000 won (1.37$\%$) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher material cost Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

면접방식에 따른 유아의 기억 정확성 및 피암시성 (The effect of interview techniques on preschool children's memory accuracy and suggestibility)

  • 우현경;이순형
    • 가정과삶의질연구
    • /
    • 제23권1호
    • /
    • pp.209-222
    • /
    • 2005
  • This study was conducted to investigate the effect of interview techniques on memory accuracy and suggestibility of preschool children. Forty-five preschool children participated in a magic show(target event) and 1 week later, all children received suggestive interview in two conditions(language condition & drawing condition). Another 1 week later, all children's recall contents of the magic show was assessed. During suggestive interview, children in drawing condition show more 'acception' response than children in language condition, and children in the question condition show less 'remember' response than children in drawing condition. In second interview children reported more words, and specially ones in language condition report more suggested words than ones in drawing condition. Finally, children's recalls were more accurate on controled informations of the event than on suggestive.