Abstract
In general, most of the function and using of building is for single purpose. However, current buildings combine several functions that causes a lot of problems not on firefighting only but also on environment engineering. Because of hard integration on different fields that causes a lot of conflict. That wastes cost and time. That also threaten the safety of firefighting. This search focuses on the drawing verification and field inspection on firefighting. These two items both remain paper work. To complete the current work, it needs to bring a great amount of drawing papers in the field. By BIM, integrated data can be extracted. It makes the drawing verification and field inspection easier and increases the efficiency. That is the main point of this research.