• Title/Summary/Keyword: divided road

Search Result 320, Processing Time 0.027 seconds

Comparative Study of Truck Traffic System Management for Reducing Air Pollution Impact - Forcusing on Sihwa National Industrail Complex, Siheung City - (교통체계개선에 의한 화물교통 대기오염영향 저감방안 - 시흥시 시화국가산업단지를 중심으로 -)

  • Lee, Hee-Kwan;Kim, Hyung-Chul;Kwon, Woo-Taeg
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.1
    • /
    • pp.23-33
    • /
    • 2006
  • The factor of air pollution in a large industrial city is not only manufactories but also, activities related to trucks. Sihwa National Industrial Complex is located in Siheung City; due to the industries, more diverse activities related to trucks occur in Siheung City than other cities. In particular, the new residential area in Siheung City is close to the industrial complex; so, the damage of this residential area is expected that it would be more serious and vulnerable than other areas. The aim of this study is to analyze influence of the air pollution by a truck in Siheung City. ISCST3 Model and Arc View program were used for this study and Siheung City was divided into 1,000 meter by 1,000 meter grid to analyze. Furthermore, this study suggested two reduction controls of air pollution in Siheung City, and analyzed the results from these reduction managements. The results of the present condition showed that residences located in north of Sihwa Industrial Complex are influenced by air pollution material. Furthermore, air pollution by trucks has affected on the residents which is near the road in Siheung City. Therefore, this study suggested two reduction controls by the Traffic System Management. The first alternative plan is setting the truck traffic limitation zone in the road that is located in south of resident areas and many trucks traffic. Next, the second alternative plan is setting freight truck way on the most traffic road to enter the industrial complex. The reduction effect of the first alternative is good on the residential area. And, the second alternate about freight truck way is divided passenger cars into trucks. Therefore, there are increase of average speed and decrease of average concentration, and spatial reduction effects found in wide areas.

The Road Subsidence Status and Safety Improvement Plans (도로함몰 실태와 안전관리 개선 방안)

  • Bae, Yoon-Shin;Kim, Kyoon-Tai;Lee, Sang-Yum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.545-552
    • /
    • 2017
  • Ground subsidence can result in the formation of sinkholes, potholes, settlement of structures, and road subsidence. Road subsidence is described as the sudden collapse of the road surface into subsurface cavities caused by the loss of bearing capacity in the ground, such as the dissolution of limestone by fluid flow in the surface causing the formation of voids leading to subsidence at the surface. Road subsidence occurs about 665 times annually, and this incidence has been increasing until 2013. Damaged underground facilities, management negligence, and lowering of the ground water table have been the causes of road subsidence in Seoul. Seoul metropolitan government announced special management counter plans to relieve the anxieties and make the roads safe for passing. Construction sites, such as excavation works, need to be managed properly because they have strong potential to induce road subsidence. The aim of this study was to identify the main causes of road subsidence and suggest management plans. First, life cycle cost analysis revealed the daytime construction to be more appropriate than nighttime. In addition, by analyzing the limitations of using sand as a backfill material, it is proposed to use a flowable backfill material instead of sand. Finally, to reduce the blind spots, which is a problem in surveying the road pavement conditions of local governments, the road to be managed is divided into several zones, and a specialized agency is selected for each zone and a method of surveying the blind spots through collaboration is suggested.

Development of Computer Program for the Arrangement of the Forest-road Network to Maximize the Investment Effect on the Forest-road Construction (임도개설(林道開設)에 있어서 투자효과(投資效果)를 최대(最大)로 하는 임도배치(林道配置)프로그램 개발(開發))

  • Park, Sang-Jun;Son, Doo-Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.90 no.4
    • /
    • pp.420-430
    • /
    • 2001
  • The object of this study is to develop a computer program for the arrangement of the forest-road network maximizing the investment effect in forest-road construction with factors such as terrains, forest physiognomy, management plan, logging system, cost of forest-road construction, capacity of inputted labour, capacity of timber production and so on. The operating system developed by this study is Korean Windows 95/98 and Microsoft Visual Basic ver. 5.0. User interface was designed as systematic structure, it is presented as a kind of GUI(graphic user interface). The developed program has result of the most suitable forest-road arrangement, has suitable forest-road density calculated with cost of logging, cost of forest-road construction, diversion ratio of forest-road, cost of walking in forest. And the most suitable forest-road arrangement was designed for forest-road arrangement network which maximized investment effect through minimizing the sum of cost of logging and cost of forest-road construction. Input data were divided into map data and control data. Digital terrain model, division of forest-road layout plan, division of forest function and the existing road network are obtained from map data. on the other hand, cost of logging related terrain division, diversion ratio of forest-road and working road, cost of forest-road construction, cost of walking, cost of labor, walking speed, capacity of inputted labor, capacity of timber production and total distance of forest-road are inputted from control data. And map data was designed to be inputted by mesh method for common matrix. This program can be used to construct a new forest-road or vice forest-road which compensate already existing forest-road for the functional forestry.

  • PDF

A Study on the Evaluation Criteria of Pavement Condition Using Investigation Equipment of Bicycle Road (자전거도로 조사장비를 이용한 포장상태 평가 기준 연구)

  • Kim, Kyungnam;Jo, Shin Haeng;An, Ji Hun;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1125-1131
    • /
    • 2016
  • The purpose of this paper is to establish an evaluation criteria for pavement condition in bicycle road. The suggested criteria would help in the activation policy of bicycle use. The conventional evaluation criteria is difficult to be applied for the bicycle road since the bicycle road is sensitive to changes in the driving environments such as obstacles and bumps. This study presents the evaluation criteria that is suitable for bicycle road. The criteria was suggested in 5 grades through the impact acceleration range of RMSI (Road Monitoring System using ICT). The grades of the criteria are divided into a range of grade A to E. The grade A is a very good condition, while the grade E is a state that requires immediate maintenance. This study were confirmed the validity through the survey of user's satisfaction. According to the results of survey, the grade A was shown correlation of 91%. The grade E requiring immediate repair was presented correlation of 94%. It showed that the results of surveying the bicycle road users are highly correlated with the suggested criteria for pavement condition. It showed that the criteria are highly correlated with the survey results. Suggested criteria using the RMSI is expected to be effective for maintenance of the bicycle road. In addition, it is expected to ensure the serviceability and safety for the bicycle users.

Estimation of Benzene Emissions from Mobile Sources in Korea (국내 이동오염원에서 발생되는 벤젠 배출량 산정)

  • Lee, Ju-Hyoung;Cha, Jun-Seok;Hong, Ji-Hyung;Jung, Dong-Il;Kim, Ji-Young
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.24 no.1
    • /
    • pp.72-82
    • /
    • 2008
  • Benzene is a very harmful and toxic compound known as human carcinogen by all routes of exposure. Owing to the risky feature of benzene, several countries such as Japan, UK and EU have established the ambient air quality standard and protect from that risk of it. Korea also has designated it as one of the criteria air pollutants and established the concentration limit ($5\;{\mu}g/m^3$) in the air and is going to apply the standard from 2010. Benzene is emitted from various sources such as combustion plants, production processes, waste treatment facilities and also automobiles. Mobile source is known as one of the major emission sources of benzene. In this study, we estimated the domestic emissions of benzene from mobile source and compared the results with those of advanced countries. Mobile source was divided into 2 categories, Le., on-road source and non-road source. The total emissions of benzene from mobile source were estimated as 3,106 tons/yr and 1,612 tons/yr was emitted from on-road source and 1,494 tons/yr was from non-road source. Emission ratio of benzene from on-road source showed that 80.0% was from passenger cars, 10.1% was from taxis, 7.2% was from light-duty vehicles, 2.5% was from heavy-duty vehicles and 0.2% was from buses. In the case of non-road source, the distribution showed that 66.3% was from construction machineries, 14.5% was from locomotives, 11.7% was from ships, 7.1% was from agriculture equipments and 0.5% was from aircrafts. The cold-start emissions were estimated as 942 tons/yr and this value was almost 1.5 times greater than that for hot engine emissions (608 tons/yr). In addition, the fuel-based distribution was 65.9%, 31.1% and 2.8% from gasoline, LPG and diesel vehicles, respectively. The emission ratio from mobile source occupied 65% and 30% of total benzene emissions in USA and UK, respectively. In case of Korea, the emission ratio of benzene from mobile source occupied 29% (15% from on-road source, 14% from non-road source) which showed similar value with UK.

The Spatial Statistical Relationships between Road-traffic Noise and Urban Components Including Population, Building, Road-traffic and Land-use (공간통계모형을 이용한 도로 소음과 도시 구성 요소의 관계 연구)

  • Ryu, Hunjae;Park, In Kwon;Chang, Seo Il;Chun, Bum Seok
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.24 no.4
    • /
    • pp.348-356
    • /
    • 2014
  • To understand the relationship between road-traffic noise and urban components such as population, building, road-traffic and land-use, the city of Cheongju that already has road-traffic noise maps of daytime and nighttime was selected for this study. The whole area of the city is divided into square cells of a uniform size and for each cell, the urban components are estimated. A spatial representative noise level for each cell is determined by averaging out population-weighted facade noise levels for noise exposure population within the cell during nighttime. The relationship between the representative noise level and the urban components is statistically modeled at the cell level. Specially, we introduce a spatial auto regressive model and a spatial error model that turns out to explain above 85 % of the noise level. These findings and modeling methods can be used as a preliminary tool for environmental planning and urban design in modern cities in consideration of noise exposure.

Ecological Planning for the Preparation of an Eco-Road on the Pyungtak-Eumsung Highway (평택-음성간 고속도로의 에코로드 조성을 위한 환경생태계획)

  • 강현경;민권식;장종수;한봉호
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.32-42
    • /
    • 2004
  • This study aims at establishing an ecological planning for road construction. which is considered to be a main cause of damage to the natural environment in Korea. This study focuses on the Pyungtak-Eumsung Highway development project. It considers the ecological factors and status of the site and its surrounding area. The study site is a four-way highway with a width of 23.4m and a length of 5.7km that spans from Hyungok-ri, Anseong City, Kyeonggi Province to Jukhyun-ri, Jincheon-gun, Chungbuk Province. The objective of the plan is "the establishment of an eco-road in harmony with nature." The plan is divided into five detailed goals: 1) restoration of river morphology and ecosystem through ecological planning; 2) establishment of wet biotopes; 3) construction of ecological corridors; 4) restoration of damaged forest ecosystems; and 5) ecological restoration of the roadside slopes that are linked with the surrounding forest. A master plan has been developed based on the detailed goals. The master plan involves: 1) establishment of a natural river, wet biotopes, and ecological corridors that facilitate the movement of amphibians, wild fowls, mammalians and fish; 2) development of a planting plan for the visitor center, the tunnel entrance, and soundproof banks; and 3) the presentation of a planting model for restoring roadside slopes that are connected to the surrounding forest. The eco-road plan needs to entail ecological conservation and restoration plans. In addition, a monitoring plan for ecological corridors and habitats should be included in the comprehensive plans, along with the continuous development of environmentally friendly technologies.

Estimation of Rock Drilling Work Size for Mountain Forest Road Construction (산악지(山岳地) 임도시설(林道施設)을 위한 암석천공(岩石穿孔) 작업량(作業量)의 예측(豫測))

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.3
    • /
    • pp.193-199
    • /
    • 1987
  • Simple estimating method of rock drilling and blasting work size is necessary to apply as a guidance of general road plan and a cost analysis of mountain forest road construction. For this work study, 11 cycles were divided in 5km route at Hyeonnammeon Yangyang-gun and the mountain slope at every 20m interval was measured. During working days all kind of works concerned on drilling and blasting was investigated in every cycle. Depending on the simple work study results it's work size can bef estimated with high correlation between drilling length in meter and frequency percentage of mountain slope more than 70%. With total drilling length known the machinery hours, drillers and explosive quantify can be estimated by the regression with high correlation. Estimation of drilling and blasting work by mountain slope gradient in road route is proposed like table 5 with estimating value of machinery hour, drillers and explosive in granite gneiss region.

  • PDF

A Empirical Study on Influence of Safety on Elementary School Road Considering Commuting Distance & Mode Type (통학거리 및 수단특성을 반영한 초등학교 안전도 영향관계 실증연구)

  • Kim, Tae Ho;Kim, Seung Hyun;Lee, Soo Il
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.6
    • /
    • pp.139-147
    • /
    • 2015
  • This study deals with actual commuting distance and influence of risk factors depending on commuting distance and mode in order to reestablish actual commuting zone of primary school students. Data mining analysis(CHAID) was applied for this reestablishment using survey results from 6,927 primary school students in Seoul Metro. Six risk factors; convenience level of commuting path condition, convenience level of road crossing condition, vehicle speed on commuting path, segregation level between commuter and vehicle, congestion level of commuting path, and public security level and two mode; walking and cycle are considered in the analysis. As the results of CHAID analysis, commuting distance was divided into four zones; Internal Zone(0.491km under), External Zone(0.492 ~ 1.492km, 1.493 ~ 2.699km), Commutable Zone(2.70km over), and awareness level on safety is declined as commuting distance is increased. The risk factor affecting on safety is recognized differently by students depending on commuting distance and mode. For students commuting by walking, vehicle speed on commuting path and convenience level of commuting path condition are recognized as the prime risk factor within Internal Zone and Commutable Zone, respectively. For students commuting by cycle, convenience level of road crossing condition and vehicle speed on commuting path are recognized as the prime risk factor within Commutable Zone. Analysis results show that improved plan and program for commuting path for primary school students are required considering actual commuting distance and method.

Development of Traffic Accident Safety Index under Different Weather Conditions (기상특성에 따른 교통사고 안전성 평가지표 개발 (고속도로를 대상으로))

  • Park, Jun-Tae;Hong, Ji-Yeon;Lee, Su-Beom
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.1
    • /
    • pp.157-163
    • /
    • 2010
  • It is well known that weather conditions are closely related with the number and severity of traffic accidents. At present, installation of safety countermeasures including systems is common approach to reduce the damage of traffic accidents at expressways. In this study, the differences of causation factors to influence traffic accidents considering road alignment characteristics and weather conditions. In order to identify the relationship between road and weather conditions, discriminant analysis has been performed with 500 traffic accident data at expressways. Weather conditions are divided into several categories such as snow, sunny, rain, fog, and cloud. Also, road conditions such as types of pavements, grades are analyzed. As the results, major impacting road conditions to traffic accidents are concrete pavement and 3% or more down grades. In these road conditions, visible distance will be reduced and actual braking distances will be increased. This study shows that the expressway sections under concrete pavement and down grades should be more cautious than other sections. It also shows that fog condition is the mose dangerous situation in terms of traffic accidents.