• Title/Summary/Keyword: distortions

Search Result 801, Processing Time 0.026 seconds

Performance Evaluation of Breast Specific Gamma Imaging (Breast Specific Gamma Imaging 장비의 성능평가)

  • Cha, Eun-Sun;Kwak, In-Suk;Noh, Ik-Sang;Yeon, Joon-Ho;Kim, Ki;Choi, Choon-Ki;Seok, Jae-Dong
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.14 no.1
    • /
    • pp.24-27
    • /
    • 2010
  • Purpose: Early diagnosis of breast is of the utmost importance to improve prognosis. We have a limitation for mammography and sonography detecting small cancer. Clinical importance of Breast Specific Gamma Imaging (BSGI) has improved for that reason. So We studied performance evaluation test of count rate and resolution with high sensitivity to the low dose of BSGI. Materials and Methods: BSGI of Dilon 6800, point source of $^{99m}Tc$ from 1.85~148 MBq (0.05~4 mCi) at the intervals of 1.85~37 MBq (0.05~1 mCi) was used for the test. Performance evaluation method was performed for measuring deadtime for choosing at the 5 different point in the useful field of view (UFOV), acquired image for 60 seconds. Compared with reference of clinical uptake distribution of breast, activity increased according to the distance change 10, 20, 30, 40, 50 mm in the useful field of view. Results: Counting curve increased according to the activity from 1.85 MBq (0.05 mCi) to the 74 MBq (2 mCi), and it change flat shape over 74 MBq (2 mCi). The variation of the full width of half maximum (FWHM) to the distance is 4.05, 4.73, 5.77, 6.90, 8.00, 9.32 mm in 1.85 MBq (0.05 mCi), 4.30, 4.80, 5.90, 7.00, 8.10, 9.07 mm in 3.7 MBq (0.1 mCi), 4.90, 5.60, 6.20, 7.20, 8.20, 9.10 mm in 5.55 MBq (0.15 mCi), 5.30, 6.10, 6.60, 7.00, 7.90, 8.70 mm in 7.40 MBq (0.2 mCi). Conclusion: Distortions of image would be acquired because of the deadtime in BSGI. We found out the fact that specification of $^{99m}Tc$ reaction under 74 MBq (2 mCi) for BSGI. Second, FWHM distribution change from varied distance from the detector, clearly distinguished the location of the lesion.

  • PDF

Dual Codec Based Joint Bit Rate Control Scheme for Terrestrial Stereoscopic 3DTV Broadcast (지상파 스테레오스코픽 3DTV 방송을 위한 이종 부호화기 기반 합동 비트율 제어 연구)

  • Chang, Yong-Jun;Kim, Mun-Churl
    • Journal of Broadcast Engineering
    • /
    • v.16 no.2
    • /
    • pp.216-225
    • /
    • 2011
  • Following the proliferation of three-dimensional video contents and displays, many terrestrial broadcasting companies have been preparing for stereoscopic 3DTV service. In terrestrial stereoscopic broadcast, it is a difficult task to code and transmit two video sequences while sustaining as high quality as 2DTV broadcast due to the limited bandwidth defined by the existing digital TV standards such as ATSC. Thus, a terrestrial 3DTV broadcasting with a heterogeneous video codec system, where the left image and right images are based on MPEG-2 and H.264/AVC, respectively, is considered in order to achieve both high quality broadcasting service and compatibility for the existing 2DTV viewers. Without significant change in the current terrestrial broadcasting systems, we propose a joint rate control scheme for stereoscopic 3DTV service based on the heterogeneous dual codec systems. The proposed joint rate control scheme applies to the MPEG-2 encoder a quadratic rate-quantization model which is adopted in the H.264/AVC. Then the controller is designed for the sum of the left and right bitstreams to meet the bandwidth requirement of broadcasting standards while the sum of image distortions is minimized by adjusting quantization parameter obtained from the proposed optimization scheme. Besides, we consider a condition on maintaining quality difference between the left and right images around a desired level in the optimization in order to mitigate negative effects on human visual system. Experimental results demonstrate that the proposed bit rate control scheme outperforms the rate control method where each video coding standard uses its own bit rate control algorithm independently in terms of the increase in PSNR by 2.02%, the decrease in the average absolute quality difference by 77.6% and the reduction in the variance of the quality difference by 74.38%.

Comparison of High Resolution Image by Ortho Rectification Accuracy and Correlation Each Band (고해상도 영상의 정사보정 정확도 검증 및 밴드별 상관성 비교연구)

  • Jin, Cheong-Gil;Park, So-Young;Kim, Hyung-Seok;Chun, Yong-Sik;Choi, Chul-Uong
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.2
    • /
    • pp.35-45
    • /
    • 2010
  • The objective of this study is to verify the positional accuracy by performing the orthometric corrections on the high resolution satellite images and to analyze the band correlation between the high resolution images corrected with orthometric correction. The objectives also included an analysis on the correlation of NDVI. For the orthometric correction of images from KOMPSAT2 and IKONOS, systematic errors were removed in use of RPC data, and non-planar distortions were corrected with GPS surveying data. Also, by preempting the image points at the same positions within ortho images, a comparison was performed on positional accuracies between image points of each image and GPS surveying points. The comparison was also made on the positional accuracies of image points. between the images. For correlation of band and correlation of NDVI, the descriptive statistics of DN values were acquired for respective bands by adding the Quickbird images and Aerial Photographs undergone through orthometric correction at the time of purchase. As result, from a comparison on positional accuracies of Orthoimages from KOMPSAT2 and Ortho Images of IKONOS was made. From the comparison the distance between the image points within each image and GPS surveying points was identified as 3.41m for KOMPSAT2 and as 1.45m for IKONOS, presenting a difference of 1.96m. Whereas, RMSE between image points was identified as 1.88m. The level of correlation was measured by using Quickbird, KOMPSAT2, IKONOS and Aerial Photographs between inter-image bands and NDVI, showing that there were high levels of correlation between Quickbird and IKONOS identified from all bands as well as from NDVI, except a high level of correlation that was identified between the Aerial Photographs and KOMPSAT2 from Band 2. Low levels of correlation were also identified between Quickbird and Aerial Photographs from Band 1. and between KOMPSAT2 and IKONOS from Band 2 and Band 4, whereas, KOMPSAT2 showed low correlations with Aerial Photographs from Band 3. For NDVI, KOMPSAT2 showed low level of correlations with both of QuickBird and IKONOS.

Consistency in the Basic Plan on Electricity Demand and Supply and Social Costs (전력수급기본계획의 정합성과 사회적 비용)

  • LEE, Suil
    • KDI Journal of Economic Policy
    • /
    • v.34 no.2
    • /
    • pp.55-93
    • /
    • 2012
  • In Korea, energy policies are actualized through various energy-related plans. Recently, however, as high-ranking plans, which are very vision-oriented, continually set higher sector-by-sector goals, subordinate action plans, which require consistency, encounter distortions in their establishment process. Also, each subordinate action plan reveals limitations in terms of securing flexibility of the plan in responding to uncertainties of the future. These problems pose potential risks such as causing huge social costs. In this regard, with an aim to provide empirical evidence for discussions on improving the procedure for developing and executing Korea's energy plans, this study mainly analyzes the Basic Plan on Electricity Demand and Supply-one of the most important subordinate action plans-in order to explain the problems of the Basic Plan in a logical manner, and potential problems that could occur in the process of sustaining consistency between the Basic Plan and its higher-ranking plans. Further, this paper estimates the scale of social costs caused by those problems assuming realistic conditions. According to the result, in the case of where maximum electric power is estimated to be 7% (15%) less than the actual amount in the Basic Plan on Electricity Demand and Supply, the annual generation cost will rise by 286 billion won and (1.2 trillion won) in 2020. Such social costs are found to occur even when establishing and executing the Basic plan according to the target goal set by its higher-ranking plan, the National Energy Master Plan. In addition, when another higher-ranking GHG reduction master plan requires the electricity sector to reduce emissions by additional 5% in the GHG emissions from the right mix in electricity generation with 'zero' cost of carbon emission, the annual generation cost will rise by approximately 915 billion won in 2020. On the other hand, the analysis finds that since economic feasibility of electric powers in Korea varies significantly depending on their type, Korea is expected to face very small potential social costs caused by uncertainties over the future price of carbon dioxide in the process of establishing the Basic Plan.

  • PDF

A First-principles Study on the Effects on Magnetism of Si Impurity in BCC Fe by Considering Spin-orbit Coupling (스핀-궤도 상호작용을 고려한 Si 불순물이 BCC Fe의 자성에 미치는 영향에 대한 제일원리연구)

  • Rahman, Gul;Kim, In-Gee;Chang, Sam-Kyu
    • Journal of the Korean Magnetics Society
    • /
    • v.18 no.6
    • /
    • pp.211-216
    • /
    • 2008
  • The effects of Si impurity on electronic structures and magnetism of bcc Fe are investigated by using a first-principles method by considering spin-orbit coupling. In order to describe the Si impurity, a 27 atomic bcc Fe supercell has been considered. The Kohn-Sham equation was solved in terms of the all-electron full-potential linearized augmented plane wave (FLAPW) method within the generalized gradient approximation (GGA). The effects of spin-orbit coupling were calculated self-consistently by considering spin-diagonal terms based on second variation method. For the ferromagnetic (FM) state without considering SOC, the spin magnetic moment of the Si impurity was calculated to be $-0.143{\mu}B$, while the magnetic moments of Fe atoms were calculated to be $2.214{\mu}B$, $2.327{\mu}B$, and $2.354{\mu}B$ in away from the Si atom, respectively. However, the FM state with considering SOC, the spin magnetic moment of the Si impurity was calculated to be $-0.144{\mu}B$, which is not affected significantly by SOC, but the spin magnetic moments of Fe atoms were calculated $2.189{\mu}B$, $2.310{\mu}B$, and $2.325{\mu}B$, respectively, which are much reduced value compared to those of the FM state without SOC. Comparing the total charge density and spin density, those features are thought to be originated by the screening distortions of the Fe $t_{2g}$ orbital, which can be obtained by considering SOC.

Study for practical philosophical counseling (실천적인 철학상담을 위한 연구)

  • Jung, Suk-hyun
    • Journal of Korean Philosophical Society
    • /
    • v.130
    • /
    • pp.305-335
    • /
    • 2014
  • Counseling is conducted through dialogue in relation to counselor and client. Therefore the philosophical counseling first must consider the circumstances, prescribe the main concepts and proceed to the specific methodology in order to be the practical study. The philosophical counseling includes the six necessary concepts-subjects, time, place, object, method, and purpose-because of its behavioral concepts. The subjects are counsellor and client, the place is where public institutions authorize officially for counseling, the time is when the two parties are meeting face to face, the object is the client's facing problems right now, the method is the philosophical assistance, and the purpose is to dissolve the client's problems. The client's facing problems here are the developmental tasks according to the developmental stages and the maladaptive behaviors related to the cognitive distortions appearing in the process. And the philosophical assistance methods are the types to make the facilitating environment and dispute the wrong thoughts and the irrational beliefs. However, the client's problems in counseling often appear in the causes combined between the cognitive elements and the emotive elements which are treated mainly in the psychological counseling. In that case, the way to solve the problems in the philosophical counseling should be applied to with the psychological methods in parallel or in regular succession. Therefore the six necessary concepts of the philosophical counseling are not the absolute meanings but the meanings in general. If so, the concept of the philosophical counseling can be defined as the process in which counselor and client meet face to face and dissolve the client's facing problems through mainly the philosophical methods with the counselor's assistance. If the main concepts of the philosophical counseling can be prescribed as mentioned above, post study needs to proceed to the specific methodology.

A Diagnostic Analysis on the Conservation Status for the Maintenance of the Front Wall of Jungjeongdang Area of Dodong-Seowon (도동서원 중정당 전면 담장의 보수를 위한 진단학적 보존 상태 분석)

  • Kim, Kyu-Yeon
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.1-11
    • /
    • 2019
  • This study was conducted to analyze the conservation status by diagnostical methology for the front wall of Jungjeongdang area of Dodong-Seowon. The study was carried out as photogrammetry and mapping - investigation of materials and conservation status - analysis and evaluation of conservation status. The results are as follows. First, in the case of photogrammetry, each photograph was took in superposition, and the distortions of the photographs were corrected and synthesized. Based on this, actual survey drawings of the wall were prepared. Second, in case of material and conservation status, the wall is in the form of Wapyeondam and the material of the head part are tile, mud and lime, and the material of the body part are mud and tile. The mud was mixed with gravel, sand and straw. At the base part, amorphous natural stones and mud were used. The remarkable damage that appears on the wall is erosion of the base part, and some disintegration appears in the body part. There is a biological patina on the head and the base, and vegetation such as lichen is concentrated on the partial body. There was superficial deposit in the head part, and some tiles were broken or lost. Deep fissures are intensively located in some part of the eastern wall. Third, in the case of analysis and evaluation of the conservation status, it is considered that by the erosion of the foundation part and the disintegration of the body part, there is a possibility that physical damage will continue to be applied to the wall, so immediate action is necessary. The distribution of biological patina and vegetation does not appear to cause great problems in the wall, but it is necessary to reduce it in view of aesthetic problems. A cracked or missing tile would need to be replaced, and deep cracks in the eastern wall appear to have been caused by subsidence, and reinforcement of the underground is necessary to prevent further damage.

Shoulder Replacement Arthroplasty after Failed Proximal Humerus Fracture (상완골 근위부 골절의 치료 실패 후 견관절 치환술)

  • Park, Jin-Young;Seo, Beom-Ho;Lee, Seung-Jun
    • Journal of the Korean Orthopaedic Association
    • /
    • v.54 no.2
    • /
    • pp.110-119
    • /
    • 2019
  • Proximal humerus fracture can be defined as a fracture that occurs in the surgical neck or proximal part of the humerus. Despite the appropriate treatment, however, various complications and sequelae can occur, and the treatment is quite difficult often requiring surgical treatment, such as a shoulder replacement. The classification of sequelae after a proximal humerus fracture is most commonly used by Boileau and can be divided into two categories and four types. Category I is an intracapsular impacted fracture that is not accompanied by important distortions between the tuberosities and humeral head. An anatomic prosthesis can be used without greater tuberosity osteotomy. In category I, there are type 1 with cephalic collapse or necrosis with minimal tuberosity malunion and type 2 related to locked dislocation or fracture-dislocation. Category II is an extracapsular dis-impacted fracture with gross distortion between the tuberosities and the humeral head. To perform an anatomic prosthesis, a tuberosity osteotomy should be performed. In category II, there are type 3 with nonunion of the surgical neck and type 4 with severe tuberosity malunion. In type 1, non-constrained arthroplasty (NCA) without a tuberosity osteotomy should be considered as a treatment. On the other hand, reverse shoulder arthroplasty (RSA) should be considered if types 1C or 1D accompanied by valgus or varus deformity or severe fatty degeneration of the rotator cuff. In general, the results are satisfactory when NCA is performed in type 2 sequelae. On the other hand, RSA can be considered as an option when there is no bony defect of the glenoid and a defect of the rotator cuff is accompanied. In type 3, it would be effective to perform internal fixation with a bone wedge graft rather than shoulder replacement arthroplasty. Recent reports on the results of RSA are also increasing. On the other hand, recent reports suggest that good results are obtained with RSA in type 3. In type 4, RSA should be considered as a first option.

Study on data preprocessing methods for considering snow accumulation and snow melt in dam inflow prediction using machine learning & deep learning models (머신러닝&딥러닝 모델을 활용한 댐 일유입량 예측시 융적설을 고려하기 위한 데이터 전처리에 대한 방법 연구)

  • Jo, Youngsik;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.1
    • /
    • pp.35-44
    • /
    • 2024
  • Research in dam inflow prediction has actively explored the utilization of data-driven machine learning and deep learning (ML&DL) tools across diverse domains. Enhancing not just the inherent model performance but also accounting for model characteristics and preprocessing data are crucial elements for precise dam inflow prediction. Particularly, existing rainfall data, derived from snowfall amounts through heating facilities, introduces distortions in the correlation between snow accumulation and rainfall, especially in dam basins influenced by snow accumulation, such as Soyang Dam. This study focuses on the preprocessing of rainfall data essential for the application of ML&DL models in predicting dam inflow in basins affected by snow accumulation. This is vital to address phenomena like reduced outflow during winter due to low snowfall and increased outflow during spring despite minimal or no rain, both of which are physical occurrences. Three machine learning models (SVM, RF, LGBM) and two deep learning models (LSTM, TCN) were built by combining rainfall and inflow series. With optimal hyperparameter tuning, the appropriate model was selected, resulting in a high level of predictive performance with NSE ranging from 0.842 to 0.894. Moreover, to generate rainfall correction data considering snow accumulation, a simulated snow accumulation algorithm was developed. Applying this correction to machine learning and deep learning models yielded NSE values ranging from 0.841 to 0.896, indicating a similarly high level of predictive performance compared to the pre-snow accumulation application. Notably, during the snow accumulation period, adjusting rainfall during the training phase was observed to lead to a more accurate simulation of observed inflow when predicted. This underscores the importance of thoughtful data preprocessing, taking into account physical factors such as snowfall and snowmelt, in constructing data models.

The Abuse and Invention of Tradition from Maintenance Process of Historic Site No.135 Buyeo Gungnamji Pond (사적 제135호 부여 궁남지의 정비과정으로 살펴본 전통의 남용과 발명)

  • Jung, Woo-Jin
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.35 no.2
    • /
    • pp.26-44
    • /
    • 2017
  • Regarded as Korea's traditional pond, Gungnamj Pond was surmised to be "Gungnamji" due to its geological positioning in the south of Hwajisan (花枝山) and relics of the Gwanbuk-ri (官北里) suspected of being components to the historical records of Muwang (武王)'s pond of The Chronicles of the Three States [三國史記] and Sabi Palace, respectively, yet was subjected to a restoration following a designation to national historic site. This study is focused on the distortion of authenticity identified in the course of the "Gungnamji Pond" restoration and the invention of tradition, whose summarized conclusions are as follows. 1. Once called Maraebangjuk (마래방죽), or Macheonji (馬川池) Pond, Gungnamji Pond was existent in the form of a low-level swamp of vast area encompassing 30,000 pyeong during the Japanese colonial period. Hong, Sa-jun, who played a leading role in the restoration of "Gungnamji Pond," said that even during the 1940s, the remains of the island and stone facilities suspected of being the relics of Gungnamji Pond of the Baekje period were found, and that the traces of forming a royal palace and garden were discovered on top of them. Hong, Sa-jun also expressed an opinion of establishing a parallel between "Gungnamji Pond" and "Maraebangjuk" in connection with a 'tale of Seodong [薯童說話]' in the aftermath of the detached palace of Hwajisan, which ultimately operated as a theoretical ground for the restoration of Gungnamj Pond. Assessing through Hong, Sa-jun's sketch, the form and scale of Maraebangjuk were visible, of which the form was in close proximity to that photographed during the Japanese colonial period. 2. The minimized restoration of Gungnamji Pond faced deterrence for the land redevelopment project implemented in the 1960s, and the remainder of the land size is an attestment. The fundamental problem manifest in the restoration of Gungnamji Pond numerously attempted from 1964 through 1967 was the failure of basing the restorative work in the archaeological facts yet in the perspective of the latest generations, ultimately yielding a replication of Hyangwonji Pond of Gyeongbok Palace. More specifically, the methodologies employed in setting an island and a pavilion within a pond, or bridging an island with a land evidenced as to how Gungnamji Pond was modeled after Hyangwonji Pond of Gyeongbok Palace. Furthermore, Chihyanggyo (醉香橋) Bridge referenced in the designing of the bridge was hardly conceived as a form indigenous to the Joseon Dynasty, whose motivation and idea of the misguided restoration design at the time all the more devaluated Gungnamji Pond. Such an utterly pure replication of the design widely known as an ingredient for the traditional landscape was purposive towards the aesthetic symbolism and preference retained by Gyeongbok Palace, which was intended to entitle Gungnamji Pond to a physical status of the value in par with that of Gyeongbok Palace. 3. For its detachment to the authenticity as a historical site since its origin, Gungnamji Pond represented distortions of the landscape beauty and tradition even through the restorative process. The restorative process for such a historical monument, devoid of constructive use and certain of distortion, maintains extreme intimacy with the nationalistic cultural policy promoted by the Park, Jeong-hee regime through the 1960s and 1970s. In the context of the "manipulated discussions of tradition," the Park's cultural policy transformed the citizens' recollection into an idealized form of the past, further magnifying it at best. Consequently, many of the historical sites emerged as fancy and grand as they possibly could beyond their status quo across the nation, and "Gungnamji Pond" was a victim to this monopolistic government-led cultural policy incrementally sweeping away with new buildings and structures instituted regardless of their original space, and hence, their value.