• Title/Summary/Keyword: development projects

Search Result 3,616, Processing Time 0.03 seconds

Rural Village Development Project Model on Target for Strengthening Culture of Place (장소의 문화화를 타겟으로 한 농촌마을 권역종합정비사업 모델 - 영천시 가상권역 사업을 중심으로 -)

  • Han, Sung-Mi;Eom, Boong-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.1
    • /
    • pp.165-177
    • /
    • 2013
  • This study deals with rural village development project of Gasangri, Yeongcheon city area, based on the use of the cultural factors and strengthening them in study area. Unlike other cases of today's Korean rural village development projects, this plan keenly concerns not only for tourists but also for the village people. Since culture means the quality of life also, this project especially deals with 'community', 'well-being', and 'convenience' for the inhabitants. On the other hand, it attempts to connect with "Cyan Museum", which is the first grade art gallery remodelled from closed school, to make village of culturally abundant atmosphere. In result, seven sub-projects of the expansion of basic living foundation, and two improvement of landscape in area have planned. Among stereotype of rural development projects and similar programs of tourism, the project makes difference on targeting for the meaning and resource of place culture.

Direct Runoff Reduction Analysis and Application Feasibility Evaluation of Vegetation-type Facilities (식생형시설의 직접유출량 저감 효과분석 및 적용 방법 타당성 검토)

  • Hanyong Lee;Won Hee Woo;Youn Shik Park
    • Journal of Korean Society of Rural Planning
    • /
    • v.30 no.2
    • /
    • pp.69-77
    • /
    • 2024
  • As impervious area increases due to urbanization, rainfall on the impervious area does not infiltrate into the ground, and stormwater drains quickly. Low impact development (LID) practices have been suggested as alternatives to infiltrate and store water in soil layers. The practices in South Korea is applied to urban development projects, urban renewal projects, urban regeneration projects, etc., it is required to perform literature research, watershed survey, soil quality, etc. for the LID practices implementation. Prior to the LID implementation at fields, there is a need to simulate its' effect on watershed hydrology, and Storm Water Management Model (SWMM) provides an opportunity to simulate LID practices. The LIDs applied in South Korea are infiltration-based practices, vegetation-based practices, rainwater-harvesting practices, etc. Vegetation-based practices includes bio-retention cell and rain garden, bio-retention cells are mostly employed in the model, adjusting the model parameters to simulate various practices. The bio-retention cell requires inputs regarding surface layer, soil layer, and drain layer, but the inputs for the drain layer are applied without sufficient examination, while the model parameters or inputs are somewhat influential to the practice effects. Thus, the approach to simulate vegetation-based LID practices in SWMM uses was explored and suggested for better LID simulation in South Korea.

Improvement for Marine Environmental Impact Assessment on the Coastal Development Project Type (연안개발사업 유형에 따른 해양환경영향평가 개선방안)

  • Kim, In-Cheol;Jeon, Kyeong-Am;Kim, Gui-Young;Eom, Ki-Hyuk;Kim, Young-Tae;Choi, Bo-Ram
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.2
    • /
    • pp.157-164
    • /
    • 2014
  • This paper suggested the improvement of marine environmental impact assessment of different types of project by analyzing the consultation on the coastal area utilization(133cases) of the coastal development project for 4years(2010-2013). According to the analysis results, the erosion protection project needs to precede the accurate analysis of erosion reasons, predict exactly possible problems and establish the systematic system to verify the effect of erosion protection by monitoring after projects. The construction projects of revetments and coastal roads have to require to sublate, examine the reliability in structures, give consideration to the problems of coastal erosion by increase of reflected waves. In addition, flooding protection projects have got to require to select the waves for evaluation items in conjunction with the effects of abnormal waves. furthermore, waterfront construction projects need to establish comprehensive and methodical space plans and reinforce the review to conserve the natural environment and conduct nature-friendly development. There are many problems inherently related to coastal development Project. To these problems, however, it is required to support the project on the side of the legislation and conduct additional studies reflecting the characteristics by sea areas and projects.

A Study of Practical Strategies for Cooperative Rural Community Regeneration in Geochang (거창군 협업형 마을만들기 실천전략 연구)

  • Oh, Hyung-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.5
    • /
    • pp.87-99
    • /
    • 2015
  • Prior hardware-centered rural development projects implemented top-down rural community regeneration via the local government in accordance with central government agency policies. To improve this, software-centered projects have been promoted since 2000. With central agency-led rural development projects changing into local government-led ones, rural community regeneration has been built per village. Although rural community regeneration projects appear to have implemented a bottom-up development currently, the top-down development procedures being facilitated by the intervention of administrative institutions have not disappeared. In this regard, the purpose of this research thesis is to effectively perform bottom-up development methods that go one step further from the current process of rural community regeneration. As the research site, this thesis selected Geochang, which has difficulties in being steadily maintained and operated despite the development of various rural community regeneration projects. Subsequently, it determined the current status and substantial analysis of a project of the rural community regeneration in Geochang through 1:1 interviews with civil servants in charge of administration as well as conducted a prior study on rural resident awareness of rural community regeneration through a survey of village head members and in-depth interviews with rural residents. Based on these data, a 10 times-round table conference was held under the participation of pertinent civil servants, professionals and rural residents to select practical strategies for cooperative rural community regeneration in Geochang as five key areas: local food, culture & welfare, rural villages, community development, and urban and rural interchanges. In addition, it is considered that the project of building villages must be implemented by establishing steadfast administrative co-operation systems, strengthening rural residents' participation capacities and supporting professionals' systemic integrated operation and maintenance. By doing so, this research thesis sought to determine practical strategies in the cooperative rural community regeneration in Geochang. It is expected that bottom-up development rural community regeneration will be built and introduced in each rural community in the future.

A strategy for the Introduction and Development of BIM Technology in the Construction Industry (기획특집 - BIM기술 도입 및 단계별 발전 전략)

  • Choi, Cheol-Ho
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.5
    • /
    • pp.23-28
    • /
    • 2009
  • BIM technology has been introduced in various fields of the construction industry recently. The owners of the public construction projects are already interested in BIM technology and they started to apply BIM technology in their projects. This paper introduces the successful BIM cases of overseas and domestics projects and shows how to introduce and apply BIM technology in the architectural design firms and construction companies and how to train their engineers with BIM technology.

  • PDF

Development of Standard Agreement for a School Complex Project (학교시설 복합화를 위한 표준협약서 개발)

  • Park, Sung-Chul;Park, Hee-Won;Jung, Tae-Hwan
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.13 no.2
    • /
    • pp.1-12
    • /
    • 2014
  • A school building complex means building both the learning spaces of students and convenience space of community within school lands. The projects have has a positive effect on saving the national budget as well as expanding the learning spaces. The absence of standard agreement contracted through discussion of participants, however, has made many problems in the operated projects. Through analysis on the previous researches and conference, the paper finds main problems discussed in the operating step. And, the feasibility study is carried out in order to analyze the appropriateness of on the existing agreements on the problems. Finally, the paper presents the standard agreement for the school building complex projects. The practitioners can prevent the existing problems from new projects through using the proposed agreement. Furthermore, it is expected that the school building complex projects will be activated.

Development of a Descriptive Cost Effectiveness Model for a Subcontractor with Limited Resources

  • Kim, Dae Young
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.40-48
    • /
    • 2017
  • It only takes one failed project to wipe out an entire year's profit, when the projects are not managed efficiently. Additionally, escalating costs of materials and a competitive local construction market make subcontractors a challenge. Subcontractors have finite resources that should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. The objective of this thesis is to identify the effect of productivity changes on the total cost resulting from shifting crews across projects using a descriptive model. To effectively achieve the objective, this study has developed a descriptive cost model for a subcontractor with multi-resources and multi-projects. The model was designed for a subcontractor to use as a decision-making tool for resources allocation and scheduling. The model identified several factors affecting productivity. Moreover, when the model was tested using hypothetical data, it produced some effective combinations of resource allocation with associated total costs. Furthermore, a subcontractor minimizes total costs by balancing overtime costs, tardiness penalties, and incentive bonus, while satisfying available processing time constraints.

A Study on the Development of PMO Cost Estimation Model (PMO 대가 산정모형의 개발)

  • Seo, Yong Won;Lee, Duck Hee
    • Journal of Information Technology Services
    • /
    • v.13 no.4
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

Development of Proteomics and Applications of Proteomics in Toxicology

  • Jung, Woon-Won;Huh, Yoon-Ee;Ryu, Jae-Chun;Lee, Eun-Il;Sul, Dong-Geun
    • Molecular & Cellular Toxicology
    • /
    • v.1 no.1
    • /
    • pp.7-12
    • /
    • 2005
  • Proteomics has recently received intense scientific interest after the completion of the Human Genome Project, because this genome-based high technology allows to search new drug targets or diagnostic markers. Many proteome projects including Human plasma proteome projects (HPPP), Human liver proteome projects (HLPP), Human brain proteome projects (HBPP), and Mouse and Rat Proteome Project (MRPP) have been carried out and proteomic analytical techniques have been developed in second dimensional electrophoresis (2-DE) and LC/MS system. This powerful method has been applied in toxicology producing a new term "Toxicoproteomics". In this review, recent proteome projects, proteomic technologies, and toxicoproteomics will be discussed.

Development of An Information System for SOC Projects (SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.