Development of a Descriptive Cost Effectiveness Model for a Subcontractor with Limited Resources

  • Received : 2017.09.18
  • Accepted : 2017.09.19
  • Published : 2017.09.30

Abstract

It only takes one failed project to wipe out an entire year's profit, when the projects are not managed efficiently. Additionally, escalating costs of materials and a competitive local construction market make subcontractors a challenge. Subcontractors have finite resources that should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. The objective of this thesis is to identify the effect of productivity changes on the total cost resulting from shifting crews across projects using a descriptive model. To effectively achieve the objective, this study has developed a descriptive cost model for a subcontractor with multi-resources and multi-projects. The model was designed for a subcontractor to use as a decision-making tool for resources allocation and scheduling. The model identified several factors affecting productivity. Moreover, when the model was tested using hypothetical data, it produced some effective combinations of resource allocation with associated total costs. Furthermore, a subcontractor minimizes total costs by balancing overtime costs, tardiness penalties, and incentive bonus, while satisfying available processing time constraints.

Keywords

References

  1. Du, J., Leung, J. Y. T. (1990). Minimizing total tardiness on one machine is NP-Hard, Mathematics of Operations Research, 15(3), 483-495 https://doi.org/10.1287/moor.15.3.483
  2. Hanna, A. S., Taylor, C. S., Sullivan, K. T. (2004). Impact of Extended Overtime on Construction Labor Productivity, J. Constr. Engrg. and Mgmt., ASCE, 131(6), 734-739.
  3. Hegazy, T., Wassef, N. (2001). Cost optimization in projects with repetitive nonserial activities, J. Constr. Engrg. and Mgmt., ASCE, 127(3), 183-191. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(183)
  4. Hinze, J. (2004). Construction Planning & Scheduling, 2nd ed, Pearson/Prentice Hall, Upper Saddle River, NJ.
  5. Horner, R. M. W., Talhouni, B. T. (1995). Effects of accelerated working, delays, and disruptions on labour productivity, Chartered Institute of Building, Ascot, Berkshire, U.K.
  6. Jiang, G, Shi, J. (2005). Exact Algorithm for Solving Project Scheduling Problems under Multiple Resource Constraints, J. Constr. Eng. Manage., ASCE, 131(9), 986- 992. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:9(986)
  7. Lu, M., Li, H. (2003). Resource-activity critical-path method for construction planning, J. Constr. Eng. Manage., ASCE, 129(4), 412- 420. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(412)
  8. Moselhi, O., E. R, K. (1993). Scheduling of repetitive projects with cost optimization, J. Constr. Engrg. Mgmt., ASCE, 119(4), 681- 697. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:4(681)
  9. Nkasu, M. M., Leung, K. H. (1997). A resources scheduling decision support system for concurrent projects management, Int. J. Prod. Res., 35(11), 3107-3132. https://doi.org/10.1080/002075497194318
  10. O'Brien, W. J. (2000). Multi-project resource allocation: parametric models and managerial implications, Eighth Annual Conference of the International Group for Lean Construction, University of Sussex, Brighton, United Kingdom, July 17-18
  11. O'Brien, W. J., Fischer M. A. (2000). Importance of capacity constraints to construction cost and schedule, J. Constr. Engrg. and Mgmt., ASCE, 126(5), 366-373. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(366)
  12. Reda, R. (1990). RPM: Repetitive project modeling, J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316-330. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:2(316)
  13. RS Means. (2005). RS Means Building Construction Cost Data, 63rd Edition, RS Means, Kingston, MA, USA.
  14. Song, C. (2005). Multi-resource allocation across multi projects by subcontractor, Master thesis, University of Florida.
  15. Suhail, S., Neale, R. (1994). CPM/LOB: New methodology to integrate CPM and line of balance, J. Constr. Engrg. and Mgmt., ASCE, 120(3), 667-684. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:3(667)
  16. Thabet, W. J., Beliveau, Y. J. (1994). Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings, J. Constr. Engrg. and Mgmt., ASCE, 120(1), 96-116. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(96)
  17. Yang, B., Geunes, J., O'Brien, W. J. (2005). A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling, Computers & Operations Research, 31, 1273-1301.