• Title/Summary/Keyword: design-build project

Search Result 221, Processing Time 0.023 seconds

THE LYMAN-α IMAGING SOLAR TELESCOPE (LIST) ON THE KOREA SCIENCE AND TECHNOLOGY SATELLITE-2 (STSAT-2)

  • JANG M.
    • Journal of The Korean Astronomical Society
    • /
    • v.36 no.spc1
    • /
    • pp.145-149
    • /
    • 2003
  • LIST is the Lyman-$\alpha$ Imaging Solar Telescope, a project funded by the Korean government to fly on the second Korean Science and Technology research Satellite (STSat-2) due to launch in December 2005. The Principal Investigator is Dr. Minhwan Jang of Kyung-Hee University and of the Space Payload Research Center (SPARC), a consortium of Korean universities and institutions formed to develop scientific research projects in space. The purpose of the LIST project is to design, build, and operate an instrument on STSat-2 which will make images of the Sun from Earth orbit at the wavelength of the Hydrogen Lyman-a emission line at 121.6 nm. LIST has a simple design concept comprised of a small telescope to image the full disk of the Sun onto a CCD detector and a set of filters to isolate the 121.6 nm wavelength.

BRAWII: Business Process Modeling Tool for BPR (BRAWII: BPR을 위한 업무흐름모형과 도구)

  • 박성주;김한섭;김상구;한동욱
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.289-293
    • /
    • 1998
  • Two reasons for the low success rate of the practical implementation of BPR are the lack of good models and consideration of information system development stage in a BPR project. This paper suggests an Integrated Business Process Model (IBPM), which incorporates two distinct but interrelated points of view: form and business process. By integrating the form model with the business process model, the IBPM has advantages in performing BPR projects; it helps to build the model, to analyze and redesign business processes, and to do requirement analysis of information systems. This paper also suggests a new BPR supporting tool, BRAWII(Business Reengineering Assistance Workbench version 2.0). BRAWIIsupports IBPM and manages full stages of BPR project. In the design of BRAWII, the linkage between results of a BPR project and requirements for information system development is considered.

  • PDF

COMPARISON OF THREE PCM PERFORMANCE EVALUATION SYSTEMS IN TAIWAN

  • Wen-der Yu ;Yen-ping Hsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.719-724
    • /
    • 2005
  • It has been debating on the performance evaluation of professional construction management (PCM) services since its introduction to Taiwan's construction industry more than a decade ago. Several evaluation systems were proposed by previous researchers. However, there has no comparison study been conducted for the feasibility, effectiveness, and appropriateness of these systems to the performance management (PM) of practical PCM services. This paper is intended for this end to compare the existing PCM performance evaluation systems in Taiwan. A real world design/build (D/B) building project was selected for case study. The result of case study concludes and compares the pro's and con's of the three systems. At the end, it recommends strategies for selecting the most appropriate PCM performance evaluation for PCM services.

  • PDF

Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

Analysis of Data and Information Flow for Pipeline in Permafrost Area

  • Won, Seo-Kyung;Lee, Do-Yun;Lee, Junbok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.744-745
    • /
    • 2015
  • Since the G20 summit in 2011, South Korea who was dependent on foreign energy needs of 97% receives natural gas from Russia from 2015 to 30 years, but South Korea is a situation of scarce experience and skills of pipeline project in permafrost area. In this study, we kept the target for analyzing the data and information flow of the pipeline projects in permafrost area, and the ultimate goal is set to developing the hierarchy structure of design and construction data for an efficient administration of the project. In order to develop that structure, Configuration Management was introduced and through this method, it is expected to be used to build the overall information management system in O&M phase.

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

A Study on the Establishment of Evaluation Strandards for the Rolling-stock Design of the Next-Generation High-Speed Railway (차세대 고속철도 차량디자인 평가기준 구축을 위한 연구)

  • Lee, Jun-One;Lee, Young-Yeob
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.437-443
    • /
    • 2009
  • Generally speaking, the uniqueness of Korea for the high-speed railway rolling-stock is mainly perceived through the travel over the high-speed electric railway by passengers, which consists of the organization of space in the coach and its interior design. For such purpose, it is necessary to build a series of independent cultures with high-speed railway i.e. to have the development of design technologies oriented to harmonizing human beings, their society and culture with the systematic integration of production technologies to support the culture and its substructure foundation which constitute the frame of superstructure in the society, by defining the relationships with travelers on the high-speed railway as well as enhancing the comfort and convenience of high-speed railway through drawing up the development of links with the systematic integration among lines of technologies on the basis of 'User Train Interface. This thesis aims at introducing the study carried out to build the evaluation standards of performance outputs for 'HEMU-400X rolling-stock Design' derived from the performance for the first year in the research 'Development of Technologies for the Next-Generation High-Speed Railway' as part of "Development Project for the Future Railway Technologies" from 2007.

  • PDF

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

Application of Artificial Neural Network Model for Environmental Load Estimation of Pre-Stressed Concrete Beam Bridge (PSC Beam교 환경부하량 추정을 위한 인공신경망 모델 적용 연구)

  • Kim, Eu Wang;Yun, Won Gun;Kim, Kyong Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.82-92
    • /
    • 2018
  • Considering that earlier stage of construction project has a great influence on the possibility of lowering of environmental load, it is important to build and utilize system that can support effective decision making at the initial stage of the project. In this study, we constructed an environmental load estimation model that can be used at the early stage of the project using basic design factors. The model was constructed by using the artificial neural network to estimate environmental load by applying to planning stage (ANN-1), basic design stage (ANN-2). The result of test, shows that average of absolute measuring efficiency and standard deviation of ANN-1 and ANN-2 were 11.19% / 5.30% and 9.59% / 3.09% each. This result indicates that the model using the input variables extended with the project progress has high reliability and it is considered to be effective in decision support at the initial design stage of the project.

A Study of Developing Graduate Student Team Project-based Learning Program in the Science and Technology Field Applying Metaverse Technology (메타버스를 활용한 이공계 대학원생 팀 프로젝트 기반 교육 프로그램 개발 사례 연구)

  • Jeon, Juhui;Kim, Marie;Kim, Bokyung;Kang, Kyuri
    • Journal of Engineering Education Research
    • /
    • v.26 no.6
    • /
    • pp.19-29
    • /
    • 2023
  • This study aims to develop and apply a metaverse-based instructional design model for the education in science and technology. It analyzed the concept and characteristics of metaverse, existing non-contact education models, and major teaching strategies systematically. Based on the prior researches, an instructional design model using metaverse is developed that presents metaverse-related teaching strategies and design principles for the before-, during-, and after-lesson phases. Then, this model was applied to a project-based learning program, conducted a perception survey on instructors and learners, and revised the metaverse instructional design model based on the results of the survey. In the Metaverse Instructional Design Model, before-lesson phase is a physical and psychological preparation stage for class participation, which includes familiarization with the Metaverse learning environment, formation of expectations for education, and self-directed pre-learning. During the lesson, to effectively deliver the lesson content, it is necessary to build confidence in the learning environment, promote learning participation, provide reference materials, perform team projects and provide feedback, digest learning content, and transfer learning content. The after-lesson phase provides strategies for ongoing interaction between learners and mentors. This study introduces a new instructional design model that utilizes metaverse and shows the potential of metaverse-based education in science and technology. It also has important implications in that it provides practical guidelines for the effective design and implementation of metaverse-based education.